HomeMy WebLinkAbout2015-05-27 15-184 ORDERCOUNCIL ACTION
Item No. 15-184
Date: May 27, 2015
Item/Subject: ORDER, Authorizing Bid Award in the Amount of $1,392,650 to
Sargent Corporation for Trench Drains/GA Apron
Responsible Department: Airport
Commentary:
On May 5, 2015, the City received two (2) bids for Trench Drains/GA Apron. The bid prices ranged
from $1,392,650 to $1,567,440 (see attached bid tabulation).
This is an Airport Improvement Plan (AIP) funded project. The project cost is funded 90% with
Federal funds, 5% State funds and 5% Airport funds. In order to obtain the AIP grant funds, the
City must bid the work and award the contract. This information is then submitted to the FAA for
execution of the grant document.
This item will be reviewed by the Finance Committee on May 18, 2015.
The contract award recommendation must be reviewed approved by the City Council as it is over
$100,000.
Manager's Comments:
Associated Information:
Bid Tabulation
Budget Approval:
Legal Approval:
Introduced for
X Passage
First Reading
Referral
Department Head
City Manager
Finance Director
Page _ of _
Assigned to Councilor Baldacci
CITY OF BANGOR
15-184
MAY 27,.2015
(TITLE.) Order, Authorizing Bid Award in the Amount of $1,392,650 to Sargent
Corporation for Trench Drains/GA Apron
By the City Council of the City of Bangor.•
ORDERED,
THAT, Deborah Cyr, Finance Director. is hereby authorized to execute a contract
with Sargent Corporation in the amount of $1,392,650 for Trench Drains/GA
Apron.
IN CITY COUNCIL
MAY 27, 2015
PASS
CITY CLERK
15-184
MAY 27, 2015
City of Bangor
Bangor International Airport - AIP #067
Bid Tabulation: ASR Mitigation Phase II - Replace Gates 4 & 6 Trench Drains and Reconstruct GA Apron - South Entrance
Bid Opening: May 5, 2015
Lane Construction
Cheshire CT
Sargent Corporation
Stillwater, ME
ITEM NO.
DESCRIPTION
Est.Unit
QTY.
UNIT
Price
Amount
Unit
Price
Amount
ASR Mitigation Phase II
G-001-1
Safety and Phasing
1
LS
$ 65,000.00
$65,000
$ 74,500.00
$74,500
G-001-2
Contractor Provided Construction Barricades
135
EA
$
220.00
$29,700
$ 250.00
$33,750
G-001-3
Contractor's Safety Plan Compliance Document
1
LS
$
5,000.00
$5,000
$ 6,500.00
$6,500
G-002-1
As -Built Plans
1
FLS
$
3,000.00
$3,000
$ 3,000.00
$3,000
M-001-1
Mobilization
1
LS
$ 25,000.00
$25,000
$ 25,000.00
$25,000
M-002-1
Saw and Seal Pavement Joints
3,800
LF
$
6.00
$22,800
$ 6.00
$22,800
M-003-1
Contaminated Soil Removal and Replacement
10
CY
$
150.00
$1,500
$ 175.00
$1,750
P-152-1
Unclassified Excavation
225
CY
$
30.00
$6,750
$ 18.00
$4,050
P-152-3
Pavement Removal
1,550
SY
$
10.00
$15,500
$ 28.00
$43,400
P-152-5
Trench Drain Removal
360
LF
$
225.00
$81,000
$ 60.00
$21,600
P-152-7
Pipe Removal
30
LF
$
35.00
$1,050
$ 20.00
$600
P-153-1
Controlled Low Strength Material
10
CY
$
150.00
$1,500
$ 200.00
$2,000
P-154-1
Subbase Course
280
CY
$
45.00
$12,600
$ 38.00
$10,640
P-156-2
Environmental Monitoring
1
LS
$ 25,000.00
$25,000
$ 6,500.00
$6,500
P-209-1
Crushed Aggregate Base Course
545
CY
$
60.00
$32,700
$ 52.00
$28,340
P-401-1
HMA Surface Course PG64-28
350
TON
$
125.00
$43,750
$ 150.00
$52,500
P-501-1
Portland Cement Concrete Pavement
510
SY
$
255.00
$130,050
$ 250.00
$127,500
P-603-1
Bituminous Tack Coat
120
Gal
$
12.00
$1,440
$ 15.00
$1,800
P-608-1
Emulsified Asphalt Seal Coat
1,150
SY
$
12.00
$13,800
$ 12.00
$13,800
P-620-1
Permanent Runway and Taxiway Marking
740 1
SF
$
1.50
$1,110
$ 1.50
$1,110
P-620-2
Temporary Runway and Taxiway Marking
100
SF
$
1.50
$150
$ 1.50
$150
D-701-1
12 inch Reinforced Concrete Pie Class
230
LF
$
80.00
$18,400
$ 501.00
$11,500
D-701-3
14 inch Ductile Iron Pie
70
LF
$
120.00
$8,400
$ 220.00
$15,400
D-705-1
6 inch Pi a underdrains, Complete
350
LF
$
40.00
$14,000
$ 20.00
$7,000
D-705-2
Cleanout, Complete
4
EA
$
1,200.00
$4,800
$ 750.00
$3,000
D-751-2
5' Diameter Catch Basin
5
EA
$
8,000.00
$40,000
$ 7,000.00
$35,000
D-751-3
4' Diameter Catch Basin
2
EA
$
7,000.00
$14,000
$ 6,500.00
$13,000
ASR Mitigation Phase II - Replace Gates 4 & 6 Trench Drains - Bid Summary
$618,000
$566,190
Reconstruct GA Apron South Entrance - Base Bid
G-001-1
Safety and Phasing
1
LS
$ 65,000.00
$65,000
$ 15,000.00
$15,000
G-001-2
Contractor Provided Construction Barricades
120
EA
$
220.00
$26,400
$ 250.00
$30,000
G-001-3
Contractor's Safety Plan Compliance Document
1
LS
$
5,000.00
$5,000
$ 6,500.00
$6,500
G-002-1
As -Built Plans
1
FLS
$
3,000.00
$3,000
$ 3,000.00
$3,000
M-001-1
Mobilization
1
LS
$ 25,000.00
$25,000
$ 34,000.00
$34,000
M-001-2
Engineer's Field Office
1
LS
$
3,600.00
$3,600
$ 15,000.00
$15,000
M-002-1
Saw and Seal Pavement Joints
1,900
LF
$
10.00
$19,000
$ 8.00
$15,200
M-003-1
Contaminated Soil Removal and Replacement
10
CY
$
150.00
$1,500
$ 175.00
$1,750
M-004-1
Hazardous Material Removal
1
AL
$
5,000.00
$5,000
$ 5,000.00
$5,000
P-152-1
jUnclassified Excavation
200
CY
$
35.00
$7,000
$ 18.00
$3,600
P-152-3
1 Pavement Removal
9,000
SY
$
2.50
$22,500
$ 9.00
$81,000
P-152-4
jDrainage Structure Removal 1
1
EA
$
4,000.00
$4,0001
$ 750.00 1
$750
15-184
MAY 27, 2015
City of Bangor
Bangor International Airport - AIP #067
Bid Tabulation: ASR Mitigation Phase II - Replace Gates 4 & 6 Trench Drains and Reconstruct GA Apron - South Entrance
Bid Opening: May 5, 2015
Total Bid Summary I I 1 1 $1,567,440 $1,392,650
Lane Construction
Cheshire CT
Sargent Corporation
Stillwater, ME
P-152-6
Foundation Removal
1
EA
$
6,000.00
$6,000
$ 3,000.00
$3,000
P-152-8
Electrical Conduit Removal
135
LF
$
8.00
$1,080
$ 8.00
$1,080
P-154-1
Subbase Course
10
CY
$
65.00
$650
$ 38.00
$380
P-156-1
Inlet Protection
7
EA
$
200.00
$1,400
$ 400.00
$2,800
P-156-2
Environmental Monitoring
1
LS
$ 25,000.00
$25,000
$ 4,500.00
$4,500
P-209-1
Crushed Aggregate Base Course
2,050
CY
$
61.00
$125,050
$ 52.00
$106,600
P-401-1
HMA Surface Course PG64-28
2,250 1
TON
$
103.00
$231,750
$ 116.00
$261,000
P-603-1
Bituminous Tack Coat
950
Gal
$
8.00
$7,600
$ 10.00
$9,500
P-608-1
Emulsified Asphalt Seal Coat
9,000
SY
$
2.20
$19,800
$ 2.50
$22,500
P-620-1
Permanent Runway and Taxiway Marking
2,550
SF
$
1.50
$3,825
$ 1.50
$3,825
P-620-2
Temporary Runway and Taxiway Marking
2,900
SF
$
1.00
$2,900
$ 1.00
$2,900
P-620-3
Marking Removal
1,740
SF
$
1.50
$2,610
$ 2.00
$3,480
D-701-2
15 inch Reinforced Concrete Pie Class
400
LF
$
100.00
$40,000
$ 52.00
$20,800
D-705-1
6 inch Pipe Underdrains, Complete
325 1
LF
$
50.00
$16,250
$ 24.00
$7,800
D-705-2
Cleanout, Complete
1
EA
$
1,200.00
$1,200
$ 750.00
$750
D-751-1
6' Diameter Catch Basin
1
EA
$ 10,000.00
$10,000
$ 10,000.00
$10,000
D-751-3
4' Diameter Catch Basin
2
EA
$
7,000.00
$14,000
$ 6,500.00
$13,000
L-108-1
No. 8 AWG, 5 kV, L-824, Type C Cable, Installed in Conduit
575
LF
$
6.00
$3,450
$ 3.00
$1,725
L-110-1
Concrete -Encased Electrical Conduit, 2" One-way
130
LF
$
70.00
$9,100
$ 20.00
$2,600
L-858-1
Existing Sign on New Foundation
1
EA
$
6,000.00
$6,000
$ 15,000.00
$15,000
Reconstruct GA Apron South Entrance - Base Bid Summary
$714,665
$704,040
Reconstruct GA Apron South Entrance - Add. Alt. #1
G-001-1
Safety and hasing
1
LS
$ 30,000.00
$30,000
$ 1,500.00
$1,500
M-001-2
As -Built Plans
1
FLS
$
500.00
$500
$ 500.00
$500
M-003-1
Contaminated Soil Removal and Replacement
10
CY
$
150.00
$1,500
$ 175.00
$1,750
P-152-2
Rock Excavation
10
CY
$
300.00
$3,000
$ 200.00
$2,000
P-152-4
Drainage Structure Removal
4
EA
$
4,000.00
$16,000
$ 750.00
$3,000
P-152-7
Pipe Removal
925
LF
$
70.00
$64,750
$ 10.00
$9,250
P-156-1
Inlet Protection
1
EA
$
200.00
$200
$ 400.00
$400
P-209-1
Crushed Aggregate Base Course
35
CY
$
60.00
$2,100
$ 52.00
$1,820
P-401-1
HMA Surface Course PG64-28
35
TON
$
215.00
$7,525
$ 250.00
$8,750
P-603-1
Bituminous Tack Coat
5
Gal
$
10.00
$50
$ 10.00
$50
D-701-4
24 inch HDPE Pie
925
LF
$
60.00
$55,500
$ 62.00
$57,350
D-751-3
4' Diameter Catch Basin
1
EA
$
7,000.00
$7,000
$ 6,500.00
$6,500
D-7514
Drain Manhole
3
EA
$
7,000.00
$21,000
$ 7,000.00
$21,000
T-901-1
Seeding
1,900 1
SY
$
0.50
$950
$ 0.50
$950
T-905-1
ITopsoiling
1,900
SY
$
13.00
$24,7001
$ 4.00
$7,600
Reconstruct GAApron South Entrance - Add. Alt. #1 Bid Summary
$234,775
$122,420
Total Reconstruct GA Apron South Entrance (Base Bid + Add Alt #1) Bid Summary
$949,4401
$826,460
Total Bid Summary I I 1 1 $1,567,440 $1,392,650