HomeMy WebLinkAbout2015-07-27 15-252 ORDERCOUNCIL ACTION
Item No. 15-252
Date: July 27, 2015
Item/Subject: ORDER, Authorizing Contract Award in the Amount of $108,756 to ADS
Environmental Services for the Sewer Flow Monitoring Program
Responsible Department:
Commentary:
Waste Water Treatment Plant
This order will authorize a contract award to ADS Environmental Services in the amount of
$108,756 to provide equipment and technical assistance with the sewer flow monitoring
program. Since 2010, the City has contracted with ADS Environmental, Inc., (ADS) for
monitoring and analyzing flow data from our combined sewer overflow structures and various
other points in the sewer collection system. This contract includes monitoring, analyzing the
data and providing a monthly report for ten locations. The monthly report is forwarded to
USEPA after staff review. This contract also includes a comprehensive service schedule to
ensure the meters are working properly. We have a very good working relationship with ADS
and recommend the City continue this contract for another year.
This item is schedule to be reviewed by the Finance Committee earlier this evening.
If recommended for passage, this item comes forward for Council action, as the contract award
is over $100,000.
Manager's Comments:
Associated Information:
Agreement
Budget Approval:
Legal Approval:
Introduced for
X Passage
First Reading
Referral
Department Head
City Manager
Finance Director
-A�q
City S icitor
Page _of_
Assigned to Councilor Sprague
CITY OF BANGOR
15-252
JULY 27, 2015
(TITLE.) Order, Authorizing Contract Award in the Amount of $108,756 to ADS Environmental
Services for the Sewer Flow Monitoring Program
By the City Council of the City of Bangor.•
ORDERED,
THAT, Deborah Cyr, Finance Director is hereby authorized to execute a contract
and purchase order to ADS Environmental Services in the amount of $108,756 for
sewer flow monitoring.
IN CITY COUNCIL
JULY 27, 2015
PASSED
CITY CLERW
15-252
JULY 27, 2015
ENVIRONMENTAL
SERWOES'
EXHIBIT A
June 19, 2015
City of Bangor, ME
Wastewater Treatment Plant
Long Term CSO and Temporary Metering Programs
EXHIBIT A
Scope of Work
ADS will provide meter maintenance at 5 existing CSO and 5 temporary 1/1 metering
locations in the City of Bangor, ME. Michael Armes, Sr. Project Manager, will be
designated as the immediate contact for this project. The services include the following:
1.0 Site Specific Equipment
ADS has provided the FlowShark CG for the AC powered locations and the FlowShark
AG for the battery powered CSO locations. These ADS meters include depth and
velocity sensors to measure overflow duration and volume. FlowShark Triton meters
have been installed at the 1/1 locations.
2.0 Data Transmission
Data is transmitted to the Bangor Wastewater Treatment Facility by radio communication
at 3 locations. The ADS FlowShark CG provides two 4:20 mAmp output signals to Client
supplied radios. Radio system maintenance will continue to be the responsibility of the
Client. Two locations use the FlowShark AG with battery power and no radio
communication at this time. Both the FlowShark CG and AG are equipped with wireless
modems and AT&T SIM cards. FlowShark Triton meters are installed at 5 locations and
all use wireless 2G GSM modem with AT&T SIM cards for data transmission.
3.0 Power, Data Management and SCADA interface
Power —The ADS FlowShark CG meters have AC power modules that are connected to
supplied AC power. The FlowShark AG operates with internal DC 12v battery with life
expectancy of approximately 6 months depending on the cellular communication
strength. The FlowShark Triton also utilizes DC 12v with battery life expectancy of 12
months.
Radio Transmission - The FlowShark CG has two 4:20 mAmp outputs for transmission
of flow and (for example) depth. The Client supplied radio system is connected for
transmission to the host system. The FlowShark CG and AG meters also have wireless
modems. This allows ADS to do a remote access and diagnostic as well as remote data
downloads.
15-252
JULY 27, 2015
Data Analysis Support — ADS will review all data and monthly reports presenting data
for all 10 meters will be available in IntelliServe and on the ADS FlowView Portal website
where data can be downloaded and printed.
4.0 Maintenance and Service
We have included a line item for comprehensive field service during this year of
operation. Comprehensive service will allow ADS to:
■ verify the meters are operating correctly
■ allow for service visits should there be meter communication problems
■ clean sensors and make adjustments if necessary
■ provide all spares parts necessary for proper meter operation
2
15-252
JULY 27, 2015
EXHIBIT B
SERVICE BY OWNER
Owner agrees to perform the following functions in connection with the Agreement:
1. Coordination with Project Manager: Owner agrees to coordinate as required
with the ADS Project Manager and to provide information in a timely manner to
ensure that implementation schedules are met. Specifically, as outlined in
Exhibit A, Task 2.0, the following are required:
a. GIS Data. Owner agrees to provide GIS data to the level of detail
required for GIS displays in IntelliServe.
b. Third Party Data. Owner agrees to provide all Third Party Monitor data
(Rain Gauge) in a format acceptable to ADS.
2. Interface: Owner agrees to make no changes in the equipment or software that
would preclude ADS from being able to interface via telephone with Owner's
ADS flow monitoring equipment unless agreed to by ADS in writing.
3. Assistance: Owner shall not to make repairs or perform maintenance or attempt
to do so on the equipment unless authorized by ADS.
4. Electronic Access: Owner agrees to allow ADS to address the system
electronically for purposes of running diagnostics tests and performing other
functions in the course of this maintenance phase of the project.
6. Telephone Charges: Monthly AT&T access fees are included in the costs
proposal.
6. Permits: Owner agrees to provide all licenses and permits necessary for ADS to
perform the work, if required.
7. Access: Owner agrees to provide ADS with access to the flow monitoring sites
on public and private lands including sufficient area for placement of personnel
and equipment, including all rights-of-way and ramp, if required. This includes,
but is not limited to, exposing manholes, clearing easements and/or constructing
roads or ramps suitable for truck/van, if necessary, and pump station access.
8. Pump Stations: Owner agrees to provide personnel to manually operate pump
stations when maintenance or repair of a flow monitor requires.
9. Electric Charges. Owner assumes responsibility for monthly electric charges to
power the ADS FlowShark meters.
10. Line Cleaning. Owner agrees to provide line cleaning for lines that require
cleaning to improve the operation of the flow monitoring equipment.\
15-252
JULY 27, 2015
EXHIBIT C
ADS'S COMPENSATION -FLOWSHARK CG, AG AND TRITON METER SERVICE
ITEM
•
UNIT
PRICE
TOTAL
1.) Field Maintenance and Data
Analysis of 10 ADS Meters,
July 1, 2015 — Jun 30, 2016
a.)Field Maintenance—
Comprehensive, full ADS
12 months
$5,938
$71,256
crew and all equipment
b.) Data Analysis and Reporting
12 months
$2,295
$27,540
2.) IntelliServe Web Hosting —
10 meter locations, July 1,
2015 — Jun 30, 2016
10 meters
a.) IntelliServe monthly service
x 12
$480
$5,760
months
b.) AT&T 2G SIM — 5
5 meters x
FlowSharks —Jul 1, 2015-
12 months
$35/month
$2,100
Jun 30, 2016
c.) AT&T 2G SIM — 5 Tritons —
5 meters x
$35/month
$2,100
Nov 1, 2015 — Jun 30, 2016
12 months
TOTAL
$108,756
*Pricing Assumptions:
• No prevailing wage or W/MBE required;
• Federal, State, or Local taxes or permit fees not included;
• Standard ADS safety and installation methodology
• Standard traffic control requirements (cones & simple signs)
• Bangor DPW will provide traffic support for high volume roadways like downtown
area
4
In Witness Whereof, the Parties hereto have executed this Agreement, on this
Customer:
By:
Title:
ADS:
By:
Title:
15-252
JULY 27, 2015
day of , 200_
Date Signed: Date Signed: