HomeMy WebLinkAbout2015-05-11 15-159 ORDERCOUNCIL ACTION Item No. 15-159 Date: May 11, 2015 Item/Subject: ORDER, Authorizing Bid Award in the Amount of $912,343 to B&B Paving for the Broadway Resurfacing Project Responsible Department: Engineering Commentary: On April 22, 2015, the City received three (3) bids for the Broadway Resurfacing Project. The bid prices ranged from $912,343 to $1,086,403 (see attached bid tabulation). This project is to resurface 2.6 miles of Broadway beginning on the in town side of Husson Avenue outbound. The recommendation is to award the low bidder, B&B Paving in Hermon for $912,343. This project is wholly funded with State and Federal funds. This bid was reviewed and recommended for approval at the Finance Committee meeting of May 4, 2015. The contract award recommendation must be reviewed approved by the City Council as it is over $100,000. Manager's Comments: Associated Information: Bid Tabulation Budget Approval: Legal Approval: Introduced for X Passage First Reading Referral Department Head Cda (no, (,y�C- City Manager Finance Director Page _ of _ Solicitor Assigned to Councilor Sprague CITY OF BANGOR 15-159 MAY 11, 2015 (TITLE.) Order, Authorizing Bid Award in the Amount of $912,343 to GB & B Paving for the Broadway Resurfacing Project By the City Council of the Glty of Bangor.• ORDERED, THAT, Deborah Cyr, Finance Director is hereby authorized to execute a contract with B & B Paving in the amount of $912,343 for the Broadway Resurfacing. IN CITY COUNCIL MAY 11, 2015 PASSED aJ �-✓vaG CITY CLERK City of Bangor Bid Tabulation RFS: Broadway Resurfacing Project Bid Opening: 04-22-15 15-159 MAY 11, 2015 Lane Construction Bangor ME B & B Paving Hermon ME Pike Industries Fairfield ME Item Description Qty. Unit Unit Price Total Price Unit Price Total Price Unit Price Total Price 1 202.202 Removing Pavement Surface 61,000 SY 2.70 164 700.00 1.78 108 580.00 1.70 103 700.00 2 202.203 Removing Pavement - Butt Joint 500 SY 14.00 7,000.00 12.00 6,000.00 14.00 7,000.00 3 203.20 Common Excavation 140 CY 18.00 2,520.00 16.00 2,240.00 17.00 2,380.00 4 203.210 Rock Excavation 5 CY 1.00 5.00 100.00 500.00 5.00 25.00 5 204.410 Shoulder Rehab 1,671 SY 10.00 16 710.00 12.00 20 052.00 13.00 21 723.00 6 211.300 Ditch Excavation 3 162 LF 8.00 25 296.00 7.00 22 134.00 7.50 23 715.00 7 304.14 3/4" Crushed Stone Agg 20 CY 100.00 2,000.00 100.00 2,000.00 115.00 2,300.00 8 304.08 Aaaregate Base Course - Gravel 180 CY 45.00 8100.00 44.00 7,920.00 45.00 8,100.00 9 403.213 1/2" Hot Mix Asphalt 780 TON 92.00 71 760.00 86.00 67 080.00 105.00 81 900.00 10 403.208 1/2" Hot Mix Asphalt 5,135 TON 71.00 364 585.00 79.00 405 665.00 94.00 482 690.00 11 403.209 3/8" Hot Mix Asphalt Sidewalks Drives Incidentals 122 TON 145.00 17,690.00 170.00 20,740.00 160.00 19,520.00 12 403.211 Hot Mix Asphalt Leveling Coarse 300 TON 83.00 24 900.00 102.00 30 600.00 108.00 32 400.00 13 409.15 Bituminous Tack Coat Applied 2,200 GAL 7.50 16 500.00 5.00 11,000.00 6.50 14 300.00 14 603.169 15" Culvert 80 LF 130.00 10 400.00 100.00 8,000.00 115.00 9,200.00 15 604.092 Catch Basin Tupe BI -C 7 VF 700.00 4,900.00 685.00 4,795.00 750.00 5,250.00 16 605.11 12" Type C Underdrain 234 LF 45.00 10 530.00 42.00 9,828.00 45.00 10 530.00 17 609.38 Vert Curb Type -1 Granite Remove & Reset 762 LF 20.00 15 240.00 21.00 16 002.00 7.00 5,334.00 18 609.31 Curb Type 2 - Concrete LF 15.00 46 860.00 13.00 40 612.00 5.00 15 620.00 19 610.09 RipRa CY 100.00 1,000.00 113.00 1,130.00 120.00 1,200.00 20 613.319 Jutt Matting SY 3.00 4,215.00 2.50 3,512.50 3.00 4,215.00 21 615.07 Loam CY 45.00 18 000.00 40.00 16 000.00 40.00 16 000.00 22 618.13 SeedingMethod No. 1 K42,100 EA 22.00 1,100.00 20.00 1,000.00 22.00 1,100.00 23 619.12 Mulch Fiber or Straw EA 22.00 1,100.00 20.00 1,000.00 22.00 1,100.00 24 627.7114" White or Yellow Pavement Markin Line LF 0.20 8 420.00 0.16 6 736.00 0.22 9 262.00 25 627.75 White or Yellow Pavement & Curb Markin SF 1.50 2,241.00 2.00 2,988.00 1.75 2,614.50 26 629.05 Hand Labor 10 MH 40.00 400.00 34.00 340.00 50.00 500.00 27 631.12 All Purpose Excavator 10 1 MH 1 140.00 1,400.00 110.00 1,100.00 155.00 1,550.00 28 631.172 Truck - Large 10 MH 80.00 800.00 68.00 680.00 85.00 850.00 29 645.X0( Remove & Reset Sin 14 EA 100.00 1,400.00 100.00 1400.00 300.00 4,200.00 30 652.36 Maintenance of Traffic 1 LS 81 600.00 81 600.00 39 136.00 39 136.00 142 000.00 142 000.00 31 652.38 Flagger 1,500 MH 20.00 30 000.00 18.00 27 000.00 16.75 25 125.00 32 659.10 Mobilization 3% 1 LS 26 000.00 26 000.00 26 573.00 26 573.00 31 000.00 31 000.00 Total Bid Amounti $987,372.00 $912,343.50 $1,086,403.50