HomeMy WebLinkAbout2015-04-13 15-128 ORDERCOUNCIL ACTION
Item No. 15-128
Date: April 13, 2015
Item/Subject: ORDER, Authorizing Execution of Agreement for Maine Department of Transportation
Local Project — WIN 20232.42, Broadway Mill and Fill Project
Responsible Department: Engineering
Commentary: This order would authorize the City Manager to execute a Local Project Agreement in the
amount of $450,000.00 with the Maine Department of Transportation for design, construction work for a
project on Broadway (Route 15B) beginning at the intersection of Broadway and Stillwater Avenue and
extending northerly approximately 0.43 miles to Center Street. The work to consist of a two inch mill
and fill with ADA and drainage improvements. If approved the agreement stipulates a State share of
225,000.00 or 50% of the total project costs and a City share of $225,000.00 or 50% of the total project
cost. This item was reviewed and recommended for approval by the Infrastructure Committee at its
March 24, 2015 meeting.
John M. Theriault, City Engineer
Department Head
Manager's Comments:
City Manager
Associated Information: Councilor Order and Agreement
Budget Approval:
Finance Director
Legal Approval:
City Solicitor
Introduced for
X Passage
First Reading Page _ of _
Referral
Assigned to Councilor Plourde
CITY OF BANGOR
15-128
APRIL 13, 2015
(TITLE.) ORDER, Authorizing Execution of Agreement for Maine Department of
Transportation Local Project — WIN #20232.42, Broadway Mill and Fill Project
ORDERED,
THAT: the City Manager is hereby authorized and directed to execute an agreement with the
Maine Department of Transportation for the following:
An Agreement with the Maine Department of Transportation — Broadway Mill and Fill
Project, WIN #20232.42
Copy of the agreement is attached.
IN CITY CLERK
APRIL 13, 2015
PASSED
CITY CLERI
15-128
APRIL 13, 2015
Internal Use Qnty _..._^
TEDOCS If:
CT#:
CSN#i
STATE OF MAINE DEPARTMENT OF TRANSPORTATION
.MUNICIPAL PARTNERSHIP :AGREEMENT
WIN 20232.42
REGARDING
BROADWAY MILL AND FILL PRCIJECT, BANGOR
This Cooperative Agreement (AGREEMENT) is entered into by and between the MAINE
DEPARTMENT OF TRANSPORTATION ("MaineDOT"), an agency of state government with its
principal administrative offices located on Child Street, Augusta, .Maine, and the CITY OF BANGOR
("Bangor"), a;municipality in the State of Maine with. offices located at 73 HARLOW STREET,
BANGOR, ME.
WHEREAS, Bangor shall oversee the design and construction of a project on Broadway (Route 15B)
beginning at the intersection of Broadway and Stillwater Avenue and extending northerly
approximately .0,43 miles to Center Street. The work will consist of a 2 inch mill .and fill with ADA.
and :drainage improvements Bangor estimates the total cost of this :project to be $450,000..00.
BANGOR SHALL:
A. Shall procure and oversee a project on Broadway for the work outlined above.
B. Perform such work in accordance with a design by an engineer licensed in the State of Maine.
The Licensed Engineer shall provide a certification to the Municipality and to MaineDOT that,
in his/her professional opinion, the Project as designed.will provide a smooth ride, not reduce
the safety, mobility or structural quality of the state [state aid] road, All design documents
must be stamped and signed in accordance with this provision by the Professional Engineer.
C. Agree to secure. all necessary Federal, State and Local permits necessary to complete the work.
Bangor also agrees to. secure.any needed property rights in accordance with all applicable State
and Federal.Laws..
D. Agree that any exceptions to State Design. Standard, s shall be documented as part of this
process. This docurnentation shall compare, the new design to the existing conditions for each
of the exceptions to current design standards. Any such. exceptions shall 'be displayed on the
cover sheet for the Project. plans with the signature and PE stamp of the engineer responsible
for the design of the Project.
E. Be responsible, within the Project limits, for'the following;
Rev: 7/30110.
15-128
APRIL 13, 2015
a. Ensuring that the safety of the corridor and the life of the resulting structural and design
elements are equal to or better than existing conditions and design;
b. Ensuring that the structures; roadways .and/or design features affected by the Project.
work shall, at a minimum, be of equal dimensions to the existing features or structures
and shall be of improved quality in terms of materials and utility;
c. Ensuring that the Project does not introduce any unanticipated safety hazards to the
traveling public;.
d. Ensuring that. the Project retains the same level .of mobility or 'improves mobility of
travel within the corridor; and,
e. Ensuring that the Project does not. in any manner decrease the life expectancy of this
component of Maine's transportation system.
f. Ensure the project meets the most recent Americans with Disabilities Act of 1990
(ADA) design requirements.
F., Provide certification through their Engineer to MaineDOT that the project is complete and was
constructed as designed.
G. Commence construction within twelve: (12) months and shall be certified complete within
twenty four (24) months of execution of this agreement. Bangor may forfeit the unpaid balance
of this.grant if these.deadlines are not met or they can not demonstrate earnest and good faith
efforts to meet them.
MAINEDOT SHALL:
A. Provide a maximum of $225,000:00 in State funds supporting the project work stated above
in initiative monies. Reimbursement will be made by the Department at a minimum of 1/3 project
completion upon receipt of supporting cost documentation from the Municipality. Payments will be
made per Appendix .A, attached. The Department's Region Engineer shall review the costs and
certify their eligibility prior to reimbursement to the Municipality. Payment by Maine 0-
Municipal. Partnership Initiative funds shall not exceed 50% of the actual costs incurred. and paid
by the Municipality or $225,000.00,
The City of Bangor and MaineDOT agree to function within all applicable laws, statutes, regulations,
and AGREEMENT provisions; avoid hindering each other's performance; fulfill all obligations
diligently; and cooperate in achievement of the intent of this AGREEMENT.
Rev, 7130/10
15-128
APRIL 13, 2015
IN WITNESS WHEREOF, the parties hereto have executed this AGREEMENT in. duplicate
effective on the. day and date last signed.
15-128
APPENDIX A
PROJECT SCOPE AND COST SHARING
MAINE DEPARTMENT OF TRANSPORTATION
Municipal Partnership Initiative Project
MUNICIPALITY OF Bangor
PROPOSED. IMPROVEMENTS TO:tadway Route 15
.STATE PROJECT IDENTIFICATION NUMBER (WIN) 2023'2.42
Proiect Scope: t inch mill and fill with drainage and A—D pedestrian ramp .improvements
Funding Outline: The Total Project Estimated Cost is $45QL00.L0,1and the Parties agree to share costs through all stages of the Project under the
terms outlined below.
Municipal. Share
Work Element
State Share Total Cost
% $
$.
Project Costs50
2251,000.00
50 225;000.00 450,-00.00
PROJECT SHARES
225,000.00
225,000.00 450,000.00
Total Cost of Additional 100%
Work above agreement
estimate
TOTAL ESTIMATED
MUNICIPAL
225,000.00
REIMBURSEMENT
15-128
REIMBURSEMENT SCHEDULE:.
DESGINEXCEPTIONS REQUIRED: L7IYES fX' NO
Design exceptions
ions where required
red . for this
s project. Please see, attached approyal :M:from Chief Engineer out ; I , irung,design exceptions.