Loading...
HomeMy WebLinkAbout2016-04-11 16-152 ORDERCOUNCIL ACTION Item No. 16-152 Date: April 11, 2016 Item/Subject: ORDER, Authorizing Bid Award in the Amount of $164,700 to Vaughn D. Thibodeau II, Inc for Maine Avenue Sewer Reconstruction Responsible Department: Engineering Commentary: On April 6, 2016, the City received six (6) bids for the Maine Avenue Sewer Reconstruction project. The bid prices ranged from $164,700 to $423,550 (see attached bid tabulation). This project is part of the work associated with the Wayfair building to reroute the service from under the building as well as to rebuilt a portion of the line. The actual bid is below the budgeted construction estimate of $266,000. This item is schedule to be reviewed by the Finance Committee earlier this evening. If recommended for passage, this item comes forward for Council action, as the contract award is over $100,000. Department Head Manager's Comments: (!aA City Manager Associated Information: Bid Tabulation Budget Approval: Finance Director Legal Approval: City Solicitor Introduced for X Passage First Reading Page _ of Referral Assigned to Councilor Nealley CITY OF BANGOR 16-152 APRIL 11, 2016 (TITLE.) Order, Authorizing Bid Award in the Amount of $164,700 to Vaughn D. Thibodeau II, Inc for Maine Avenue Sewer Reconstruction THAT, Deborah Garr, Finance Director is hereby authorized to execute a contract with Vaughn D. Thibodeau II, Inc in the amount of $164,700 for Maine Avenue Sewer Reconstruction Project. IN CITY COUNCIL APRIL 11, 2016 MOTION MADE AND SECONDED FOR PASSAGE PZ�o CITY CLERK City of Bangor Bid Tabulation Proposal: Maine Avenue Property Sewer Reconstruction Bid Opening: 4-6-16 General Contractractor Vaughn D. R.F. Jordan & Sons Construction, Thibodeau II Inc. Inc Ban or ME Ellsworth ME Sargent Corporation Stillwater ME Lou Silver, Inc. Orono ME Item Description Qty. Unit Unit Price Total Price Unit Price TataI Price Unit Price Total Price Unit Price Total Price 1 Mobilization (not to exceed 3%) 1 LS $4,300.00 $4,300.00 $8,500.00 $8,500.00 $7,500.00,000.00 $ 7 $ 500.00 , 12 $12,000.00 2 Rock Removal 10 CY $200.00 $2,000.00 $750.00 $7,500.00 $75.00 $750.00 $200.00 $2,000.00 3 Test Pit 2 EA $250.00 $500.00 $1,000.00 $2,000.00 $750.00 $1,500.00 $1,000.00 $2,000.00 4 10 -inch Diameter Sewer Main 900 LF $100.00 $90,000.00 $165.00 $148,500.00 $125.00 $112,500.00 $257.00 $231,300.00 5 4' Standard Sewer Manhole 100 VF $150.00 $15,000.00 $500.00 $50,000.00,000.00 $ 450.00 $ 45 $700.00 $70,000.00 6 6 -inch Diameter Sewer Lateral 220 LF $50.00 $11,000.00 $45.00 $9,900.00 $80.00 $17,600.00 $100.00 $22,000.00 7 External Cleanouts 2 EA $400.00 $800.00 $2,000.00 $4,000.00 $500.001,000.00 $ $1,500.00 $3,000.00 8 Abandon exist. main under building with flowable fill 1 LS $1,000.00 $1,000.00 $1,000.00 1,000.001 $6,200.00 $6,200.00 $5,000.00 $5,000.00 9 lRemove and Reset Conc. Curb Sections 260 LF $12.00 $3,120.00 $30.00 $7,800.00 $24.00 $6,240.00 $45.00 $11,700.00 10 Remove and Reset Brick Sidewalk 300 SF $5.00 $1,500.00 $20.00 $6,000.00 $15.00 $4,500.00 $20.00 $6,000.00 11 Replace Plantings 8 EA $100.00 $800.00,000.00 $ 250.00 $ 2 $600.00 $4,800.00 $250.00 $2,000.00 12 Abandon exist. SMH in place 1 EA $500.00 $500.00 $2,000.00 $2,000.00 $1,000.00 $1,000.00 $2,500.00 $2,500.00 13 3" Loam, Seed, and Mulch 1 LS $3,180.001 $3,180.00 $3,500.00 $3,500.00 $2,000.00 $2,000.00 $5,050.00 $5,050.00 14 H.M.A. Pavement 200 TON $125.00 $25,000.00 $185.00 $37,000.00 $125.00 $25,000.00 $125.00 $25,000.00 15 Internal Plumbing Modifications for Southeast Restroom #1 1 LS $3,000.00 $3,000.00 $9,000.00 $9,000.00 $9,750.001 $9,750.00 $9,600.00 $9,600.00 16 Internal Plumbing Modifications for Northwest Restroom #2 1 LS $3,000.00 $3,000.00 $28,000.00 $28,000.00 $10,300.00 $10,300.00 $14,400.00 $14,400.00 Total $164,Z22jg $326,700.00 $255,640.001 423 550.00 Ranger Contracting, Inc. Winslow, ME S.E. MacMillan Company, Inc. Ban or, ME Item Description Qty. Unit Unit Price Total Price Unit Price Total Price 1 Mobilization (not to exceed 3%) 1 LS $4,551.50 $4,551.50 $6,000.00 $6,000.00 2 Rock Removal 10 CY $216.00 $2,160.00 $100.00 $1,000.00 3 Test Pit 2 EA $691.50 $1,383.00 $3,000.00 $6,000.00 4 10 -inch Diameter Sewer Main 900 LF $88.00 $79,200.00 $295.00 $265,500.00 5 4' Standard Sewer Manhole 100 VF $437.50 $43,750.00 $1.00 $100.00 6 6 -inch Diameter Sewer Lateral 220 LF $42.50 $9,350.00 $50.00 $11,000.00 7 External Cleanouts 2 EA $650.50 $1,301.00 $700.00 $1,400.00 8 Abandon exist. main under building with flowable fill 1 LS $2,400.00 $2,400.00 $1,727.00 $1,727.00 9 Remove and Reset Conc. Curb Sections 260 LF $20.50 $5,330.00 $1.00 $260.00 10 Remove and Reset Brick Sidewalk 300 SF $5.50 $1,650.00 $0.01 $3.00 11 Replace Plantings 8 EA $223.00 $1,784.00 $1.00 $8.00 12 Abandon exist. SMH in place 1 EA $695.50 $695.50 $1,000.00 $1,000.00 13 3" Loam, Seed, and Mulch 1 LS $3,187.50 $3,187.50 $5,000.00 $5,000.00 14 H.M.A. Pavement 200 TON $118.75 $23,750.00 $0.01 $2.00 15 Internal Plumbing Modifications for Southeast Restroom #1 1 LS $3,393.50 $3,393.50 $7,000.00 $7,000.00 16 Internal Plumbing Modifications for Northwest Restroom #2 1 LS $4'796.50 $4,796.50 $21,000.00 $21,000.00 Total $188,682.501 $327,000.00