HomeMy WebLinkAbout2016-03-28 16-123 ORDINANCECOUNCIL ACTION
Item No. 16-123
Date: March 28, 2016
Item/Subject: ORDINANCE, Amending Chapter 109, Fees, of the Code of the City of
Bangor, By Instituting a Fee Schedule
Responsible Department: Legal
Commentary:
The City charges fees for a number of different services. Historically, these fees have been
charged pursuant to various ordinances, orders, and policies, making them difficult to track,
alter, or remove.
This ordinance amendment would provide for a single Schedule of Fees in which the fees
charged by various City departments would be compiled in one document. This will help the City
maintain a consistent approach to charging for services and add transparency to the City's fee
structure.
If approved the compiled fee schedule is intended to mirror the fees presently being charged by
the City, whether in accordance with ordinance, Council order, policy, or other practice. Once
the schedule is adopted by this ordinance amendment, a Council Order or Orders can be used
for any necessary adjustments. This item was reviewed and recommended for approval at the
Finance Committee of March 21, 2016.
Manager's Comments:
Associated Information: Schedule of Fees
Budget Approval:
Legal Approval:
Introduced for
Passage
x First Reading
Referral
Department Head
nA
City Manager
Finance Director
` ty Solicitor
16-123
MARCH 28, 2016
"K-4 Assigned to Councilor Durgin
6-f
CITY OF BANGOR
ORDINANCE, Amending Chapter 109, Fees, of the Code of the City of Bangor, By Instituting a Fee
Schedule
WHEREAS, the City of Bangor charges fees for a number of different services it performs;
WHEREAS, these fees are scattered throughout the City Code, Council Orders, and policies, making
them difficult to track and, where necessary, to amend or remove; and
WHEREAS,, putting City fees in one place will make the Citys fee structure more transparent;
BE rr ORDAINED BY THE CM COUNCIL OF THE CITY OF BANGOR AS FOLLOWS, THAT
Chapter 109 of the Code of the City of Bangor be repeated and replaced with the following:
§ 109-1. Schedule of Fees established.
Effective April 21, 2016, the attached Schedule of Fees shall be in effect. The Schedule of Fees may be
amended by Council Order.
§ 109-2. Effect on existing ordinances.
The fees prescribed by the Schedule of Fees shall supersede any fees charged by the City, whether
pursuant to City ordinance or otherwise, that are inconsistent with the Schedule of Fees described in §
109-1 above.
CITY OF BANGOR
SCHEDULE OF FEES
A. Airport
Airport fees shall be as set by the Airport Director, including but not limited to those
referred to by §54-24, except for the following:
Off -Airport Vehicle Rental Business. The fee for operating an off -airport vehicle rental
business eliciting airport customers shall be 7.5 percent of all gross revenues derived
from autombile rentals to customers transported from the airport. Ref. §54-19(B).
B. Animal Control.
(1) Dog Licensing*
Intact (not spayed or neutered)** $ 11
Spayed or Neutered** $ 6
*Dog Licensing fees shall be adjusted to comply with State law.
** If processed online there is an additional fee of $1.
(2) Kennel License
Per license (up to 10 dogs) $ 42 §65-15
(3) Late Fee
Per dog after January 31st $ 25
(4) Impound fees shall be assessed by the Bangor Humane Society, and shall increase for
each offense after the first within a 12 month period. Ref. §65-3.
C. Bass Park
Fees for the Bass Park Complex shall be as set by the Manager of Bass Park.
D. City Clerk.
(1) Business Licensing
16-123
MARCH 28, 2016
Fees shall be increased to match the Consumer Price Index (CPI -U) on July 1 of each year.
Amusement Device License $ 43 8 M.R.S.A. § 441 et. seq.; §85-4
Automobile Recycling $ 62 30-A M.R.S.A. § 3756; § 85-4
Beano License $ - § 85-4
Bowling $ 325 § 85-4
1 Revised April 11, 2016
CITY OF BANGOR
16-123
SCHEDULE OF FEES
MARCH 28, 2016
BYOB:
Bottle Club
$
200
§ 61-3
BYOB (1X)
$
25
§ 61-27
Carnival License:
Lg. (6 or more rides)
$
620
§ 85-4
Sm. (1 to 5 rides)
$
186
§ 85-4
Catering
$
25
§§ 124-2; 85-4
Circus License:
Indoor
$
429
§ 85-4
Outdoor
$
682
§ 85-4
Closing Out Sale License
$
58
§ 85-4
Dance Hall License
$
325
§ 85-4
Dealer in Explosives License
$
92
§ 85-4
Dealer in Old Gold
$
112
§ 85-4
Flammable Liquid License
$
197
§ 85-4
Games of Chance
$
-
§ 85-4
Industrial Metals/Junkyard License
$
62
§ 85-4
Innkeeper:
§ 85-4
Lg. 11 or more rooms
$
429
Sm. 1 to 10 rooms
$
217
Liquor License:
§ 85-4
Off -premise
$
25
On -premise
$
124
Lunch Wagon:
§ 85-4
Up to 3 days
$
62
Up to 3 months
$
149
Over 3 months up to 1 year
$
216
Mobile Home Park
§§ 186-1; 85-4
Sm. (fewer than 100 lots)
$
217
Med. (100 to 199 lots)
$
248
Lg. (200 to 299 lots)
$
372
XLg. (300 or more lots)
$
496
Pawnbroker's License
$
112
§§ 206-3; 85-4
Precious Metals License
$
112
§§ 219-1; 85-4
Roller-skating Rink License
$
325
§ 85-4
Secondhand Dealer License
$
112
§§ 247-2; 85-4
Secondhand (per Table)
$
6
§§ 247-2; 85-4
Special Amusement Permit
$
325
§ 85-4
Tank Farm License
$
197
§ 85-4
Tavern
$
216
§ 85-4
Taxi Cab
$
86
§§ 278-3; 85-4
Taxi Cab Operator
$
32
§§ 278-4; 85-4
Theater
$
325
§ 85-4
Transient Seller of Consumer Merchandise $
372
§§ 265-31; 85-4
Victualer
§§ 295-1; 85-4
No Tables
$
180
Sm. (up to 2,000 sq. ft.)
$
310
2
Revised April 11, 2016
Lg. (over 2,000 sq. ft.)
(2) Vital Records
CITY OF BANGOR
SCHEDULE OF FEES
$ 496
Birth, Death, or Marriage Certificate - Copy
$
5
1St Copy
$
15
2"d CoPV Purchased w/1st copy
$
6
Disposition of Remains
$
20
Marriage License
$
40
Marriage Ceremony
$
200
Non -Certified Copy
$
5
Certificate Envelope
$
1
Genealogy Search:
Per state law
with Date
$
5
without Date
$
10
(3) Miscellaneous Fees
Dedimus Justice
$
5
Notary Public
$
5
Attestation
$
5
Sole Proprietor/Partnership Filing
$
10
Hospital Lien
$
5
Photocopies
$
0
Fax
$
1
IF&W Agent Fee
$
2
Copy Voter List
Per state law
E. Code.
(1) General Provisions.
§28-67(E)
a. Fees shall be increased to match the Consumer Price Index (CPI -LI) on July
1 of each year, unless set by the State.
b. Any work started without the benefit of a permit may be issued a stop
work order. Additionally, an applicant is required to pay a double permit
fee before any permit is issued for work that has already begun.
(2) Appeals
Appeals Board $ 265
Appeals Board Avertising $ 60
(3) Certificate of Occupancy
No Construction $ 23
16-123
MARCH 28, 2016
3 Revised April 11, 2016
CITY OF BANGOR
SCHEDULE OF FEES
$0-$2500
$
23
$2,501-$7,500
$
88
$7,501-$175,000
$
132
$175,001-$300,000
$
175
$300,001-$1,000,000
$
350
$1,000,001 and up
$
520
(4) Construction (New)
a. The fee for new construction shall be as follows:
(gross square footage) x (type of construction factor) x .0075 = fee
b. The type of construction factor shall be determined in accordance with the following table:
16-123
MARCH 28, 2016
City of Bangor
Group (2006 International Building
Code)
Type of Construction
1A
1B
2A
28
3A
38
4
5A
56
A-1
Assembly, theaters, with
stage
212
204.9
199.7
191.2
179.6
174.6
184.9
164.2
157.7
Assembly, theaters, without
stage
194.08
186.9
181.7
173.3
161.7
156.6
166.9
146.3
139.8
A-2
Assembly, nightclubs
166.35
161.6
157.1
150.8
141.6
137.8
145.3
128.5
123.7
A-2
Assembly, restaurants, bars,
banquet halls
165.35
160.6
155.1
149.8
139.6
136.8
144.3
126.5
122.7
A-3
Assembly, churches
195.96
188.8
183.6
175.2
163.7
158.7
168.8
148.3
141.8
A-3
Assembly, general,
community halls, libraries,
163.95
156.8
150.6
143.2
130.7
126.6
136.8
115.3
109.8
A-4
Assembly, arenas
193.08
185.9
179.7
172.3
159.7
155.6
165.9
144.3
138.8
B
Business
169.14 j
163
157.4
149.7
135.8
130.8
143.5
119.3
113.7
E
Educational
178.16
#
166.9
159.3
148.4
140.4
153.7
129.1
124.7
F-1
Factory and industrial,
moderate hazard
100.75
96.02
90.26
86.94
77.68
74.37
83.16
64.01
60.19
F-2
Factory and industrial, low
hazard
99.75
95.02
90.26
85.94
77.68
73.37
82.16
64.01
59.19
H-1
High hazard, explosives
94.4
89.68
84.92
80.59
72.52
68.22
76.82
58.86
N.P.
H-2, -3, -4
High hazard
94.4
89.61
84.92 1
80.59 1
72.52
68.22
76.82
58.86
54.03
4 Revised April 11, 2016
CITY OF BANGOR
SCHEDULE OF FEES
16-123
MARCH 28, 2016
H-5
HPM
169.14
163
157.4
1 149.7
135.8
130.8
143.5
119.3
113.7
1-1
Institutional, supervised
environment
168.08
162.2
157.7
150.8
138.5
134.9
147
124.3
119.9
1-2
Institutional, hospitals
287.21
281
275.5
267.8
252.9
N.P.
261.6
236.4
N.P.
1-2
Institutional, nursing homes
198.55
192.4
186.8
179.1
165.2
N.P.
173
148.7
N.P.
1-3
Institutional, restrained
192.65
186.5
180.9
173.2
160.8
154.8
167.1
144.3
136.7
1-4
Institutional, day-care
facilities
168.08
162.2
157.7
150.8
138.5
134.9
147
124.3
119.9
M
Mercantile
123.91
119.2
113.7
108.4
98.85
96.06
102.8
85.7
81.9
R-1
Residential, hotels
169.51
163.6
155.1
152.3
140.1
136.5
148.6
125.9
121.5
R-2
Residential, multiple -family
142.14
136.2
131.7
124.9
113.4
109.8
121.9
99.18
94.76
R-3
Residential, one- and two-
family
133.78
130.1
126.8
123.7
118.7
115.8
119.8
110.9
103.9
R-4
Residential, care/assisted
living facilities
168.08
162.2
157.7
150.8
138.5
134.9
147
124.3
119.9
S1
Storage, moderate -hazard
93.4
88.68
82.92
79.59
70.52
67.22
75.82
56.86
53.03
S-2
Storage, low -hazard
92.4
87.68
82.92
78.59
70.52
66.22
74.82
56.86
52.03
U
Utility, miscellaneous
71.08
67.13
62.83
59.33
53.24
49.79
56.48
41.64
39.44
Notes:
a. Private garages: use "utility, miscellaneous."
b. Unfinished basements (all use groups) equals $15 per square foot.
c. For shell -only buildings, deduct 20%.
Id. N.P. = Not permitted.
(5) Construction (Renovation)
a. Existing Residential
$38 for first $2,500 of construction cost + $7
per $1,000 of construction cost over $2,500
Existing Residential includes but is not limited to remodeling, fences, decks, swimming pools,
foundations, utility buildings, concrete slabs, garages, additions, fire escapes, and handicap ramps)
b. Existing Non -Residential
$55 for first $2,500 of construction cost + $7
per $1,000 of construction cost over $2,500
Revised April 11, 2016
CITY OF BANGOR 16-123
SCHEDULE OF FEES MARCH 28, 2016
Existing Non -Residential includes but is not limited to remodeling, additions, alterations, fences, concrete
slabs, canopies, and accessory structures
(6) Demolition
Dwelling, structure, or interior
Small Structure with no sewer connection
(7) Electrical Permits
Temporary Service
Additional Residential Wiring
New Wiring/Rewiring of 1 & 2 Family
Structure
New Wiring/Rewiring of 3 Family or More
Structure
Commercial
$65 + $10/story over 3 stories
$ 20
$ 45
$ 45
$ 70
$72 + 1/2 of 1% of the cost of the job
$72 + 1/2 of 1% of the cost of the job
(8) Excavation/Grading and Filling $ 115
(9) Fire and Intrusion Alarms $ 55
(10) Flood Hazard Development Permit $ 55 §120-4
(11) Fuel Gas Burner -Propane and Natural Gas §127-3
(Replacement, conversion, or new installation)
Residential - up to 200,000 BTUS $ 50
Light Commercial - 200,000 -1 million BTUS $ 65
Heavy Commercial - 1-2 million BTUS $ 100
Industrial - over 2 million BTUS $ 130
(12) Land Development Permit Extension Request
6 Months $ 115
(13) Minimum Energy Standards $ 5
(14) Minor Yard Variations Request $ 55
(15) Observation and Amusement Stands
Temporary $ 60
Permanent $ 55 for first $2,500 + $7/$1,000 over $2,500
(16) Oil Burner Permits: (1 gal. = 134,000 BTUs) Replacements and New Installations
6 Revised April 11, 2016
(17) Parking Lots
1-24 spaces $ 55
25-100 spaces $ 110
101-300 spaces $ 165
301 or more spaces $ 270
(18) Plumbing
a. Internal Plumbing Permits
30-A M.R.S.A. §4211
16-123
MARCH 28, 2016
General $ 40 for up to 4 fixtures; + $ 10 per additional fixture
Hook up to Public Sewer $ 10
Hook up to exiting subsurface system $ 10
Piping relocation with no new fixtures $ 10
Permit transfer $ 10
b. Department Review
Engineered System Review
Multi-user Review
(19)
CITY OF BANGOR
SCHEDULE
OF FEES
Residential - Firing rate up to 2.5 gal/hr or
$ 45
up to 200,000 BTUs
Sprinkler System
Light Commercial - Firing rate 2.5 to 7.5
$ 55
gal/hr or 200,000 BTUs to 1 mill BTUs
11 to 50 heads
Heavy commerical - Firing rate 7.5 to 15
$ 85
gal/hr or 1 mill to 2 mill. BTUS
Over 100 heads
Industrial - Firing rate over 15 gal/hr and
$ 120
over 2 mill. BTUs
(17) Parking Lots
1-24 spaces $ 55
25-100 spaces $ 110
101-300 spaces $ 165
301 or more spaces $ 270
(18) Plumbing
a. Internal Plumbing Permits
30-A M.R.S.A. §4211
16-123
MARCH 28, 2016
General $ 40 for up to 4 fixtures; + $ 10 per additional fixture
Hook up to Public Sewer $ 10
Hook up to exiting subsurface system $ 10
Piping relocation with no new fixtures $ 10
Permit transfer $ 10
b. Department Review
Engineered System Review
Multi-user Review
(19)
Permit to Move a Building
(20)
Shoreland Zone Permit
(21)
Sign Permit
(22)
Sprinkler System
Under 10 heads
11 to 50 heads
51-100 heads
Over 100 heads
(23) Subsurface Wastewater
a. State Water Quality Surcharge
$ 100
$ 100
$ 55 +100% of all costs for services provided by the City
$ 55
$ 45 § 260-3
$ 25 + $10/story over 1st
$ 35 + $10/story over 1st
$ 70 + $10/story over 1st + $45 plan review
$ 115 + $45 plan review + $10/story over 1st
30-A M.R.S.A. § 4211
$ 15
7 Revised April 11, 2016
b. Complete Disposal System
Engineered
Non -Engineered
Primitive
Separate Grey Waste Disposal Field
Seasonal Conversion Permit
1st Time System Variance
c. Separate Parts
CITY OF BANGOR
SCHEDULE OF FEES
$ 200
$ 250
$ 100
$ 35
$ 50
$ 20
Alternative Toilet
$
50
Disposal Field Only: Engineered
$
150
Disposal Field Only: Non -engineered
$
150
Treatment Tank Only: Engineered
$
80
Treatment Tank Only: Non -engineered
$
150
Holding Tank
$
100
Other Components
$
30
(24) Swimming Pool
1st Permit $ 5
2nd Permit (60 days after 1st) $ 11
(29) Zoning Verification Letter
Commercial $ 150
Up to 4 Residential Units $ 50
F. Community Connector
(1) Single Fares
16-123
MARCH 28, 2016
§ 128
§§ 223-8, 223-9
8 Revised April 11, 2016
Above Ground
$
40
In Ground
$
60
(25)
Tanks
331 Gallon or Larger Gas, Fuel or Oil
$
70
125 Gallon or Larger Liquified Gases
$
70
(26)
Vacant Building Registration
$
250 /6 months
(27)
Wood Stove/Pellet Stove Permit
$
30
(28)
Yard Sale Permit
1st Permit $ 5
2nd Permit (60 days after 1st) $ 11
(29) Zoning Verification Letter
Commercial $ 150
Up to 4 Residential Units $ 50
F. Community Connector
(1) Single Fares
16-123
MARCH 28, 2016
§ 128
§§ 223-8, 223-9
8 Revised April 11, 2016
Regular
Half Rate
(2) Strips (5 rides)
(3) Monthly Bus Passes
Regular
w/ $20 Voucher
Student
(4) Senior/Disabled Half Rate Card
(5) ADA Paratransit fare (one-way ride)
G. Engineering.
(1) Blasting Permit
CITY OF BANGOR
SCHEDULE OF FEES
$ 1.50
$ 0.75
$ 6
$ 45
$ 25
$ 20
Free
$ 3
$ 25
$ 50
$ 100
$ 50
$ 100 +$20/truck
$ 685
$ 885
$ 685
$ 475
$ 475
$ 550
$ 450
$1,050
$ 17
$ 100
16-123
MARCH 28, 2016
§ 76-7
§ 271-37 et seq.
§ 271-32
§ 265-1(H)
§ 28-39
§ 28-39
§ 28-39
§ 28-39
§ 28-39
§ 28-39
§ 28-39
§ 28-39
§ 28-39
§ 28-39
9 Revised April 11, 2016
1 week or less
30 day sor less
1 year or less
(2)
Driveway Permit
(3)
Pole Permit
(4)
Street Opening Permit (Right of Way)
(5)
Waste Hauler Initial Application
H. Fire
and Emergency Medical Services.
(1)
Emergency Medical Services Rates
ALS 1 Base Rate
ALS 2 Base Rate
ALS Base Rate No Services
ALS Non -Em. Base Rate ALS Service
ALS Non -Em. Base Rate No Service
BLS Base Rate
BLS Base Rate Non -EM. (also BLNE)
SCT Transports (Dr., Nurse, Resp. Therapist
giving care on board)
ALS and BLS per Loaded Mileage Charge
ALS Back Up
$ 45
$ 25
$ 20
Free
$ 3
$ 25
$ 50
$ 100
$ 50
$ 100 +$20/truck
$ 685
$ 885
$ 685
$ 475
$ 475
$ 550
$ 450
$1,050
$ 17
$ 100
16-123
MARCH 28, 2016
§ 76-7
§ 271-37 et seq.
§ 271-32
§ 265-1(H)
§ 28-39
§ 28-39
§ 28-39
§ 28-39
§ 28-39
§ 28-39
§ 28-39
§ 28-39
§ 28-39
§ 28-39
9 Revised April 11, 2016
(2) False Fire Alarms
1-3 Responses per year
4-8 Responses per year
9 or More Responses per year
CITY OF BANGOR
SCHEDULE OF FEES
$ - /response
$ 250 /response
$1,000 /response
I. Health and Community Services
Immunization clinic and infectious disease testing fees shall be as
set by the Director of Health and Community Services
J. Historic Preservation.
(1) Certificate of Appropriateness
Minor Review $ 55
New Construction/Comprehensive $ 275
Rehabilitation
(2) Downtown Revitalization
Minor Review $ 30
New Construction/Comprehensive $ 275
Rehabilitation
(3) Sign Review Only
Certificate of Appropriateness OR $ 30
Downtown Revitalization
K. Parking
Fees are monthly unless otherwise noted.
(1) Abbot Square
Upper
Monthly
$ 66
0-15 minutes
Free
15-60 minutes
$ 0.50
Each add'I hour (or fraction thereof)
$ 0.50
24-hour maximum
$ 4.50
5pm to 7am
Free
Lower/ Haynes Court
$ 54
(2) Bangor House $ 61
10
§58-10
§58-10
§58-10
16-123
MARCH 28, 2016
Revised April 1], 2016
CITY OF BANGOR
SCHEDULE OF FEES
(3) Court Street $ 33
(4) Court System $ 61
(5) French Street $ 54
(6) Hammond Square
Lower
$ 79
Upper
$ 67
(7) Hancock Street
$ 57
(8) High Street
$ 54
(9) Kenduskeag Plaza
East $ 57
West $ 50
(10) Merrill Bank Street $ 61
(11) Pickering Square Garage
Main
$ 61
Rooftop
$ 33
Lower
$ 60
Resident
$ 43
Hourly
0-2 hours
Free
2-3 hours
$ 1.50
Each add'I hour (or fraction thereof)
$ 0.50
24-hour maximum
$ 4.50
(12) Pay -by -Space Machines
0-4 hours, per hour (or fraction thereof) $ 0.50
4-9 hours, per hour (or fraction thereof) $ 1
5pm to Sam Free
L. Parks and Recreation
(1) Bangor Municipal Golf Course
All green fees and membership fees shall be as set by
the Director of Parks and Recreation.
11
§28-48(E)
16-123
MARCH 28, 2016
Revised April 11, 2016
(2) Event Permit
(3) Harbor Fees
a. Short Term Docking - Daily Rates
10'-16' Vessel
16'-26' Vessel
26'-40' Vessel
40'-65' Vessel
65'+ Vessel
CITY OF BANGOR
SCHEDULE OF FEES
$ 25
$ 20
$ 28
$ 40
$ 70
based on individualized quote
b. Long Term Docking, 25' or Less -Monthly Rates
All Months Except July & August $ 225 /month
July & August $ 435 /month
Full Season $ 775
c. Long Term Docking, 25' to 40'- Monthly Rates
All months except July & August $ 375 /month
July & August $ 595 /month
Full Season $1,145
d. Long Term Docking over 40'—Monthly Rates
All months except July & August
July & August
Full Season
M. Planning
(1) Advertising
based on individualized quotes
based on individualized quotes
based on individualized quotes
Zoning Map Amendment (Public Hearing - 2
$
410
§165-6(A)
notices)
Contract Zoning Amendment (Public Hearing
$
509
§165-6(A)
- 2 notices)
Preliminary Subdivision Approval (Public
$
147
§165-128(B)
Hearing -2 notices)
Conditional Use Approval (Public Hearing)
$
74
§165-9(B)
Mobile Home Park Construction Permit
$
74
§165-119
(Public Hearing)
Change to Official City Map of Streets - Non-
$
74
§271-9
City Initiated (Public Hearing)
(2) Conditional Use
$
463
§271-9
16-123
MARCH 28, 2016
12 Revised April 11, 2016
(3) Impact Fee
(4) Mobile Home Park Construction Permit
(5) Site Development Plan
CITY OF BANGOR
SCHEDULE OF FEES
$0.4078/sq. ft. of new §165-115
building construction
$293 +$63/
mobile home
Nonresidential building less than 1,000 sq. $ 462
ft. of gross floor area (GFA) on any site
development activity which requires use of
land of 10,000 sq. ft. or less including
grading and filling or housing projects with
less than 8 D.U.s
Nonresidential building in excess of 1,000 sq. $ 691
ft. but less than 50,000 sq. ft. of GFA or any
site development activity which requires use
of land in excess of 10,000 sq. ft. (regardless
of size of building) or housing projects with 8
or more D.U.s.
Nonresidential building in excess of 50,000 $1,380
sq. ft. but less than 100,000 sq. ft. of GFA
$2,068
Nonresidential building in excess of 100,000
sq. ft. but less than 150,000 sq. ft. of GFA
Nonresidential building in excess of 150,000 $2,756
sq. ft. of GFA
Site with 50 or more dwelling units $935 + $29/DU over 50 § 165-110(A)
Flag Lot $ 220 §§ 165-110(A); 165-68(B)
§165-119(F)
§ 165-110(A)
§165-110(A)
§165-110(A)
§165-110(A)
§ 165-110(A)
(6) Site Development Plan Revision, Minor
Nonresidential building less than 1,000 sq.
$ 231
§ 165-110(A)
ft. of GFA or any site development activity
which requires use of land of 10,000 sq. ft.
or less including grading and filling or
housing projects with less than 8 D.U.s
Nonresidential building in excess of 1,000 sq.
$ 346
§ 165-110(A)
ft. but less than 50,000 sq. ft. of GFA or any
site development activity which requires use
of land in excess of 10,000 sq. ft. (regardless
of size of building) or housing projects with 8
or more D.U.s.
Nonresidential building in excess of 50,000
$ 690
§ 165-110(A)
sq. ft. but less than 100,000 sq. ft. of GFA
Nonresidential building in excess of 100,000
$1,380
§ 165-110(A)
16-123
MARCH 28, 2016
13 Revised April 11, 2016
CITY OF BANGOR 16-123
SCHEDULE OF FEES MARCH 28, 2016
sq. ft. but not less than 150,000 sq. ft. of
GFA (with 10 or more plan revisions)
In excess of 150,000 sq. ft. of GFA (with 10 $2,756 § 165-110(A)
or more plan revisions)
Completion Date Extension Request $ 67 § 165-110(A)
(7) Site Location of Development § 165-114(J)
Site Developments requiring approval under $4,306+ $46/1,000 sq. ft. of GFA in excess of 60,000
the provisions of 38 M.R.S.A. §§ 481-490 sq. ft. or $867/acre over 3 acres which is to remain non -
eligible for review under Article XVI of this revegetated, whichever is greater
ordinance
Subdivision Plan requiring approval under 38 $4,306
M.R.S.A. §§481-490 with no public
improvements (up to 5 lots)
Subdivision Plan requiring approval under 38 $4,306 + $63/lot
M.R.S.A. §§481-490 with public
improvements over 5 lots
Plan Modification: For projects less than $ 463
1,000 sq. ft. of GFA and subdivision plans of
5 lots or less
Plan Modification: For projects in excess of $ 692
1,000 sq. ft. of GFA and subdivision plans of
5 lots or more
(8) Stormwater for projects requiring Chapter
500 stormwater permit (for non -Site
Location of Development projects)
For projects not in Urban Impaired $ 524
Watershed
For projects in Urban Impaired Watershed $1,047
(9) Subdivisions
Final, Minor (1 to 5 lots without
improvements)
Preliminary, Major (6 or more lots OR less
than 6 lots with public improvements
necessary)
Final, Major (6 or more lots OR less than 6
lots with public improvements necessary)
Developmental
$ 463
§ 165-127
$ 463 + $63/lot over 5 § 165-110(A)
$ 463 + $63/lot over 5 § 165-128
$ 463
(10) Traffic for projects requiring Maine DOT Traffic Movement Permit
Projects generating in excess of 100 peak $ 524
§ 165-110(A)
14 Revised April 11, 2016
CITY OF BANGOR
SCHEDULE OF FEES
hour trips
Projects generating in excess of 200 peak $1,047
hour trips
(11) Zone Amendments
a. Zoning Map Amendments
acre or less $ 575
In excess of %2 acre $ 920
b. 5 or fewer conditions; 50 words or $1,377
fewer
More than 5 conditions; more than 50 $1,900
words
N. Police
(1) Alarm Response Fee
0-3 Responses $ 0 /response
4-8 Responses $ 25 /response
9+ Responses $ 100 /response
(2) Concealed Weapons Permit Fee
New Permit ($10.00 retained by $ 35
municipality)
Permit Renewal ($10.00 retained by $ 20
municipality)
Address Change $ 2
(3) Copy Fee - Records Division
Incident Reports -first 5 pages
$
5
Incident Reports- each additional page
$
2
Accident Report
$
10
Non -Reportable Accident Report
$
5
Online Crash Reporting for accidents that
$
16
are estimated to have over $1000 damage
(4) Evidence - Copy on CD/DVD
$
20 Per Disk
(5) Towing and Impound fees shall be as set by
the company performing the service.
O. Public Works
16-123
MARCH 28, 2016
§ 165-6(A)
§ 165-6(A)
§ 165-6(A)
§ 165-6(A)
§ 58-6
15 Revised April 11, 2016
CITY OF BANGOR
SCHEDULE OF FEES
(1) Cemetery and Burial Services
Lot Sale
Perpetual Care
Weekday Cremations
Weekend Cremations
Weekday Earth Burials
Weekend Earth Burials
(2) Fire Alarm Box Maintenance
(3) Use of Organic Waste Disposal Site
Residents
Non -Residents
(4) Waste Haulers
P. Stormwater Utility
The fee for stormwater shall be a $22 per
year minimum for the first 3,000 square feet
plus $11 per 1,000 square feet of impervious
cover over 3,000 square feet. §268-18(A).
Q. Wastewater
(1) Wastewater fees
Sewer Connection Fee
Septage
Grey Water
Sewer User Fee
(2) Industrial Pretreatment Permit
$ 600 each
$ 35 per year
$ 125 each
$ 175 each
$ 300 each
$ 450 each
$ 325/year
§ 265-1(F)
$0
$ 100/year
$100/year + $20/truck § 265-1(H)
$1.06 /gallon §252-7
$120 /1,000 gallons §252-9
$30 /1,000 gallons §252-18(E)
$6.10 /HCF §252-24(A)&(B)
$ 250 §252-11(C)
16-123
MARCH 28, 2016
16 Revised April 11, 2016
IN CITY COUNCIL
MARCH 28, 2016
FIRST READING
CITY CLERK
IN CITY COUNCIL
APRIL 11, 2016
MOTION MADE AND SECONDED FOR PASSAGE
VOTE:8-0
COUNCILORS VOTING YES: BALDACCI, DURGIN, GRAHAM, NICHOLS, PERRY,
PLOURDE, SPRAGUE,
COUNCILORS VOTING NO: NEALLEY
PASSED
��L) a
CITY CLERK