Loading...
HomeMy WebLinkAbout2009-02-09 09-072 ORDERCOUNCIL ACTION Item No. 09 072 Date: 02-09-2009 Item/Subject: Order, Authorizing the City Engineer to Develop a Mooring Plan for Bangor Harbor and to Explore the Feasibility of Implementing such a Plan Under the City's 1990 Permit from the United States Corps of Engineers. Responsible Department: Engineering Commentary: The Harbor Committee has as a goal increasing the use of Bangor Harbor by visiting boats. It has recommended that moorings be placed in the river as one strategy to meet this goal. However, the presence of the federal navigation channel, which covers a significant portion of the River's width at Bangor Harbor, limits the potential locations for such moorings to an area unsuitable for many vessels. During the period in which commercial vessels were absent from this stretch of the river, moorings were allowed within the navigation channel. With the return of cruise ships to Bangor, this is no longer permitted. The Harbor Committee has recommended that discussions take place with the City of Brewer, which shares our harbor, and the Corps of Engineers to determine if there is a way that moorings could be located elsewhere within the harbor while insuring the safety of current commercial operations and whether such an option might be possible under the City's existing 1990 permit. The attached Order would authorize the City Engineer to develop a mooring plan based on safe operation of current commercial vessels and to discuss this plan with the Brewer and the Corps. Department Head Manager's Comments: This recommendation of the Harbor Committee has been discussed by the Transportation and Infrastructure Committee, which recommended that this order be drafted and forwarded to Council with a recommendation to approve. 4.a6. �6& City Manager Associated Information: Budget Approval: Legal Approval: Introduced for X Passage First Reading Referral Page _of_ Finance Director Solicitor 09 0'74' Assigned to Councilor Hawes February 9, 2009 CITY OF BANGOR (TME.) Order, Authorizing the City Engineer to Develop a Mooring Plan for Bangor Harbor and to Explore the Feasibility of Implementing such a Plan Under the City`s 1990 Permit from the United States Corps of Engineers. WHEREAS, the Federal Navigation Channel in the Penobscot River extends downstream from the Joshua Chamberlain Bridge; and WHEREAS, in the area of Bangor Harbor, the Channel encompasses virtually the entire width of the River; and WHEREAS, in accordance with the City`s 1990 permit, moorings were allowed within the navigation channel during extended periods in which commercial traffic was not making use of the segment of the River adjacent to Bangor Harbor; and WHEREAS, in recent years, commercial cruise vessels have used Bangor Harbor as a port of call and home port, thus signaling the return of commercial traffic to the River and limiting the areas where moorings can be placed; and WHEREAS, given water depths adjacent to allowable mooring areas, these moorings are not suitable for use by many pleasure vessels; and WHEREAS, the City and its Harbor Committee are interested in expanding the use of Bangor Harbor by visiting boats; and WHEREAS, the lack of effective mooring locations adjacent to Bangor Harbor has limited the success of efforts to attract visitors; and WHEREAS, given the width of the channel and the docking locations of commercial vessels as well as their maneuverability, commercial traffic can easily accommodate carefully located moorings; and WHEREAS, the Bangor City Council and the Bangor Harbor Committee desire to explore with the City of Brewer and the United States Corps of Engineers a proposal to place moorings in locations that will not compromise the needs of commercial navigation; and WHEREAS, as a part of this effort, the City wishes to explore whether it is possible to implement such a plan under the 1990 permit; NOW, THEREFORE, BE IT ORDERED BY THE CTfY COUNCIL OF THE CITY OF BANGOR THAT The City Engineer is authorized to develop a plan for Bangor Harbor that will place moorings in locations that will not compromise the needs of commercial navigation, to review and discuss this plan with the City of Brewer and the United States Corps of Engineers, and to explore whether such a plan can be implemented under the City's 1990 permit. IN CITY COUNCIL February 9, 2009 Motion Made and Seconded for Passage Passed s DEPUTY CITY CLERK O R D E R (TITLE,) Authorizing the City Engineer to Develop a Mooring Plan for Bangor Harbor and to Exglore the Feasibllity of Implementing such a Plan Under the City' 1990 Permit from tbP Unired States Corps of Engineers Assigned to Councilor