HomeMy WebLinkAbout2010-04-12 10-144 ORDERCOUNCIL ACTION
Item No. 10 14L4
Date: April 12, 2010
Item/Subject: ORDER, Authorizing Contract Award for Main/Cedar Street
Intersection Improvements
Responsible Department: Engineering
Commentary:
On March 31, 2010 the City received seven bids for improvements to the intersection at Main and
Cedar Streets. The bid prices ranged from $543,663.75 - $664,880 — see attached bid tabulation.
On April 5, 2010 the Finance Committee reviewed and approved staff recommendation to award the
contract to Lou Silver Inc. in the amount of $543,663.75.
This is an MDOT BACTS project that is locally administered. This project will be funded 90% by
the State and the City will provide the required 10% local match.
The contract award recommendation must be reviewed approved by the City Council as it is over
$50,000.
Mana er's Comments:
;4471/*/
Associated Information:
Bid Tabulation
Budget Approval:
Legal Approval:
Introduced for
X Passage
First Reading
Referral
Department Head
City Manager
Finance Director
7
City Solicitor
Page _ of _
Assigned to Councilor - Wheeler
CITY OF BANGOR
10 144
April 12, 2010
(TITLE.) Order, Authorizing Contract Award for Main/Cedar Street Intersection
Improvements
By the City Council of the City of Bangor:
ORDERED,
THAT, Deborah Cyr, Finance Director is hereby authorized to execute a contract
with Lou Silver Inc., in the amount of $543,663.75 for improvements to the Main
& Cedar Street Intersection.
IN CITY COUNCIL
April 12, 2010
Passed
(TITLE,)Authnri ling rantrArt Award for
Mainj_r_.PAar StrPet StreetTn Prs rtion Improvements
J,
Assigned to Councilor__
10 144
City of Bangor
Bid Tabulation - Main/Cedar Street Intersection Improvements
Bid Opening: 03/31/10
Lou Silver
Veazie, ME
Maine Earth
Hermon, ME
Item
Description
Qty.
Unit
Unit
Price
Total
Price
Unit
Price
Total
Price
1
202.080 Building Removal
1
LS
15 000.00
1500000
27 000.00
27,0 0.00
2
202.202 Removal Pavement Surface
355
Sy
3.25
If 153.75
3.00
1 065.00
3
202.203 Pavement Butt Joints
501
SY
20.00
1,000.00
20.00
1000.00
4
203.20 Common Excavation
3,6001
CY
13.00
46 800.00
13.00
46 800.00
5
203.210 Rock Excavation
10
CY
200.00
2,000.00
100.00
1000.00
6
203.231 Health and Safety Pian
1
LS
10 000.00
10 000.00
2,500.00
2500.00
7
203.233 Special Excavation
20
TON
100.00
2,000.00
180.00
3,600.00
8
304.08 Aggregate Base Course - Gravel
3,445
CY
17.00
58 565.00
22.00
75 790.00
9
403.207 3/4" 19mm Hot Mix Asphalt
620
TON
95.00
58 900.00
82.00
50 840.00
10
203.210 3/8" 9.5mm Hot Mix Asphalt
310
TON
112.00
34f720.00
98.00
30f380.00
11
403.209 3/8" 9.5mm HMA sidewalks
125
TON
160.00
20 000.00
160.00
20 000.00
12
409.15 Bituminous Tack Coat Applied
100
GAL
17.00
1700.00
20.00
2,000.00
13
603.10 10" Storm Drain
100
LF
60.00
6,000.00
60.00
6,000.00
14
603.159 12" Storm Drain
70
LF
70.00
4,900.00
60.00
4,200.00
15
604.092 Catch Basin Type B1 -C
41
VF
450.00
18 450.00
500.00
20 500.00
16
604.15 Drain Manhole
26
VBF
525.00
13 650.00
700.00
18 200.00
17
604.18 Adjusting Manhole or CB to Grade
2
EA
600.00
1,200.00
500.00
1 000.00
18
605.09 6" Underdrain
390
LF
25.00
9,750.00
25.00
9,750.00
19
605.11 12" Type C Underdrain
170
LF
60.00
10 200.00
50.00
8,500.00
20
608.26 Detectable Warning Field SW rams
120
SF
33.00
3,960.00
33.00
3,960.00
21
609.11 Vert. Curb Type 1 - Granite
1,008
LF
34.00
34 272.00
32.00
32 256.00
22
609.38 Vert. Curb Remove Reset
150
LF
16.00
2,400.00
35.00
5,250.00
23
615.07 Loam
160
CY
38.00
6,080.00
40.00
6,400.00
24
618.13 Seeding Method No. 1
20 UNIT
21.00
420.00
20.00
400.00
25
619.12 Mulch
201 UNIT
13.00
260.00
12.00
240.00
26
621.10 Deciduous Treet 2" Cal Min.
7
EA
300.00
2,100.00
300.00
2,100.00
27
626.34 Pedestiran Signal Pole Foundation
4
EA
630.00
2,520.00
600.00
2,400.00
28
626.34 Signal Pole Foundation
4
EA
1 365.00
5,460.00
1130000
5200.00
29
626.35 Controller Cabinet Foundation
1
EA
780.00
780.00
800.00
800.00
30
627.7114" White or Yellow Pvt. Marking Line
2,650
LF
0.22
583.00
0.40
1060.00
31
627.75 White or Yellow Pvt./Curb Markin
1,12-0-
SF
0.75
840.00
2.00
2,240.00
32
627.95 Textured Pavement Crosswalk
2,160
SF
14.00
30 240.00
11.00
23 760.00
33
629.05 Hand Labor
10
MH
25.00
250.00
25.00
250.00
34
631.12 All Purpose Excavator
10
MH
100.00
1,000.00
100.00
1 000.00
35
631.172 Truck - Large
10
MH
55.00
550.00
55.00
550.00
36
643.72 Temporary Traffic Signals
1
LS
5,900.00
5,900.00
6-,0-00.00
6 000.00
37
643.80 Traffic Signals at Intersection
1
LS
100 000.00
100 000.00
96 000.00
96 000.00
38
645.00 Remove & Reset Sin
4
EA
150.00
600.00
150.00
600.00
39
645.12 Overhead Signs w hardware
104
SF
30.00
3,120.00
24.00
2,496.00
40
645.25 Roadside Sin
20
SF
47.00
940.00
100.00
2,000.00
41
645.28 Sin Post
2
EA
200.00
400.00
150.00
300.00
42
652.36 Maintenance of Traffic
1
LS
4 000.00
410-0-0.00
5,000.00
5,000.00
43
652.38 Flagger
900
MH
20.00
18 000.00
15.75
14 175.00
44
659.10 Mobilization Not to Exceed 5%
1
LS
31000.00
31000.00
28 000.00
28 000.00
Total Project Bid:
S43,663.75
572,i62.00
10 144
City of Bangor
Bid Tabulation - Main/Cedar Street Intersection Improvements
Bid Opening: 03/31/10
Page 3
(Lane Construction
Bangor, ME
Sargent Corp.
Stillwater, ME
Item
Description
Qty.
Unit
Unit
Price
Total
Price
Unit
Price
Total
Price
1
202.080 Building Removal
1
LS
25 000.00
25 000.00
35 350.00
35,3 0.00
2
202.202 Removal Pavement Surface
355
SY
1.50
532.50
2.00
710.00
3
202.203 Pavement Butt Joints
501
SY
20.00
1000.00
26.00
1,300.00
4
203.20 Common Excavation
3 600
CY
22.50
81 000.00
9.00
32 400.00
5
203.210 Rock Excavation
10
CY
165.00
1650.00
250.00
2,500.00
6
203.231 Health and Safety Plan
1
LS
2,500.00,
21500.0
1000.00
1000.00
7
203.233 Special Excavation
20
TON
75.00
1,500.00
140.00
2,800.00
8
304.08 Aggregate Base Course - Gravel
3,445
CY
33.00
113 685.00
24.00
82 680.00
9 1403.207
3/4" 19mm Hot Mix As halt
620
TON
82.00
50 840.00
105.00
65 100.00
10
203.210 3/8" 9.5mm Hot Mix Asphalt
310
TON
98.00
30,3 0.00
115.00
35 650.00
11
403.209 3/8" 9.5mm HMA sidewalks
125
TON
155.00
19 375.00
200.00
25 000.00
12
409.15 Bituminous Tack Coat Ap lied
100
GAL
17.00
11700.00
1.00
100.00
13
603.10 10" Storm Drain
1001
LF
37.00
3,700.00
46.00
4,600.00
14
603.159 12" Storm Drain
70
LF
62.00
4,340.00
58.00
4,060.00
15
604.092 Catch Basin Type BI -C
41
VF
475.00
19 475.00
550.00
22,5 0.00
16
604.15 Drain Manhole
26
VBF
350.00
9,100.00
475.00
12 350.00
17
604.18 Adjusting Manhole or CB to Grade
2
EA
615.00
1,230.00
750.00
1,500.00
18
605.09 6" Underdrain
390
LF
21.00
8,190.00
33.00
12 870.00
19
605.1112" Type C Underdrain
170
LF
44.00
7,480.00
50.00
8,500.00
20
608.26 Detectable Warning Field SW rams
120
SF
33.00
3,960.00
40.00
4,80 .00
21
609.11 Vert. Curb Type 1 - Granite
1,008
LF
32.00
32 256.00
40.00
40 320.00
22
609.38 Vert. Curb Remove Reset
150
LF
21.00
3,150.00
48.00
7,200.00
23
615.07 Loam
160
CY
32.00
5,120.00
35.00
5,600.00
24
618.13 Seeding Method No. 1
201 UNIT
13.00
260.00
25.00
500.00
25 1619.12
Mulch
20 UNIT
13.00
260.00
15.00
300.00
26
621.10 Deciduous Treet 2" Cal Min:
7
EA
300.00
2,100.00
350.00
2,450.00
27
626.34 Pedestiran Signal Pole Foundation
4
EA
675.00
2,700.00
800.00
3,200.00
28
626.34 Signal Pole Foundation
4
EA
1425.00
5,700.00
1700.00
6,800.00
29
626.35 Controller Cabinet Foundation
1
EA
825.00
825.00
980.00
980.00
30
627.7114" White or Yellow Pvt. Marking Line
2,650
LF
0.22
583.00
0.50
1325.00
31
627.75 White or Yellow Pvt./Curb Marking
1,120
SF
0.85
952.00
2.50
2,800.00
32
627.95 Textured Pavement Crosswalk
2,160
SF
10.00
21 600.00
8.00
17 280.00
33
629.05 Hand Labor
10
MH
42.00
420.00
35.00
350.00
34
631.12 All Purpose Excavator
10
MH
158.00
1,580.00
165.00
1,650.00
35
631.172 Truck - Large
10
MH
90.00
900.00
95.00
950.00
36
643.72 Temporary Traffic Signals
1
LS
6,200.00
6,200.00
6,9 0.00
6 950.00
37
643.80 Traffic Signals at Intersection
1
LS
98 000.00
98 000.00
106 500.00
106 500.00
38
645.00 Remove & Reset Sin
4
EA
76.00
304.00
225.00
900.00
39
645.12 Overhead Signs w hardware
104
SF
29.00
3,016.00
35.00
3,640.00
40
645.25 Roadside Sin
201
SF
20.00
400.00
55.00
1,100.00
41
645.28 Sign Post
2
EA
180.00
360.00
235.00
470.00
42
652.36 Maintenance of Traffic
1
LS
91000 ` 00
9 000.00
5,500.00
5,500.00
43
652.38 Flagger
900
MH
16.00
1-414-00.00
30.00
27 000.00
44
659.10 Mobilization Not to Exceed 5%
1
LS
29 000.00
29 000.00
28 500.00
28 500.00
Total Project Bid: I
I
625 723.50 1
628 085.00
City of Bangor
Bid Tabulation - Main/Cedar Street Intersection Improvements
Bid Opening: 03/31/10
Page2
Hughes Bros
Ham den, ME
CPM Constructors
Free ort, ME
Item
Description
Qty.
Unit
Unit
Price
Total
Price
Unit
Price
Total
Price
1
202.080 Building Removal
1
LS
52 300.00
52,30 .00
30 000.00
30 000.00
2
202.202 Removal Pavement Surface
355
SY
2.70
958.50
3.50
1,242.50
3
202.203 Pavement Butt Joints
501
SY
21.00
1050.00
20.00
1000.00
4
203.20 Common Excavation
3 600
CY
14.00
50 400.00
12.00
43 200.00
5
203.210 Rock Excavation
10
CY
75.00
750.00
100.00
1000.00
6
203.231 Health and Safety Plan
1
LS
1,500.00
1 500.00
3250.00
3,250.00
7
203.233 Special Excavation
20
TON
100.00
2,000.00
90.00
1,800.00
8
304.08 Aggregate Base Course - Gravel
3,445
CY
20.00
68 900.00
25.00
86 125.00
9 1403.207
3/4" 19mm Hot Mix Asphalt
620
TON
85.00
52 700.00
82.00
50 840.00
10
203.210 3/8" 9.5mm Hot Mix Asphalt
310
TON
100.00
31 000.00
98.00
30 380.00
11
403.209 3/8" 9.5mm HMA sidewalks
125
TON
160.00
20,0 0.00
155.00
19 375.00
12
409.15 Bituminous Tack Coat Applied
100
GAL
20.00
2,000.00
17.00
1,700.00
13
603.10 10" Storm Drain
100
LF
60.00
6,000.00
45.00
4,500.00
14
603.159 12" Storm Drain
70
LF
75.00
5,250.00
54.00
3,780.00
15
604.092 Catch Basin Type BI -C
41
VF
600.00
24 600.00
270.00
11 070.00
16
604.15 Drain Manhole
26
VBF
600.00
15 600.00
300.00
7,800.00
17
604.18 Adjusting Manhole or CB to Grade
2
EA
700.00
1400.00
500.00
1,000.00
18
605.09 6" Underdrain
390
LF
30.00
11 700.00
36.00
14 040.00
19
605.1112" Type C Underdrain
170
LF
65.00
11050.00
58.00
9,860.00
20
608.26 Detectable Warning Field SW rams
120
SF
55.00
6,600.00
70.00
8,400.00
21
609.11 Vert. Curb Type 1 - Granite
1,008
LF
32.00
32 256.00
34.00
T4,272.00
22
609.38 Vert. Curb Remove Reset
150
LF
20.00
3,000.00
31.00
4 650.00
23
615.07 Loam
160
CY
28.00
4,480.00
20.00
31200.00
24
618.13 Seeding Method No. 1
20 UNIT
20.00
400.00
30.00
600.00
25
619.12 Mulch
20 UNIT
10.00
200.00
28.00
560.00
26
621.10 Deciduous Treet 2" Cal Min.
7
EA
350.00
2,450.00
750.00
5,250.00
27
626.34 Pedestiran Signal Pole Foundation
4
EA
700.00
2,800.00
700.00
2,800.00
28
626.34 Signal Pole Foundation
4
EA
1500.00
6,000.00
1400.00
5600.00
29
626.35 Controller Cabinet Foundation
1
EA
1000.00
1000.00
900.00
900.00
30
627.7114" White or Yellow Pvt. Markin Line
2,650
LF
0.25
662.50
0.50
1,325.00
31
627.75 White or Yellow Pvt./Curb Markin
1,1-2-0-
SF
0.95
1,064.00
1.00
1,120.00
32
627.95 Textured Pavement Crosswalk
2,160
SF
15.00
32 400.00
18.00
38 880.00
33
629.05 Hand Labor
10
MH
25.00
250.00
30.00
300.00
34
631.12 All Purpose Excavator
10
MH
125.00
11250 ` 00
110.00
1,100.00
35
631.172 Truck - Large
10
MH
55.00
550.00
65.00
650.00
36
643.72 Temporary Traffic Signals
1
LS
6,000.00
6,000.00
6,500.00,
6,5 0.00
37
643.80 Traffic Signals at Intersection
1
LS
100 000.00
100 000.00
107 000.00
107 000.00
38
645.00 Remove & Reset Sin
4
EA
400.00
1,600.00
500.00
2,000.00
39
645.12 Overhead Signs w hardware
1041
SF
34.00
3,536.00
35.00
3,640.00
40
645.25 Roadside Sin
20
SF
45.00
900.00
50.00
1,000.00
41
645.28 Sin Post
2
EA
120.00
240.00
225.00
450.00
42
652.36 Maintenance of Traffic
1
LS
335000
3,350.00
19 750.00
19 750.00
43
652.38 Flagger
900
MH
20.00
18 000.00
20.00
18 000.00
44
659.10 Mobilization Not to Exceed 5%
1
LS
800000
8,00-0.00
30 000.00
30 000.00
Total Project Bid:
596 147.00
619 909.50
10 144
City of Bangor
Bid Tabulation - Main/Cedar Street Intersection Improvements
Bid Opening: 03/31/10
Page 4
R. F. Jordan & Sons
Ellsworth, ME
Item
Description
Qty.
Unit
Unit
Price
Total
Price
1
202.080 Building Removal
1
LS
33 000.00
33 000.00
2
202.202 Removal Pavement Surface
355
SY
5.00
1,775.00
3
202.203 Pavement Butt Joints
501
SY
15.00
750.00
4
203.20 Common Excavation
-3,6-0-0-
CY
20.00
72 000.00
5
203.210 Rock Excavation
10
CY
300.00
3,000.00
6
203.231 Health and Safety Plan
1
LS
1,000.00
1,00 .00
7
203.233 Special Excavation
20
TON
125.00
2,5-00.00
8
304.08 Aggregate Base Course - Gravel
3,445
CY
30.00
103 350.00
9
403.207 3/4" 19mm Hot Mix Asphalt
620
TON
90.00
55 800.00
10
203.210 3/8" 9.5mm Hot Mix Asphalt
310
TON
110.00
34 100.00
11
403.209 3/8" 9.5mm HMA sidewalks
125
TON
175.00
21 875.00
12
409.15 Bituminous Tack Coat Applied
100
GAL
17.00
1700.00
13
603.10 10" Storm Drain
100
LF
60.00
6,000.00
14
603.159 12" Storm Drain
70
LF
62.00
4,340.00
15
604.092 Catch Basin Type BI -C
41
VF
450.00
18,45 .00
16
604.15 Drain Manhole
26
VBF
550.00
14 300.00
17
604.18 Adjusting Manhole or CB to Grade
2
EA
900.00
1,800.00
18
605.09 6" Underdrain
390
LF
43.00
16 770.00
19
605.11 12" Type C Underdrain
170
LF
80.00
13 600.00
20
608.26 Detectable Warning Field SW rams
120
SF
32.00
3,840.00
21
609.11 Vert. Curb Type 1 - Granite
1,008
LF
32.00
32 256.00
22
609.38 Vert. Curb Remove Reset
150
LF
16.00
2,400.00
23
615.07 Loam
1601
CY
28.00
4,480.00
24 1618.13
Seeding Method No. 1
201 UNIT
12.00
240.00
25
619.12 Mulch
20 UNIT
12.00
240.00
26
621.10 Deciduous Treet 2" Cal Min.
7
EA
275.00
1,925.00
27
626.34 Pedestiran Signal Pole Foundation
4
EA
1000.00
4000.00
28
626.34 Signal Pole Foundation
4
EA
1850.00
71400.00
29
626.35 Controller Cabinet Foundation
1
EA
1000.00
1,00 .00
30
627.7114" White or Yellow Pvt. Marking Line
2,650
LF
0.22
583.00
31
627.75 White or Yellow Pvt./Curb Markin
1,1-2-0-
SF
0.80
896.00
32
627.95 Textured Pavement Crosswalk
2,160
SF
14.00
30 240.00
33
629.05 Hand Labor
10
MH
30.00
300.00
34
631.12 All Purpose Excavator
101
MH
105.00
1050.00
35
631.172 Truck - Large
10
MH
58.00
580.00
36
643.72 Temporary Traffic Signals
1
LS
7500.00
7,500.00
37
643.80 Traffic Signals at Intersection
1
LS
100 000.00
100 000.00
38
645.00 Remove & Reset Sin
4
EA
400.00
1,600.00
39
645.12 Overhead Signs w hardware
104
SF
35.00
3,6 0.00
40
645.25 Roadside Sin
20
SF
45.00
900.00
41
645.28 Sign Post
2
EA
200.00
400.00
42
652.36 Maintenance of Traffic
1
LS
121000 00
12 000.00
43
652.38 Flagger
900
MH
22.00
19 800.00
44
659.10 Mobilization Not to Exceed 5%
1
LS
21 500.00
21150 .00
Total Project Bid:
664 880.00