HomeMy WebLinkAbout2013-08-26 13-289 ORDERCOUNCIL ACTION Item No. 13-289 Date: August 26, 2013 Item/Subject: ORDER, Authorizing Bid Award in the Amount of $179,350 to Eastwood Contractors for the Mildred/Nason Stormwater Project Responsible Department: Engineering Commentary: On August 7, 2013, the City received three (3) bids for the Mildred/Nason Stormwater Project. The bid prices ranged from $199,590 to $219,345 (see attached bid tabulation). The bids received exceeded the City's available funding. When the low bidder was contacted, the contractor offered to lower the per unit cost on certain items to enable the City to move forward with this project. On August 26, 2013, the Finance Committee will meet to review staff recommendation to award the contract to Eastwood Contractors in the amount of $179,350. The contract award recommendation must be reviewed approved by the City Council as it is over $100,000. Manager's Comments: Associated Information: Bid Tabulation Budget Approval: Legal Approval: Introduced for X Passage - Consent First Reading Referral Department Head e,g& rvk. City Manager Finance Director City Solicitor Page _of_ Assigned to Councilor Gallant CI`T'Y OF BANGOR 13-289 AUGUST 26, 2013 (TITLE.) Order, Authorizing Bid Award in the Amount of $1790,350 to Eastwood Contractors for the Mildred/Nason Stormwater Project By the City Council of the City of Bangor: ORDERED, THAT, Deborah Cyr, Finance Director is hereby authorized to execute a contract with Eastwood Contractors in the amount of $179,350 for the Mildred/Nason Stormwater Project. IN CITY COUNCIL August 26, 2013 Passed TY CLE 13-289 AUGUST 26, 2013 City of Bangor Bid Tabulation - Mildred/Nason Street Stormwater Project Rini nnoninn• nR/n7/7n1a City of Bangor Bid Tabulation - Mildred/Nason Street Stormwater Project Rirl nneninn- OR/07/7013 140,146.00 r Lou Silver Orono, ME R.F. Jordan & Sons Ellsworth, ME Item Description Qty. Unit Unit Price Total Price Unit Price Total Price 1 COMMON EXCAVATION 20 CY 25.00 500.00 25.00 500.00 2 ROCK REMOVAL 10 CY 150.00 1,500.00 150.00 1,500.00 3 GRAVEL 580 CY 20.00 11 ,600.00 35.00 20 300.00 4 3/4" H.M.A. PAVEMENT 120 TON 240.00 28 800.00 135.00 16 200.00 5 3/8" H.M.A. PAVEMENT 20 TON 240.00 4,800.00 135.00 2,700.00 6 CONCRETE CURB 1710 LF 9.50 16 245.00 12.00 20 520.00 7 4' DIA CATCH BASIN 60 VF 600.00 36 000.00 450.00 27 000.00 8 5' DIA CATCH BASIN 7 VF 950.00 6,650.00 675.00 4,725.00 9 4" STORMDRAIN LAT. 36 LF 70.00 2,520.00 60.00 2,160.00 10 10" STORMDRAIN 60 LF 70.00 4,200.00 60.00 3,600.00 it 12" TYPE C UNDERDRAIN 1390 LF 52.00 72 280.00 73.00 101 470.00 12 30" STORMDRAIN 40 LF 120.00 4,800.00 160.00 6,400.00 13 8" TYPE B UNDERDRAIN SMOOTHBORE 72 LF 68.00 4,896.00 50.00 3,600.00 14 ADJUST CB F&C TO GRADE 2 EACH 600.00 1,200.00 450.00 900.00 15 CORE & BOOT EXIST. STRUCTURE 2 EACH 600.00 1,200.00 450.00 900.00 16 RIP RAP 12 CY 100.00 1,200.00 60.00 720.00 17 ILOAM 150 CY 60.00 9,000.00 35.00 51250.00 18 ISEED 18 UNIT 60.00 1080.00 1 50.00 900.00 Total Project Bid: 208 471.00 219 345.00 City of Bangor Bid Tabulation - Mildred/Nason Street Stormwater Project Rirl nneninn- OR/07/7013 140,146.00 Eastwood Contractors Brewer, ME EASTWOOD REVISION Item Description Qty. Unit Unit Price Total Price Unit Price Total Price 1 COMMON EXCAVATION 20 CY 5.00 100.00 5.00 100.00 2 ROCK REMOVAL 10 CY 150.00 1,500.00 150.00 1,500.00 3 GRAVEL 580 CY 16.00 9,280.00 16.00 9,280.00 4 3/4" H.M.A. PAVEMENT 120 TON 150.00 18 000.00 150.00 18 000.00 5 3/8" H.M.A. PAVEMENT 20 TON 150.00 3,000.00 150.00 3,000.00 6 CONCRETE CURB 1710 LF 9.00 15 390.00 9.00 15,390.0F 7' 4' DIA CATCH BASIN 60 VF 360.00 21 600.00 360.00 21 600.00 8 S DIA CATCH BASIN 7 VF 600.00 4,200.00 600.00 4,200.00 9 4" STORMDRAIN LAT. 36 LF 70.00 2,520.00 50.00 1,800.00 10 10" STORMDRAIN 60 LF 55.00 3,300.00 54.00 3,240.00 11 12" TYPE C UNDERDRAIN 1390 LF 76.00 105 640.00 62.00 86 180.00 12 30" STORMDRAIN 40 LF 90.00 3,600.00 90.00 3,600.00 13 8" TYPE B UNDERDRAIN SMOOTHBORE 72 LF 50.00 3,600.00 50.00 3,600.00 14 ADJUST CB F&C TO GRADE 2 EACH 400.00 800.00 400.00 800.00 15 CORE & BOOT EXIST. STRUCTURE 2 EACH 500.00 1,000.00 500.00 1,000.00 16 RIP RAP 12 CY 30.00 360.00 30.00 360.00 17 LOAM 150 CY 20.00 3,000.00 20.00 31000.00 18 ISEED 18 UNIT 150.00 2170000 150.00 2,700.00 Total Project Bid: 199 590.00 179,350-00