HomeMy WebLinkAbout2013-06-10 13-195 ORDERCOUNCIL ACTION Item No. 13-195 Date: June 10, 2013 Item/Subject: ORDER, Authorizing Bid Award in the Amount of $1,838,482 to Sargent Corporation for Canal Fill Wildlife Mitigation Responsible Department: Airport Commentary: On May 17, 2013, the City received four (4) bids for Canal Fill Wildlife Mitigation. The base bid prices ranged from $1,838,482 to $3,150,710 (see attached bid tabulation). This is an Airport Improvement Plan (AIP) funded project. The project cost is funded 90% with Federal funds, 5% State funds and 5% Airport funds. In order to obtain the AIP grant funds, the City must bid the work and award the contract. This information is then submitted to the FAA for execution of the grant document. On June 3, 2013, the Finance Committee approved staff recommendation to award the contract to Sargent Corporation in the amount of $1,838,482. The contract award recommendation must be reviewed approved by the City Council as it is over $100,000. Manager's Comments: Associated Information: Bid Tabulation Budget Approval: Legal Approval: Introduced for X Passage - Consent First Readbng Referral Department Head Finance Director City Solicitor Page _ of _ Assigned to Councilor Blanchette CITY OF BANGOR 13-195 JUNE 10, 2013 (TITLE.) Order, Authorizing Bid Award in the Amount of $1,838,482 to Sargent Corporation for Canal Fill Wildlife Mitigation By the City Council of the City of Bangor:• ORDERED, THAT, Deborah Cyr, Finance Director is hereby authorized to execute a contract with Sargent Corporation in the amount of $1,838,482 for Canal Fill Wildlife Mitigation. IN CITY COUNCIL June 10, 2013 Approved CITY RR 13-195 JUNE 10, 2013 City of Bangor Bid Tabulation: Canal Fill Wildlife Abatement Project Bid Opening: 05 17 13 Lou Silver, Inc Orono ME Lane Construction Cheshire CT Item Description Qty. Unit Unit Price Total Price Unit Price Total Price M001-1 Mobilization 1 LS 100 000.00 10-0,000.00 145 000.00 145,00 .00 M001-2 As -Built Plans 1 FLS 1 3,000.00 31000.00 3,000.00 3,000.00 M001-3 Construction Barricades Lights and Flags 11 LS 20 000.00 20 000.00 40 000.00 40-10-0-0.00 M002-1 M003-1 Contractor's Safety Plan Contaminated Soil Removal & Replacement 1 10 LS CY 2,500.00 200.00 2,500.00 2,000.00 1,000.00 830.00 1,000.00 8,300.00 M004-1 Hazardous Material Removal 1 AL 12 000.00 12 000.00 12 000.00 12 000.00 M005-1 Clean Pie 120 LF 20.00 2,400.00 10.00 1,200.00 M005-2 Video Pie 120 LF 12.00 1,440.00 12.00 1,440.00 M006-1 Precast Concrete Arch Culvert 1 LS 800 000.00 800 000.00 1-15-0-0-10-0-0-0-0- 1 500 000.00 M006-2 lConcrete Arch Footing 1 280 LF 100.00 128 000.00 266.00 340 480.00 M007-1 Control of Water 11 LS 1 20 000.00 20 000.00 200 000.00 200 000.00 M009-1 Winter Conditions 11 AL 1 25 000.00 25 000.00 25 000.00 25 000.00 MO10-1 Small Repairs < 3" Deep 161 SF 1 250.00 4,000.00 275.00 4,400.00 MO10-2 Small Repairs > 3" Deep < 6" Deep 16 SF 350.00 5,600.00 300.00 4,800.00 M010-3 Small Repairs > 6" Deep 16 5F 450.00 7,200.00 350.00 5,600.00 M011-1 Security Grates 1 AL 60 000.00 60 000.00 6-0,0-0-0-0-0- 6-0,00-0.00 P152-1 Unclassified Excavation 4170-0- CY 12.00 56 400.00 18.00 84 600.00 P152-2 Rock Excavation 2,000 CY 175.00 350 000.00 80.00 160 000.00 P153-3 Remove Existing Drain Pie 132 LF 50.00 6,600.00 95.00 12 540.00 P152-4 Remove Existing Head & Wing Walls & Found 1 LS 43 000.00 43 000.00 16 000.00 16 000.00 P152-5 Embankment Fill 716-0-0- CY 18.00 136 800.00 28.00 212 800.00 P153-1 Controlled Low Strength Material 50 CY 100.00 5,000.00 102.00 5,100.00 P156-1 Inlet Protection 1 EA 1,000.00 11000.00 100.00 100.00 P156-2 Silt Fence 1,250 LF 4.00 5,000.00 1.30 1,625.00 P156-3 Install/Maintenance of Sediment Control 1 LS 10 000.00 10 000.00 40 000.00 40 000.00 P156-4 Me Construction General Permit App/Monitor i LS 2,500.00 2,500.00 500.00 500.00 P610-1 Structural Portland Cement Concrete 40 CY 1,570.00 62 800.00 1,780.00 71 200.00 P610-2 Steel Reinforcement 10-10-0- 0- LB 1.00 10 000.00 2.30 23 000.00 P620-1 Permanent Paint Markings 3-,0-0--0 SF 1.50 4,500.00 1.20 3,600.00 P620-2 Temporary Paint Markings 3,000 SF 1.50 4,500.00 1.10 3,300.00 D701-1 24" Reinforced Concrete Pipe Class III 45 LF 100.00 4,500.00 165.00 7,425.00 D701-2 42" Reinforced Concrete Pipe Class III 60 LF 175.00 10 500.00 240.00 14 400.00 D701-3 48" Reinforced Concrete Pipe Class III 1001 LF 1 225.00 22 500.00 245.00 24 500.00 D751-1 Adjust Structure to Grade 1 EA 1,500.00 1,500.00 950.00 950.00 D751-2 6' Catch Basin 1 EA 13 000.00 13 000.00 14 250.00 14 250.00 D751-3 4' Manhole Risers Arch Access 3 EA 3,000.00 9,000.00 5,000.00 15 000.00 T905-1 Topsoil 24 000 SY 2.50 60 000.00 3.65 87 600.00 Total Project Bid: 2,012,240.00 3 150 710.00 Alternate Bid: NO BID 2,72 163.00