Loading...
HomeMy WebLinkAbout2013-05-13 13-149 ORDERCOUNCIL ACTION Item No. 13-149 Date: May 13, 2013 Item/Subject: ORDER, Authorizing Bid Award in the Amount of $124,700 to Eastwood Contractors for Sewer Maintenance/ Repairs Responsible Department: Engineering Commentary: On April 17, 2013, the City received four (4) bids for Sewer Maintenance/Repairs, one of which was withdrawn at the bidders request due to omissions. The remaining bid prices ranged from $124,700 to $182,880 (see attached bid tabulation). On May 6, 2013, the Finance Committee approved staff recommendation to award the contract to Eastwood Contractors in the amount of $124,700. The contract award recommendation must be reviewed approved by the City Council as it is over $100,000. Manager's Comments: Associated Information: Bid Tabulation Budget Approval: Legal Approval: Introduced for X Passage - Consent First Reading Referral Jjlt� Department Head Finance Director ity Solicitor Page _ of _ Assigned to Councilor Nealley CITY OF BANGOR 13-149 MAY 13, 2013 (TITLE.) Order, Authorizing Bid Award in the Amount of $124,700 to Eastwood Contractors for Sewer Maintenance/ Repairs By the City Council of the City of Bangor. ORDERED, THAT, Deborah Cyr, Finance Director is hereby authorized to execute a contract with Eastwood Contractors in the amount of $124,700 for Sewer Maintenance/Repairs. 13-149 MAY 13, 2013 City of Bangor Bid Tabulation Proposal No.: P13-012: Sewer System Repair/Maintenance Proposal Opening: 04/17/2013 Lou Silver Orono, ME Item Description Lynch Contractors Holden, Maine Hughes Bros Hampden, ME Eastwood Contractors Brewer, ME Item Description Price Price Price Cost 1 Total Bid Cost 0 0.00 per If 150,100.00 per Square Yard of Paving 124,700.00 per s Cost per Linear Foot of Sewer Pipe Installed 150.00 per If 115.00 perif 300.00 _EEL Cost per Square Yard of Paving65.00 4,500.00 per s 115.00 per s 75.00 per s Cost per Square Yard of Loamin and Seeding4.00 per s 6.00 per s 40.00 per Cost per Square Yard of Concrete Pad Replacement 100.00 per s 200.00 per s 400.00 Cost per Manhole Replacement 3,000.00 each 8,000.00 each 6,500.00Cost er Cubic Yard of Flowable Fill Concrete 125.00 er c 90.00 er c 100.00 Lou Silver Orono, ME Item Description Price 1 Total Bid Cost 182,880.00 Cost per Linear Foot of Sewer Pipe Installed 400.00 per If Cost per Square Yard of Paving 58.00 per s Cost per Square Yard of Loaming and Seeding 8.00 per s Cost per Square Yard of Concrete Pad Replacement 650.00 per s Cost per Manhole Replacement 4,500.00 each Cost per Cubic Yard of Flowable Fill Concrete 75.00 per c