Loading...
HomeMy WebLinkAbout2016-07-25 16-283 ORDERCOUNCIL ACTION Item No. 16-283 Date: July 25, 2016 Item/Subject: Order, Authorizing Execution of Agreement for Maine Department of Transportation Local Project, Modification 2 — WIN 022693.00, Pedestrian Safety Improvements on Hogan Road Responsible Department: Engineering Commentary: This order will authorize the City Manager to execute a Local Project Agreement Modification 2 with the Maine Department of Transportation for an increase of $15,000.00 to the original contract amount. On February 3, 2016 an agreement was executed in the amount of $206,000.00 for new sidewalks along part of Hogan Road. The increase limit is not to exceed $221,000.00, with the Federal Share is $176,800.00 or 80% and the City Share is $44,200.00 or 20%. This has been reviewed by the Infrastructure Committee on July 25, 2016. John Theriault, City Engineer Department Head Manager's Comments: City Manager Associated Information Council Order/Agreement Budget Approval: Fina a Director Legal Approval: Introduced for X Passage First Reading Referral X , C licitor Page _ of _ Assigned to Councilor Sprague CITY OF BANGOR 16-283 JULY 25, 2016 (TITLE.) ORDER, Authorizing Execution of Agreement for Maine Department of Transportation Local Project — WIN 022693.00, Pedestrian Safety Improvements on Hogan Road ORDERED, THAT: the City Manager is hereby authorized and directed to execute an agreement with the Maine Department of Transportation for the following: An Agreement with the Maine Department of Transportation — Pedestrian Safety Improvements on Hogan Road — 022693.00 t (�H ON C-) H r Fv c� H v� cn r � UNi rHc' (�H ON C-) H r 16-283 JULY 25, 2016 AMS ID: CTM20141121000000000301 CSN:33829 TEDOCS #: maioneDff PROGRAM: Multimodal (OUC 57000) MAINE DEPARTMENT OF TRANSPORTATION Modification 2 to a Locally Administered Project Agreement With the Municipality of Bangor Regarding New Sidewalks on Hogan Road: WIN 022693.00 Modified Total Amount: $221,000 Federal Project #: TAP -2269(300) Modified Federal Share: $176,800 Federal Authorization: May 8, 2014 Modified Local Share: $44,200 Municipality's Vendor Customer #: VC1000007010 Contract Begin Date: 08/18/2014 Municipality's DUNS® Number: 07-173-9692 Contract End Date: 08/ 31 / 2018 CFDA #20.205: Highway Planning & Construction This Modification 2 applies to an Agreement with the Municipality of Bangor for new sidewalks along part of Hogan Road, which took effect Aug. 18, 2014 and was modified previously on Feb. 3, 2016. When executed, this modification will increase the Agreement by $15,000 — to a new upset limit of $221,000 — to cover the latest engineer's estimate, as follows: ❑ ARTICLE 1, Paragraph B (Funding): Revise the first sentence to read, "MaineDOT and the Municipality will share in the funding of the Project at the rates described in Article 3, "Financial Provisions," up to a maximum of two hundred twenty-one thousand dollars ($221,000). Project costs eligible for funding from MaineDOT shall not exceed this total amount without written approval from MaineDOT, through a duly executed modification to this Agreement." ❑ ARTICLE 3, Paragraph A (MaineDOT Share): Revise to read, "MaineDOT, with funding from the Federal Highway Administration, will share in the cost of the Project at the rate of eighty percent (80%) of expenditures eligible for federal financial participation, not to exceed one hundred seventy-six thousand eight hundred dollars ($176,800.)" ❑ ARTICLE 3, Paragraph B (Local Share): Revise to read, "The Municipality, using local funds, shall be responsible for twenty percent (20%) of federally eligible Project costs, including its share of such costs incurred by MaineDOT. For budgetary purposes, the local matching share is estimated to be forty-four thousand two hundred dollars ($44,200.) Furthermore: 1. The Municipality shall be responsible for any costs deemed ineligible for federal funding and all costs exceeding the maximum contribution from MaineDOT under Article 3A above, unless otherwise approved in writing by MaineDOT." Bangor. Modification 2 to Agreement for Hogan Road Sidewalks, WIN 022693.00 Page 1 of 2 All other terms and conditions of the original Agreement shall remain in place with no gap. MaineDOT and the Municipality of Bangor, by their duly authorized representatives, have executed this Modification 2 to the original Agreement on the date last signed below. Municipality of Bangor By: Catherine M. Conlow, City Manager Date: Maine Department of Transportation By: William A. Pulver, P.E., Director Bureau of Project Development Date: Bangor. Modification 2 to Agreement for Hogan Road Sidewalks, WIN 022693.00 Page 2 of 2