Loading...
HomeMy WebLinkAbout2016-09-26 16-357 ORDERCOUNCIL ACTION Item No. 16-357 Date: September 26, 2016 Item/Subject: ORDER, Authorizing Execution of a Modification Agreement for Maine Department of Transportation Local Project — WIN 021767.00, Improvements to the River Walk along the Penobscot River. Responsible Department: Engineering Commentary: This order would authorize the City Manager to execute of a Local Project Modification Agreement in the amount of $461,630 with the Maine Department of Transportation for design, right-of- way, construction, and construction engineering for reconstruction of 750 feet of waterfront sidewalk behind the Sea Dog Restaurant, and construction of new sidewalk for 180 feet along Front Street. Under the terms of the modification, the State/Federal contribution will increase the project total to $461,630 with an increase the State/Federal contribution to $369,304 (80%) and increase the municipal share to $92,326 (20%). The original agreement was reviewed and recommended for approval by the Infrastructure Committee at its April 12, 2016 meeting and approved by the Council on April 25, 2016, Council Order #16-162. The modification agreement was reviewed and approved by the Infrastructure Committee on September 13, 2016. John M. Theriault, City Engineer Department Head Manager's Comments: �1 1 City Manages Associated Information: Councilor Order and Agreement Budget Approval: N QUt4� Finance Director Legal Approval: ity Solicitor Introduced for X Passage _ First Reading Page _ of _ Referral 16-357 SEPTEMBER 26, 2016 Assigned to Councilor Nichols CITY OF BANGOR (TITLE.) ORDER, Authorizing Execution of a Modification Agreement for Maine Department of Transportation Local Project — WIN #021767.00, Improvements to the River Walk along the Penobscot River ORDERED, THAT: the City Manager is hereby authorized and directed to execute a modification agreement with the Maine Department of Transportation for the following: A Modification Agreement with the Maine Department of Transportation — Improvements to the River Walk along the Penobscot River, WIN # 021767.00 Copy of the agreement is attached. IN CITY COUNCIL SEPTEMBER 26, 2016 CO 16-357 ZD 9 CITY CLERK MaineDOT use only AMS ID: CTM20160804000000000072 CSN: 36344 NaireDff TEDOCS #: MAINE DEPARTMENT OF TRANSPORTATION Modification 1 to a Locally Administered Project Agreement City of Bangor Regarding Improvements to the River Walk along the Penobscot River: WIN 021767.00 Modified Agreement Amount: $461,630 Federal Project #: BPP -2176(700) Federal Share: $369,304 (80%) Project Authorization Date: Ma 27 2016 Municipal Share: $92,326(20%) Bangor's Vendor ID: VC1000007010 Effective Date: June 16, 2016 Bangor's DUNS® Number: 07-173-9692 Expiration Date: June 30, 2021 CFDA #20.205: Highway Planning & Construction Modification 1 applies to a sub -award agreement with the City of Bangor for the project referenced above that took effect June 16, 2016. When executed, this latest modification will add $200,000 to the Agreement, increasing the upset limit to $461,630, as follows: ❑ Article 1, Project Overview — Section B: Funding. This section shall be modified to read as follows: The estimated cost of the Project is four hundred sixty-one thousand six hundred thirty dollars ($461,630) to be shared as set forth in Article 3, "Financial Provisions." Project costs exceeding this upset limit shall require MaineDOT's written approval to be eligible for funding from MaineDOT. ❑ Article 3. Financial Provisions — Section A: MaineDOT Share. This section shall be modified to read as follows: MaineDOT will participate financially in Project costs eligible for funding from the Federal Highway Administration at the rate of eighty percent (80%), up to a maximum contribution at this rate of three hundred sixty-nine thousand three hundred four dollars ($369,304.) ❑ ARTICLE 3, Financial Provisions — Section B: Local Share. This section shall be modified to read as follows: The City, with funding other than from the U.S. Department of Transportation, shall share in all federally eligible Project costs at the rate of twenty percent (20%), or an estimated contribution of ninety-two thousand three hundred twenty-six dollars ($92,326). Furthermore, the City shall be responsible in full for any Project expenditures: 1. Incurred before the original execution date of the Agreement — June 16, 2016; 2. Deemed ineligible for federal financial participation; and 3. Exceeding the upset limit of this Agreement, asset forth in Article 113, "Funding." Agreement Modification 1, WIN 021767.00 Page I of 2 All other terms and conditions of the original Agreement shall remain in effect with no gap. MaineDOT and the City of Bangor, by their duly authorized representatives, have executed this latest modification to the original Agreement on the date last signed below. City of Bangor Catherine M. Conlow, City Manager Date: Maine Department of Transportation William A. Pulver, P.E., Director Bureau of Project Development Date: Agreement Modification 1, WIN 021767.00 Page 2 of 2