Loading...
HomeMy WebLinkAbout2016-09-26 16-356 ORDERCOUNCIL ACTION Item No. 16-356 Date: September 26, 2016 Item/Subject: ORDER, Authorizing Execution of Modification Agreement for Maine Department of Transportation Local Project — WIN 018645.00, Independent Street and Water Street Traffic Signal Improvements Responsible Department: Engineering Commentary: This order would authorize the City Manager to execute a Local Project Modification Agreement with the Maine Department of Transportation for preliminary engineering and construction work for traffic signal improvements at the intersection of Independent Street and Water Street. The modification agreement would change the project name from Independence and Water Street Traffic Signal Improvements to read Independent Street and Water Street Traffic Signal Improvements. No changes have been made to the funds originally agreed upon. The Maine Department of Transportation had approved federal and state funds in an amount not to exceed $262,543.00 which includes a Federal share of $210,034.40 or 80% of construction costs, State share of $26,254.30 or 10% of construction costs, and a City share of funding of $26,254.30or 10% of construction costs. The original agreement was reviewed and recommended for approval by the Infrastructure Committee at its March 24, 2015 meeting and approved by Council on April 13, 2015, Council Order #15-129. The modification agreement was reviewed and approved by the Infrastructure Committee on September 13, 2016. Manager's Comments: Associated Information: Councilor Order and Agreement Budget Approval: Legal Approval: Introduced for X Passage CONSENT _ First Reading Referral John Theriault, City Engineer Department Head �� ✓� Com, � City Manager k6tu� Finance Director L111111P!1P_ 'P -- OF OF Page _ of _ 16-356 SEPTEMBER 26, 2016 Assigned to Councilor Sprague CITY OF BANGOR (TITLE.) ORDER, Authorizing the Execution of Modification Agreement for Maine Department of Transportation Local Project — WIN #018645.00, Independent Street and Water Street Traffic Signal Improvements ORDERED, THAT: the City Manager is hereby authorized and directed to execute a modification agreement with the Maine Department of Transportation for the following: A Modification Agreement with the Maine Department of Transportation — Independent Street and Water Street Traffic Signal Improvements, WIN# 018645.00 Copy of the agreement is attached. IN CITY COUNCIL SEPTEMBER 26, 2016 CO 16-356 PASSED CITY CLERf MaineDOT use only TEDOCS #: AMS ID #: CTM20150608000000000786 CSN: 34533 MAINE DEPARTMENT OF TRANSPORTATION Modification 1 to a Locally Administered Project Agreement With the City of Bangor Regarding Traffic Signal Improvements at Independent Street and Broad Street Total Agreement Amount: $262,543.00 Federal Award Amount: $210,034.40 (80%) State Match: $26,254.30 (10%) Municipal Match: $26,254.30 (10%) Effective Date: May 27, 2015 Expiration Date: May 31, 2019 (MaineDOT Use Only) MaineDOT WIN: 018645.00 Federal Project Number: NFIPP-1864(500) Federal Authorization Date: Mgy 22, 2015 Bangor's Vendor ID: VC 1000007010 Bangor's DUNS® Number: 07-173-9692 CFDA #20.205: Highway Planning & Construction Modification 1 applies to an Agreement between MaineDOT and the City of Bangor for the project referenced above that took effect on May 27, 2015. When executed, this modification will revise the scope of work to match the description in the MaineDOT Work Plan, as follows: ❑ Article 1. Project Overview — Section A: Scope of Work. This section shall be modified to read as follows: "This Agreement shall apply to preliminary engineering and construction work for traffic signal improvements at the intersection of Independent Street and Broad Street (the Project.) Any substantial change to this scope of work shall require approval from BACTS and MaineDOT to be eligible for federal and state funding." All other terms and conditions of the original Agreement shall remain in effect with no gap. MaineDOT and the City of Bangor, by their duly authorized representatives, have executed this modification to the original Agreement on the date last signed below. City of Bangor By: Catherine M. Conlow, City Manager Date: Maine Department of Transportation By: Catherine Rand, Project Manager Date: Agreement Modification 1: WIN 018645.00 Page I of I