HomeMy WebLinkAbout2021-07-06 Infrastructure Committee Minutes1
Infrastructure Committee Minutes
July 06, 2021
ATTENDEES
Councilors: Rick Fournier, Clare Davitt, Sarah Nichols, Angela Okafor, Gretchen Shaefer,
Johnathan Sprague, Susan Hawes
Staff: John Theriault, Courtney O’Donnell
AGENDA
1. Discontinue Portion of Carver Street Right-Of-Way – Acceptance of Engineers Report
John outlined the Carver Street discontinuance meeting. In attendance were two abutters, with no
objection.
Motion made and seconded to accept City Engineer’s Report.
2. Approval to Submit Rebuilding American Infrastructure with Sustainability and Equity Grant
Application to Department of Transportation for Broadway Safety Improvement Project.
The Committee would be voting on the Ratification of the Engineer’s action to submit application for
an infrastructure project on Broadway from Interstate ramps Center Street, Alden Street, southbound
on and off ramps. He noted Gorrill Palmer did a preliminary study in 2019 and was the result of the
Broadway Corridor Study in 2015. Being a high crash area the MDOT got federal money and the City
would like to take advantage of the funding. The application was due prior to the next Council
meeting that would authorized the City Engineer to apply.
Motion made and seconded.
Motion made and seconded to adjourn.