HomeMy WebLinkAbout1974-06-24 213 AB ORDER i' 213 A3
E _
Introduced by Councilor Mooney, June 24, 1974
-�fr`f�,!JE oA�aca
CITY OFBANGOR
-
R9YER9YEDQ�
tl
(TIT EFL iber..........Acc.ep.t.ing....
at Main and Emerson Street
.................................................................................................................................................................................................................................................................
By the City Council of the City of Bangor:
®R9JJS R D9
THAT the attached report of the City Engineer relative to
the installation. of a new sidewalk, esplanade and granite curbing
on Main Street at Emerson. Street, and the reconstruction of
approximately 350 feet of Emerson Street be and hereby is accepted,
and be it further
ORDERED, that said improvements be made as soon. as possible, to be
assessed as noted in the City Engineer ' s report and be it further
ORDERED that the sum of $8,400 be appropriated from the Capital
Fund, Reserve for Future Construction. (General) , Account No.
92-2235, to establish new account No. 52-60-20. 12 (4009) ,
Emerson Street Improvements.
}
213 AB
r` IN CITY COUNCIL
June 24, 1974 t O R D E R
Passed.
i
Title,
i
CITY C I� �
Acce�tinc�,CitX.Enc�.s.Red: - Street �Impr.
. . . . . . . . . . . . . . .
at Main & Emerson St:. . .
L.
Introduced and filed by
. . .V! o . . . . . . . . t
.ouncilman �.
I
f I�
i
r
i1
i
rll
I�
�I
l
r'
i
7
CITY OF BANGOR, MAINE
Engineering Department
TO THE MUNICIPAL OFFICERS: June 20, 1974
In. accordance with a request from Mr. Thomas T. Walsh dated
September 11, 1973, a copy of which is attached, requesting that
the sidewalks and streets be improved on. Emerson. Street and on.
Main Street adjacent to Emerson Street, the following report is
submitted:
The improvements would consist of the installation of a new
concrete sidewalk, grass esplanade, and granite curbing on Main
Street in front of the Sheraton Inn., the installation. of an,
asphalt sidewalk and curbing on the-northerly side-of- Emerson
Street, the reconstruction of approximately 150 feet of the
Emerson Street roadway extending east from Main. Street, and the
bituminous concrete overlay of approximately 350 feet of the
existing surface of Emerson Street.
The total estimated cost of these improvements is $8,400. In.
accordance with CHAPTER VI, ARTICLE 4 , SECTION .2 of the Laws
and Ordinance, one-third (1/3) of the cost, or $2,800 would be
assessed against the property benefited, which in this case
would be Mr. Walsh.
Since the existing street surface and sidewalks are in very poor
condition, it is recommended that the improvements be made and
assessed as described above.
Respectfully submitted,
John T. Frawley
City Engineer
7
PA UL B UNYAN MOTOR INN
500 Main Street
BANGOR, MAINE 04401
Mr. John Frawley 1I 9/11/73
City Engineer
BanPzor , TTaine �
Dear Sir:
In reference to our telephone conversation this
morning, I would like to request the street and side-
walks be improved on Emerson Street in Bangor.
Thank you. Truly ,yours ,
rnas T. Walsh