No preview available
HomeMy WebLinkAbout1974-06-24 213 AB ORDER i' 213 A3 E _ Introduced by Councilor Mooney, June 24, 1974 -�fr`f�,!JE oA�aca CITY OFBANGOR - R9YER9YEDQ� tl (TIT EFL iber..........Acc.ep.t.ing.... at Main and Emerson Street ................................................................................................................................................................................................................................................................. By the City Council of the City of Bangor: ®R9JJS R D9 THAT the attached report of the City Engineer relative to the installation. of a new sidewalk, esplanade and granite curbing on Main Street at Emerson. Street, and the reconstruction of approximately 350 feet of Emerson Street be and hereby is accepted, and be it further ORDERED, that said improvements be made as soon. as possible, to be assessed as noted in the City Engineer ' s report and be it further ORDERED that the sum of $8,400 be appropriated from the Capital Fund, Reserve for Future Construction. (General) , Account No. 92-2235, to establish new account No. 52-60-20. 12 (4009) , Emerson Street Improvements. } 213 AB r` IN CITY COUNCIL June 24, 1974 t O R D E R Passed. i Title, i CITY C I� � Acce�tinc�,CitX.Enc�.s.Red: - Street �Impr. . . . . . . . . . . . . . . . at Main & Emerson St:. . . L. Introduced and filed by . . .V! o . . . . . . . . t .ouncilman �. I f I� i r i1 i rll I� �I l r' i 7 CITY OF BANGOR, MAINE Engineering Department TO THE MUNICIPAL OFFICERS: June 20, 1974 In. accordance with a request from Mr. Thomas T. Walsh dated September 11, 1973, a copy of which is attached, requesting that the sidewalks and streets be improved on. Emerson. Street and on. Main Street adjacent to Emerson Street, the following report is submitted: The improvements would consist of the installation of a new concrete sidewalk, grass esplanade, and granite curbing on Main Street in front of the Sheraton Inn., the installation. of an, asphalt sidewalk and curbing on the-northerly side-of- Emerson Street, the reconstruction of approximately 150 feet of the Emerson Street roadway extending east from Main. Street, and the bituminous concrete overlay of approximately 350 feet of the existing surface of Emerson Street. The total estimated cost of these improvements is $8,400. In. accordance with CHAPTER VI, ARTICLE 4 , SECTION .2 of the Laws and Ordinance, one-third (1/3) of the cost, or $2,800 would be assessed against the property benefited, which in this case would be Mr. Walsh. Since the existing street surface and sidewalks are in very poor condition, it is recommended that the improvements be made and assessed as described above. Respectfully submitted, John T. Frawley City Engineer 7 PA UL B UNYAN MOTOR INN 500 Main Street BANGOR, MAINE 04401 Mr. John Frawley 1I 9/11/73 City Engineer BanPzor , TTaine � Dear Sir: In reference to our telephone conversation this morning, I would like to request the street and side- walks be improved on Emerson Street in Bangor. Thank you. Truly ,yours , rnas T. Walsh