Loading...
HomeMy WebLinkAbout1964-09-14 201-R ORDER201-R lnbrodu,,d by Councilor Higgins, Sept. 14, 1964 CITY OF BANGOR (TITLE.)@rttreit__. Accepting report of the City Engineer Storm_ Sewer __... By the City County( of the City ofeasim. ORDERED, THAT the report of the City Engineer relative to the installation of a storm sewer on Mildred Avenue be and hereby Is accepted. RECEIVED 1964 SEP 10 PM 2:13 CITY CLERK'S OFFICE CITY OF UANGOR. WINE IN CITY COUNCIL Sept. 14, 1964 Tabled 201-R a RORR Title, Storm Sewer - Mildred Avenue ..................................... �..'lpt�duced ada Filea by ..councilman 201-R -2 CITY OF BANGOR, MAINE Engineering Department September 25, 1964 T0: The Munioipal Officers Some time age this office received a request from Leroy Cole of 75 Mildred Avenue that a drainage problem in front of his house be corrected. Mildred Avenue pitched in both directions to a low point which is located In front of the Cole property. The low paint was originally drained by an existing culvert across the road, whi eh discharged the storm water in a westerly direction towards Dow Air Force Base. However, Inasmuch as the property along the west side of Mildred Avenue has been developed by Cole, it has been somewhat filled in, and since the existing culvert is in bad repair, the existing drainage pattern no longer drains the surface water from Mildred Avenue and results in ponding of water in front of the Cole property, and also in front of the property of Ernest Mason located directly across the street. Various studies have been made showing possible correction to the drainage problem. One of the original proposals con- sisted of ditching Mildred Avenue from the low point back toward Leonard Street, with a new culvert to be installed across the intersection of Leonard Street, so as to carry the water along the undeveloped portion of Leonard Street towards Dow Air Force Base. Mr. John E. Porter of 68 Mildred Avenue (which is the comer lot on Mildred Avenue and Leonard Street) protested this proposal inasmuch as he felt an open ditch in front of his property would reduce the value of his property. At the direction of the Public Works Committee, the City Engineer made studies for an alternate solution find recommended the installation of catch basins at the low point an Mildred Avenue, one in front of the Hosed property and one in front Of the Cole property. The catch basins would be inter -connected with an 8 -inch pipe, with a 10 -inch outlet pipe extending north to Leonard Street, where it would discharge into an open ditch to be constructed along the westerly aide of Leonard Street.