Loading...
HomeMy WebLinkAbout1964-10-12 219-R ORDER219-R Introduced by Councilor Higgine, Oct. 12, 1964 CITY OF BANGOR (TITLE.) WritgX _. _. Accepting Report of the City, Eng neer- Construction of ............. _. _.. Pony Road. By the City Cmof the City ofBai gor. ORDERED, TRATthe report of the City Engineer showing the construction coats of Perry Road together with the list of possible assessments be and hereby is accepted. IN CITY COUNCIL Oct. 12, 1964 Referred to Public Works Cowittee, tabled. IN CITY COUNCIL Oct. 26, 1964 Remain on table. CITY CLLR IN CITY COUNCIL Nov. 9, 1964 Takes, frw table, PASSED i 219-R RECEIVED ORDER 1964 ssT-8 PK 1: o5 Title, CITY CLERK'S OFFICE LIiY OF RANCUR, MAINE Report of City Eng. - Reconstruction ................................ of Perry Road. ...................................... Int aced and filed�/-by ... ?...A•A .. Cow 219-R -2 CITY OF BANGOR, MAINE Engineering Department October 12, 1964 To: The Municipal Officers Reference is made to City Council Order 212-R9 passed September 28, 1964, directing the City Engineer to prepare pians and cost estimates for the construction of Perry Road from Ste Present terminus north to Odlin Hoed, together with a list of passible assessments. Surveys have been completed and plans prepared which will provide for the construction to extend from the present completed terminus located two hundred seventy (270) feet west of Thatcher Street to Cilia Road, being a distance of seven thousand sixty- three (7,063) feet. The new roadway will consist of a 24 foot travel way having a tar surface on a 24 inch gravel base with 3 foot shoulders on each side and including the necessary grading, seeding and culvert installation, A portion of the roadway has been partially constructed near the Thatcher Street and and the actual expenditures to date are fifteen thousand nine hundred ninety-nine dollars and thirty-five cents ($15,999.35). The es- timated coat for completion of the roadway is sixty-five thousand dollars ($65,000.00), making a total estimated coat for the entire roadway of eighty thousand nine hundred ninety-nine dollars and thirty-five cents ($80,999.35). Of this amount, 506, or forty thousand four hundred ninety-nine dollars and sixty-seven cents (840,499.67), is assessable against the adjacent properties which are benefited. A breakdown of the proposed assessments are as follows: North Side Owner Frontage Estimated Assessment Maine Hamilton Corp. 435.26' $1,251.63 Railway Express Agency 218.66 628,78 Boy Scouts of America 379.41 1,091.03 F. R. Drummond Heirs 246,5 708.84 State of Maine (non -assessable) 291.0 836,80 Lydia A. Godsoe 425.5 1,223.57 Perry Heirs 968.53 2,785.10 Perry Beira (non-aeeeasable) 200,0 575.12 City of Bangor (non -assessable 508.88 1,463.56 Pearl Graffam 378.5 1,088..41 Webster Avenue (non -assessable) 69.3 199,28 Pearl Graffam 818.20 2,352.82 Bragg Heirs 145.13 417.34 Bragg Heirs (non -assessable) 550. 1,581.58 State of Maine (non -assessable) 476. 1,368,79 Barbara Simpson 830.64 2,388.59