Loading...
HomeMy WebLinkAbout2022-03-14 22-117 OrderCITY COUNCIL ACTION Council Meeting Date: Item No: Responsible Dept: Requested Action: Summary Committee Action Meeting Date: For: Against: City Manager City Solicitor Finance Director Map/Lot: Introduced for: Order Committee: Action: Staff Comments & Approvals Date: Item No: Assigned to Councilor: Internal Use Only TEDOCS #: CTM#: CSN9: STATE OF MAINE DEPARTMENT OF TRANSPORTATION MUNICIPAL PARTNERSHIP AGREEMENT WIN 025033.02 REGARDING BANGOR, STATE STREET This Cooperative Agreement (AGREEMENT) is entered into by and between the MAINE DEPARTMENT OF TRANSPORTATION ("MaineDOT"), an agency of state government with its principal administrative offices located on Child Street, Augusta, Maine, and the CITY OF BANGOR ("MUNICIPALITY"), a municipality in the State of Maine with offices located at 73 Harlow Street, Bangor, ME. WHEREAS, BANGOR shall perform a highway construction project consisting of a 2-inch mill and overlay of existing pavement on STATE STREET (U. S. Route 2), beginning at the intersection of Hogan Road and extending northerly 0.55 miles to the intersection of Young Street (RLM 14.5.860 to 146.410). It will involve replacing existing bituminous curb with slip form concrete curb and drainage improvements. (the "Project"). BANGOR estimates this project at $460,000.00. BANGOR SHALL: A. Procure all contracts for and oversee the Project on STATE STREET for the Work outlined above.- B. Cause such Work to be performed in accordance with a design by an engineer licensed in the State of Maine. The Licensed Engineer shall provide a certification to the Municipality and to MaineDOT that, in his/her professional opinion, the Project as designed will provide a smooth ride, not reduce the safety, mobility or structural quality of the state [state aid] road. All design documents must be stamped and signed in accordance with this provision by the Professional Engineer. C. Agree to secure all Federal, State and Local permits necessary to complete the work. BANGOR also agrees to secure any needed property rights in accordance with all applicable State and Federal Law. D. Agree that any exceptions to State Design Standards shall be documented as part of this process. This documentation shall compare the new design to the existing conditions for each of the exceptions to current design standards. Any such exceptions shall be displayed on the cover sheet for the Project plans with the signature and PE stamp of the engineer responsible for the design of the Project. E. Be responsible, within the Project limits, for the following: Rev. 11/14/2018 a. Ensuring that the safety of the corridor and the life of the resulting structural and design elements are equal to or better than existing conditions and design; b. Ensuring that the structures, roadways and/or design features affected by the Project work shall, at a minimum, be of improved quality in terms of materials and utility; c. Ensuring that the Project does not introduce safety hazards; d. Ensuring that the Project retains the same level of mobility or improves mobility of travel within the corridor, unless approved traffic calming measures are proposed; e. Ensuring that the Project does not decrease the life expectancy of this component of Maine's transportation system; and, f. Ensuring that the Project meets the current standards of Americans with Disabilities Act of 1990 (ADA) design requirements. F. Provide certification through their Engineer to MaineDOT that the Project is complete and was constructed as designed. G. Ensure that construction shall commence within EIGHTEEN (18) months and shall be certified complete within THIRTY-SIX (36) months of execution of this agreement. BANGOR may forfeit the unpaid balance of this grant if these deadlines are not met or they can not demonstrate earnest and good faith efforts to meet them. H. Be responsible for or cause its contractors to be responsible for all damage to public or private property of any kind resulting from any act, omission, neglect or misconduct of BANGOR or its contractors, including damage to vehicles passing through the Project limits. I. Bear all risk of loss relating to the Project and the Work regardless of cause. MAINEDOT SHALL: A. Provide a maximum $230,000.00 in State funds supporting the Work stated above. Reimbursement will be made by the Department at a minimum of 1/3 project completion upon receipt of supporting cost documentation from the Municipality. Payments will be made per Appendix A attached. The Department's Region Engineer shall review the costs and certify their eligibility prior to reimbursement of Municipal Partnership Initiative Funds. Payment by MaineDOT Municipal Partnership Initiative funds shall not exceed $230,000.00 or 50% of the actual costs incurred and paid by the Municipality. B. This project has been approved for Calendar Year 2023. If the Municipality commences construction of the project as outlined above prior to January 1, 2023, the Municipality assumes the risk and responsibility for costs incurred, in the event that funding levels fall below MaineDOT projections. If this occurs, MaineDOT will reimburse with the next available allotment. Rev. I I /1 O I S The CITY OF BANGOR and MaineDOT agree to function within all applicable laws, statutes, regulations, and AGREEMENT provisions; avoid hindering each other's performance; fulfill all obligations diligently; and cooperate in achievement of the intent of this AGREEMENT. IN WITNESS, WHEREOF, the parties hereto have executed this AGREEMENT effective on the day and date last signed. Dated: Dated: 10 CITY OF BANGOR Deborah A. Laurie City Manager STATE OF MAINE DEPARTMENT OF TRANSPORTATION an David Bernhardt Director, Maintenance and Operations Rev. 11/14/2018 a� " v U b as ca a 4.1 cu � a� o C a� W' W L IN CITY COUNCIL MARCH 14, 2022 CO 22-117 ACTION CITY CLERK