Loading...
HomeMy WebLinkAbout1967-03-13 97-U ORDER97-U Introduced by Councilor broadens, March 19, 1967 CITY OF BANGOR (TITLE) Mrhrt..._. ,cost of Conftraot= of Perry Read and nesess efts therefor. By tlw City Council ofbw City ofBa ior: ORDERED, THAT the attached report of the City engineer showing the actual cost of the construction of Perry Road be and hereby is accepted, and be it further OUMM, that the assessments be levied or deferred as outlined in said report, 17a67 ✓IFR 7 iY 8_f4 orFiCC IN CITY COUNCIL Verne 13, 1967 Referred to Public Works Committee, Clerk directed to advertise a publi hearing to be held March 27, 1967. Tabled. IN CITY COUNCIL March 27, 1967 Taken from table, hearing held, Potables. 'CITY CIERK IN CITY C L April 30, 1967 Taken from table, retabled. ITY CORD IN CITY COUNCIL In CITY COUNCIL 97-u July 24, 1967 sept. ss, 1962 Rain on table. Taken from table, retabled. CI CLBR O RDE R Y CLERK IN CITY COUNCIL ITY IL Title, Aug. 14, 1967 Sept. 25, 1967 Raken from table, Tare, from table, Construction of Perry Road & Assume— retabled. retabled. ..................................... . Ppptp. 7?,ppprmp,,,,,,, cSTY ...................... C IERK In CxmY COUNCIL Introduced and £' ed by / IH CITY CO L Oct. 16, 1967 Aug. 2B. 1967 Remain On table. I Remain on table. Co Reuncilman CITY C IN CITY COUNCIL IN cirY cCnflC xL xN coONC IL CITY C April 24,, 1967 Tune 12, 1967 Oct 2 967 main table. Taken from table, Councilor McKay Taken from table, retabled. Committee tabled. eu to eunc rvorrc _ bity 1 k 2 TY CI CMM IN If COUNCIL NOV. 13, 1967 COUN CiTy CLemc maken from table, ret abler]. May g' 1�7 CITY COMM Taken Prov, table, relented. lune 26, 1967 Taken from table, retabled. Nov C TY COIINCI 2 96] ed by deleting the lest paragraph & substituting C CIERK therefor the following: "Ordered that the assessments be levied IN CITY COUNCIL I Y CLEEK aaoutlined in said report or My 22, 1967 IN I COUNCIL deferred until developed;provided, Taken from table, retabled. duly 1 1967 however, that said deferral be , Remain on table. reviewed by the Council 1 year from this date". As amended,PASSKO. ITY CLO CITY IERK CITY CLERK CITY OF BANGOR, MAINE Engineering Department February 28, 1967 To: The Municipal Officers Reference Is made to City Oouncil Order 219-R, paused NOV. 9, 1964, accepting the report of the City Engineer regarding the es- timated construction costs and possible assessments for the con- struction of Perry Road, Construction of the roadway has been completed from its present terminus located 270 feet west of Thatcher Street to Colin Road, being a distance of 7,063 feet. The new roadway consists of a 24 foot wide travel way having a tar surface on a 24 inch gravel base with 3 foot Shoulders on each side, and including the necessary grading, seeding, and culvert installations. The total completed coat of this work was $81,649.00. Of this amount, 50%, or $400824,50, may be assessed against the adjacent properties which are benefited. A breakdown of the recommended assessments are as follows: NORTH AND EAST SIDE Owner Frontage To be To be Non - Levied Deferred Assessable Maine Hamilton Corp. 435.26 $1,229.72 Railway Apress Agency 218.66 617.77 .. Boy Scouts of America 379.41 $1,071.93 F.H,Drummond Heirs 282.72 798.76 State Highway Route 1-A 287.58 $ 812,49 *Neally & Associates 415.20 1,173.05 Lydia A. Godson 200.00 565.05 Valerie E.Jordan, at a1 200.00 565.05 Valerie E.Jorden,st al 777,35 2,196.22 City of Bangor 508.88 1,437.73 Grace Methodist Church 678.50 1,916.94 Webster Ave. 69.30 195.79 Grace Methodist Church 816.20 2,311,63 *Arthur Chapin as. 673.00 1,901.40 Interstate Highway 1-95 476.00 1,344.82 Barbara Simpson 830.64 2,346.77 SOUTH AND WEST SIDE Sanborn Motor Express 331.73 937.22 Godsoe Road 101.56 286.93 *Sadys F. Coney 250,00 706.32 *N.H.Bragg & Sons 450.00 1,271.37 Bangor, Maine April 7, 1967 Mr. John Frawley, Engineer City of Bangor Bangor, Maine Dear Mr. Frawley: The undersigned David W. Fox is acquiring a lot or parcel of land situate on the east aide of Essex street and being premises the title of which is presently standing in rue name of Allen L. Books. The said premises are located between 793 Essex Street and 631 Essex Street. The acquisition of said real estate is for the purpose of residential construction. The undersigned William M. Stockson is the owner of premises situate at 831 Essex Street. We request that a survey be made to determine the economic feasibility of installing a sewer line to service our respective properties. We would appreciate being advised as to the costs to each property owner of such a sewer installation. You are aware, of course, that the said properties must w be serviced bya septic tank system and since David W. Fox is planningto commence construction on said premises on or about May 1, 1967, your prompt attention to this matter will be appreciated Very truly yours, CITY OF BANGOR, MAINE Engineering Depaxtment February 28, 1967 To: The Municipal Officers Reference Is made to City Council Order 219-R, passed Nov. 9, 1964, accepting the report of the City Engineer regarding the es- timated construction costs and possible assessments for the con- struction of Perry Road. Construction of the roadway has been completed from its present terminus located 270 feet west of Thatcher Street to Odlin Road, being a distance of 7,063 feet, The new roadwayy consists of a 24 foot wide travel any having a tar surface on a 24 inch gravel base with 3 foot shoulders on each side, and Including the necessary grading, seeding, and culvert installations, The total completed cost of this work Was $81,649.00. Of this amount, 508, or $40,824.50, may be assessed against the adjacent properties which are benefited. A breakdown of the recommended assessments are as follows: NORTH AND EAST SIDE Owner Frontage To be To be Non - Levied Deferred Assessable Maine Hamilton Corp. 435.26 $1,229.72 Railway Express Agency 218.66 617.77 Boy Scouts of America 379.41 $1,071.93 F.H.Drummond Heirs 282.72 798.76 State Highway Seats 1-A 287.58 $ 812.49 *Neally & Associates 415.20 1,173.05 Lydia A. Sedate 200.00 565.05 Valeria E.Jordaa,et al 200.00 565.05 Valerie E.Jordaa,et al 777.35 2,196.22 City of Bangor 508.88 1,437.73 Grace Methodist Church 678.50 1,916.94 Webster Ave. 69.30 195.79 Grace Methodist Church 818.20 2,311.63 *Arthur Chapin Co. 673.00 1,901.40 Interstate Highway x-95 476.00 1,344.82 Barbara Simpson 830.64 2,346.77 SOUTH AND WEST SIDE Sanborn Motor Rxpress 331.73 937.22 Godsoe Road 101.56 286.93 *Sadye F. Coney 250.00 706,32 *N.H.Eragg & Sons 450.00 11271.37 --'CM OFFACCAL IT, C,dRM CARTEL is lid, G eIF AI .nv IN • I w ILL, P E 2 R Y _ R O A D - s., - r - YlQEIy v NIL,a -- BANGOR i/ HAM PDEN / Z� ' OPS n sE, hqE � 9 \IF IF > jLs PI F -- IF I A7I AI c r F c�40 CITY OF BANGOR ENGINEERING DEPARTA NT ASSESSMENT PLAN AAWN BY_1LL CRACEU BY ._ �NRGY(O t.1-,.. O E By SHUT 1 Uf 51 [E15 LE i" o E io-_i ZOO . z.