No preview available
HomeMy WebLinkAbout1966-12-12 36-U ORDER36_1 Introduced by Councilor Brocades, Dec. 12, 1966 -c CITY OF BANGOR (TITLE.) @rber,....... Accepting. Report of City Engineer Cost of Perry Road. By ems City Comwil of Ctty ofBanar: ORDERED, THAT the attached report.of the city Engineer relative to the actual cost of the Perry Road storm sewer be accepted, and be It further ORDERED, that the recommended assessment against N. H. Bragg & Sons be levied. t-IVED 1358 ASV 29 4M B. 50 vitt Cl ERS S OFFICE IN CITY COUNCIL Dec. 12, 1966 Clerk directed to advertise a public hearing for Dec. 28th, referred to Public Works C tttee, tabled. CITY RR IN CITY COUNCIL Dec. 28, 1966 Taken from table, hearing held, PASSED. CI 36x1 ORDER Tine, Coat of Perry ROW Strom Sewer ....................................... Introduced and filedby Councilmen IN �.. ,� . ...Pt•.., I... .a CITY OF BANGOR, MAINE Engineering Department November 28, 1966 To: Me Municipal Officers Reference is made to City Council Order 76-T, passed February 28, 1966, accepting a petition from N. H. Bragg & Sons for the installation of a 12 inch storm sewer on Perry Road in lieu of the originally proposed 8 inch storm drain. The larger size pipe was required to handle storm water from the Bragg property The original Installation of 8 inch pipe was estimated to cost 12,000. The substitution of the 12 inch pipe was esti- mated to cost an additional $1,200, and N, H. Bragg & Sons agreed to pay 75 percent of this overrun, or $900. This work has since been completed and the actual additional cost was $873 for the Installation of the 12 Inch pipe in lieu of the originally proposed 8 inch pipe, the actual assessment to N, R. Bragg & Sons would therefore be 75 percent of this amount, or $654,75. It 1s therefore recommended that assessment be levied against N. H. Bragg & Sons as noted above. Respectfully submitted, � John T. Frawley En Fr City Engineer JTF:L