HomeMy WebLinkAbout1966-12-12 36-U ORDER36_1
Introduced by Councilor Brocades, Dec. 12, 1966
-c CITY OF BANGOR
(TITLE.) @rber,....... Accepting. Report of City Engineer Cost of Perry Road.
By ems City Comwil of Ctty ofBanar:
ORDERED,
THAT the attached report.of the city Engineer relative to
the actual cost of the Perry Road storm sewer be accepted, and be
It further
ORDERED, that the recommended assessment against N. H. Bragg &
Sons be levied.
t-IVED
1358 ASV 29 4M B. 50
vitt Cl ERS S OFFICE
IN CITY COUNCIL
Dec. 12, 1966
Clerk directed to advertise a public
hearing for Dec. 28th, referred to
Public Works C tttee, tabled.
CITY RR
IN CITY COUNCIL
Dec. 28, 1966
Taken from table, hearing held, PASSED.
CI
36x1
ORDER
Tine,
Coat of Perry ROW Strom Sewer
.......................................
Introduced and filedby
Councilmen
IN �..
,� . ...Pt•.., I... .a
CITY OF BANGOR, MAINE
Engineering Department
November 28, 1966
To: Me Municipal Officers
Reference is made to City Council Order 76-T, passed
February 28, 1966, accepting a petition from N. H. Bragg & Sons
for the installation of a 12 inch storm sewer on Perry Road in
lieu of the originally proposed 8 inch storm drain. The larger
size pipe was required to handle storm water from the Bragg
property The original Installation of 8 inch pipe was estimated
to cost 12,000. The substitution of the 12 inch pipe was esti-
mated to cost an additional $1,200, and N, H. Bragg & Sons agreed
to pay 75 percent of this overrun, or $900.
This work has since been completed and the actual additional
cost was $873 for the Installation of the 12 Inch pipe in lieu
of the originally proposed 8 inch pipe, the actual assessment
to N, R. Bragg & Sons would therefore be 75 percent of this amount,
or $654,75.
It 1s therefore recommended that assessment be levied against
N. H. Bragg & Sons as noted above.
Respectfully submitted,
�
John T.
Frawley
En Fr
City Engineer