HomeMy WebLinkAbout1968-06-24 166-V ORDER1(6-v
Inkioduced by Councilor mcPay, June 29, 1966
CITY OF BANGOR
(TITLE.) (®rbfr,..Y1.v'f,�a.
./.yc.ICA /'t° �erWyr7 c .2.......
By the CUP Cou 1ofUw Ckv ofBmso:
;a v0*1m a
THAT the City Manager be authorized to enter into the
attached agreement with Metcalf 6 Eddy, Inc, for the preparation
of final plane and specifications for the second stage of the
Penobscot Interceptor Sewer construction, extending from the
Kenduskeag Pump Station siphon outlet chamber to the Hancock
Street sewer.
166-V
ORDER
Title,
IN
CITY
cOVNcxL ,
ne 968
PAB BED ' the following yes and Aft., Ci:y Naxiaa�eq to £n[ej. into,
0
vote: ooncil0[s :voting yes: Agreement with Metcalf 6 Why. As:
Ealdacci, B--
IOU InterCeptom Sewer
Barr. Hcusto Mc%ay. MinskY.......................................
Counc ilox ng no; Porter.
Brown unt absent. Introduced and filed by
CITY CLERK
Co®c
IN CITY COUNCIL
.lune 29, 1968
The ordinance requiring the filing of
an order was
uspende,l by the following
yes end no vote: Councilors voting
yes: Baldacci, BRllou, Barr, Houston,
McKay, Minsky, Porte[. Councilors Br -
and Hcnt abeent. This order was then
Y[-lMe-£ei3enin9-yee
received and PASSED.ne-.see.--exa<:axe-res:nq-rea.-
BeaaeeeaT-xa33xr-Bnwerr-xexeen,
Melfegr-+t4nekge--Eexne 43ex-eater-rxing
Ne---eeme33xe-
M ETCALF & EDDY e•nx 0u1eNGI n.••eNCE SM0211S
June 19, 1966
Mr. Jahn T. Frawley
City r
City Miall
Recent,
or, Maimaice 04401
Dear Mr. Frawley:
We submit the following pro sal [or y or consideration for
engineering services 9n comucttdu m carton of existing
contract drawheg's and do for - ant Panobeeot Interceptor
sewer, regulaU chambe ,and in rte siplwn from Ute siphon
outlet cbamber at the T' a 'uskeag ` �p & ties to the Gaacock Street
sewer connection.
;he w involves odify the contract drawings and speci-
fications for a Penobscot ID ep[or, Contract G6-2, winch Included
the awve de crlbe:i aectin o1 interceptor sewer, and providing, con-
tract dra an tl apeci cations for a separate construction contract.
A. Work of Engineers
We would ,vorde the followuig services
1. Prefmre contract drawings add documents suitable
for obtaining prottoeals from contractors for
construction and for setting forth the details of
We work.
2. Prepare estimates of quantities and cost
based upon the final completed drawings.
Air, John T. Frawley 2•
June 19, 1968
9. Furnish 20
sots of
contract drawings.
4. Furnish 25
sets of
contract documeom.
5. Assist the city in sneering tabulating end analyzing
bids for construction and submit recommendations
relative to the award of. contracts.
6. Assist the city in obtaining the required approval
of governmental agencies for the works.
_. CoxnxasatWn
Por the services stated under Section A compe"Idme, will be
the lump aem of $4,000 payable upon completion of the work. This fee
is based on the assumption of an changes in location or Rise of the
interceptor and appurtenant structures from Was shown on the 1066
contract drawings.
The said com�nsattun to be paid In two installments of $2,000
each. The first payment W become due upon submission of the completed
contract drawings In fcrm anitablo for use in mating reproductions, and
the second pay had within 60 days following approval of the drawings and
contract documents.
C. Time for Completion
The contract drawings and documents are W be completed within
6 weeks after autb0risat10n W proceed, provided that delays beyond the
control of Metcalf & rddy, tae. are not experienced. 11 delays arise
beyond the control of ..feW91f & Eddy, inc., additional time shall be
granted for completion.
n. Litigation and Additional Work
Nothing herein contained shall obligate :etcalf & Eddy, Inc. to
prepare for, or appear in, litigation on behalf of We City of Bangor or
otherwise; or to maize investigations, reports, or designs on matters
not included herein, except in consideration of additional compensation
W he mutually agreed upon.
°dr. John T. l'rawley
June I5, I°GG
TSank yua fair the opp;rtusity of stfxmitting this propoual and
your consideration thereof. We slull be pleased to review it at your
pleasure should there be questions, suggested additions, or deletions.
Aeepectfully,
METCALF & EDDY, INC.
J'V8ujgs John W. fffiyrnond, Jr.
Senior Vice President