HomeMy WebLinkAbout1969-08-25 253-W ORDER253-W
Introduced by Councilor Cm:, Aug. 25, 1969
CITY OF BANGOR
(TITLE.) MrDEYf........ pplrcatron., for Btuity yccati eermrt - Bangor Wydrn-
By the City Coymett oft City ofBanynr%
ORDERED,
THAT the attached application far utility location permit is hereby
granted.
note: Following are the public streets and highways referred to:
Beginning at an existing underground manhole, Owned by the Bangor Bydro-
Electric Camipany, located on the westerly side of Water Street, theme mmem-
ing easterly approximately 40 feet along said Water Street to Pickering Secure,
thence proceeding southerly approximately 520 feet along said Pickering Square
to a new underground mandole to be constructed on the southerly side of Lce-
perdent Street, thence proceeding easterly approximately 280 feet along said
Independent Street to aunderground manhole to be constructed on the easterly
side of Broad Street, thence proceeding northerly approximately 25 feet along
said Broad Street to Washington Street.
(This w advertised August 11, 1969 and the City Clerk has not received any
objections to this application
s ffk
IN CITY COUNCIL
Aug. 25, 1969
PASSED
CI CLURK
253-W
ORDER
Title,
Utility tocation Permit - 5H -e Co.
......... I ......... ................
.
Introduced andel (fipileedd'by
BANGOR •-MAINE
August ]2, 1969
W. Say Alley, City Clerk
City of Bangor
City Hall
Bangor, Maine 04491
Subject: AYBISC1CmK FOE UTYIHTY ICCATIDN BEEMff
➢ear W. Alley
In accord with your requirements. we hereby submit two (2)
copies each of Pores Application For Utility location permit sad
Utility location permit.
Urban Heneval requires that our overhead facilities within
the development Area must be installed underground. Therefore, we
apply berewitb for permission to construct new underground duct
line facilities along Water Street, Plckering Square, Independent
Street, and ffioad Street as described.
The Application per Utility location permit was published in
the Bangor Daily peva on August 11, 1969.
Yours very truly,
eUig�
Aaet. Electrical Engineer
TCH:mk
Enclosures
BANGOR
NLECTRIC
COMPANY
E:EE.mIt ,IN,.
>�n
oow�n �E�VINn
Eo„ EP. M 4 L N E
BANGOR •-MAINE
August ]2, 1969
W. Say Alley, City Clerk
City of Bangor
City Hall
Bangor, Maine 04491
Subject: AYBISC1CmK FOE UTYIHTY ICCATIDN BEEMff
➢ear W. Alley
In accord with your requirements. we hereby submit two (2)
copies each of Pores Application For Utility location permit sad
Utility location permit.
Urban Heneval requires that our overhead facilities within
the development Area must be installed underground. Therefore, we
apply berewitb for permission to construct new underground duct
line facilities along Water Street, Plckering Square, Independent
Street, and ffioad Street as described.
The Application per Utility location permit was published in
the Bangor Daily peva on August 11, 1969.
Yours very truly,
eUig�
Aaet. Electrical Engineer
TCH:mk
Enclosures
TO: NONICIBAL OMCSSB City of Bangor
B 09 By6ffi1-HISCMIC GtlFiPA a Nine corporation having its principal
Plate of business at Hangar, County of lanobscot, State of ➢him, being duly
mthorized pursuant to the lava of the State of 6htm to gemeram, Bell,
distribute aM Supply electricity in the City of Bsngorp County of Penobscot,
State of Naive, hereby applies for a permit to authorize It to locate, construet
and maintain certain of its facilities, berainafter described, upon, along,
under, over and across cartels public vat's situate in the municipality herain-
before referred to.
Amy person, firm or corporation CLimlog to be adveraely affected by
the proposed lomtiom described herein, aha31 file a vritten objection vith
mnrdcipal officers, City of Bangor, stating the cause of said objection vithln
14 days after the date of tbis publication.
LOMMm:
Hegiming at an existing uniergraaM manhole,
owned by the Bangor Hydto-Blectric Companys loeat9d ov
the westerly side of Hater Street, thence proceeding
easterly appro'wimately 40 feet along said Nater Street
to Pickering Square, thence proceeding southerly ap-
proximately 520 feet along said phckerisg Square to a
nev underground manhole to be constructed on tui
soutbarly side of Independent Street, theam proceeding
eutarly approxlisstely 280 feet along said Indepeademt
Street to a nev un"ramd manhole to be constructed
as tbe easterly nide of Hand Street, thence proceeding
northerly epproximately 25 feet along said Broad Street
to Yasbington Street.
OHSCSIBTI0N:
Sbe facilities will consist of vadergrwnd ductlime end mnholea, vires
and/or cables, together with associated appurtenances and avltching equipment.
rm minfm va depth to tbe top of the duetlima will te approrimtely 18 inches.
rbe ductlines and manholes will be covetracted within tbe limits of the public
way, but ontside the part thereof Customarily used for travel of vehicles in -
safer as possible. rhe initial amratdon of the facilities soil be at 24M
salts three phase} the voltage M31 be increased as occasloa therefor requires
for operation not in excess of 20 ". to grouts.
Bated at Bangor, Maine this VMORMRO =CMC Cabe
7th "Y of August. 3969. By: / C,
erne:: Alar. g>B am>�c
UP== IOCATION PERIM
Upon the application of BANSOR RYBBC-ESECTRIc =14PANY dated August '7, 19,%
requesting permiseia to locate certain of its feciliiiea hereinafter deseribe,
upon, along, under, over and across certain public ways in Bangor, County of
Penobscot, State of Maine, all as set forth in its application, it appears that
public notice thereof has been given by publishing to text of said application
an August ll, 1969, in Bary, r Daily Neve, a newspaper Circulated in tie afo-+esela
muteclpalltyi that within 14 days after the aforesuld �bllcation, no written
objection to the granting a &sit application hes been filed vita thin licensing
authority by and person, fim or corporation clni.iag to be adversely affected by
the location described in the eppilcation referred to. Wherefore permission in
hereby given to said Bangor Bydxo- ctrle Company to locate, construct and maintain
Certain of Its facilities l:emimfter described upon, along, under, over and across
certain public ways situate in this mnicipallty as fonesn:
LOCATION
Beginnin:C at an existing underground wanbole,
Cvnsd by the Harbor lbrdro-Nlectric Cmpmyx lomted on
the WBUrly aide of Water Street, thence proceeding
easterly apprcx"Uly 40 feet along said 'deter Street
to Piekxring Ecoare, thence proceeding lout Orly ap-
proximately 520 feet along said Pickering Square to a
nev undergrobmi .--aa^ale to be constructed no the
southerly side of Independent street, thence proceeding
easterly approxLetely 280 feet along said Independent
Street to a nen underground manhole to 'a constructed
on the easterly nide a Hroad Street, thence pmceediD43
northerly epprsMmtely 25 feet along said ffiroed Street
to Weebingtm Street.
BkSCBI mx:
19e facilities vial consist of underground ductlires and mmholes, aims
seller cables, together vlth associated appurtevencea and asitebirp egnipmnt.
The minima depth to the top of the ductunes will be appmUmetely 16 inclen.
Rhe duetllres and marboleo till be constructed slthin the I1:. its of the public
say, bat outside the part tdnsh of custmarily been for travel of vebicles In-
sofar on passible. The initial operation of the feenItdes sill be at 2400
volts three phase; the vcltape will be Increased as occasion therefor regaias
for operation net in extend of 20 W. to greand.
i iSC868INS
A1lfWR1TP
Beaived and Recorded in Bated at Bangor Dire
Book 24 . nage 435 than 2_ day of Ay1gy5=J 1969.
On t 25 N9.
Attest:
0
Cls k Of
Advertrse Au 11, 1969