Loading...
HomeMy WebLinkAbout1969-05-26 171-W ORDER1]1-W Introduced by Councilor Houston, May 26, 1969 BA n g: CITY OF BANGOR TE (TITLE.) (Drkt2Ty._Accepting Report of City Engineer and DtrecMng Cons tnict ion -,-- Dunning nstruction_- Dunning Boulevard Sewer Extension By tAe City Coymait ofttw City ofBaayor: ORDERED, THAT the attached report of the City Engineer relative to the extension of the Dunning Boulevard sewer be and hereby is accepted, and be it further ORDERED, that said sewer extension be constructed imedidtely. U IN CTW COUNCIL May 26, 1969 PASSED cx c ORDER *Fo. Title, Aepo[t of City En�inB e[ - Wev3nas lvd% Sewer .............. Introduced and filed by Connermen CITY 02 BANGOR, MAINE Engineering Department May 22, 1969 To: The Municipal Officers Reference i6 made to Council Order 162-W, passed May 12, 1969, requesting the City Engineer to make the necessary surveys, plans, and cost estimates for the extension of the Dunning Boule- vard sewer. Plans have been completed which would provide for the in- stallation of 110 feet of 8 -inch Class 2400 asbestos cement pipe to extend the sewer in a southwesterly direction from its present terminus, and the relocation of an existing clean-out to the new terminus of the seTotal estimated cost of the installation s $800, of which 75%, or $600, would be assessed against the property benefiting. The only property benefiting by the in- stallation is that of Robert W. Bunt, and he has indicated his concurrence to the installation. It is recommended that the sewer extension be installed as soon as possible. Respectfully submitted, L4 I—) -.n Sohn T. Frawley 1 City Engineer JTP:L