HomeMy WebLinkAbout1969-05-26 171-W ORDER1]1-W
Introduced by Councilor Houston, May 26, 1969
BA
n g: CITY OF BANGOR
TE
(TITLE.) (Drkt2Ty._Accepting Report of City Engineer and DtrecMng Cons tnict ion -,--
Dunning
nstruction_-
Dunning Boulevard Sewer Extension
By tAe City Coymait ofttw City ofBaayor:
ORDERED,
THAT the attached report of the City Engineer relative
to the extension of the Dunning Boulevard sewer be and hereby
is accepted, and be it further
ORDERED, that said sewer extension be constructed imedidtely.
U IN CTW COUNCIL
May 26, 1969
PASSED
cx c
ORDER
*Fo.
Title,
Aepo[t of City En�inB e[ - Wev3nas
lvd% Sewer ..............
Introduced and filed by
Connermen
CITY 02 BANGOR, MAINE
Engineering Department
May 22, 1969
To: The Municipal Officers
Reference i6 made to Council Order 162-W, passed May 12,
1969, requesting the City Engineer to make the necessary surveys,
plans, and cost estimates for the extension of the Dunning Boule-
vard sewer.
Plans have been completed which would provide for the in-
stallation of 110 feet of 8 -inch Class 2400 asbestos cement pipe
to extend the sewer in a southwesterly direction from its present
terminus, and the relocation of an existing clean-out to the new
terminus of the seTotal estimated cost of the installation
s $800, of which 75%, or $600, would be assessed against the
property benefiting. The only property benefiting by the in-
stallation is that of Robert W. Bunt, and he has indicated his
concurrence to the installation.
It is recommended that the sewer extension be installed as
soon as possible.
Respectfully submitted,
L4 I—) -.n
Sohn T. Frawley 1
City Engineer
JTP:L