Loading...
HomeMy WebLinkAbout1969-05-05 141-W ORDER141-W Introduced by Councilor Houston, May 5, 1969 _ /p �� CITY OF BANGOR (TITLE.) (Orba, t+cceytmg_ Repoet of City _E g ee Extension o£ Samt2[y By the City council of M4 City Of Basset ORDERED, TORT the attached report of the City Engineer relative to the extension of the sewer on Ohio Street beyond Westland Street be and hereby is accepted, and, be it further ORDERED, that the sewer be installed as soon as possible. ----1VED 1669 .4A) -1 w, I: 43 ORDER C17y CI FRI{'3 OFFICE JS91L Title, IN CITY COUNCIL - of Ewer May 5, 1969 ,13eQOY[ of city Eng...-..IXL mmNay excesed from voting, PASSED Ohio St. 1Y CLINK Introduced and filed by TO: The Municipal Officers - 2 - April 30, 1969 To he No Name Frontage levied Deferred Yes No reply EAST SIDE William M. Mitchell(617) 75' $379.79 X James E. Kennay(623) 97 491.20 X Beverly McKay John E. McKay 59 non -assessable Beverly McKay John E. McKay(637) 90 455.75 X Paul L. Harper(643) 55 278.51 X Norman W. Buzzell(647) 53 268.39 X Helen Bola Mayo(693) 790 1012.78 $2987.69 X Bangor Hydro 50 non -assessable Lucy T. Dodge(731) 260 1316.61 X Verne H. Robinson(759) 303.8 1012.78 525.63 X George R. Peavey(791) 315 1012.78 582.35 X Ellen L. Severance(817) 325 1012.78 632.98 X Albert L. and Frederick N. Bean 500 2531.94 X It appears that the majority of the property Owners beyond #647 Ohio Street are not in favor of the proposed sewer install- ation at this time. All of the property owners between Westland Street and 0647 Ohio Street are in favor Of the proposed install- ation. It is, therefore, recommended that the sewer r be extended in a westerly direction for a distance of 200 feet from the existing pump station and easterly towards Westland Street for adistance of 120 feet from said pump station. The total esti- mated cost of said installation would be $4800.00, of which amount, $3361.41, would be assessed against the properties between #617 and 0647 Ohio Street, in accordance with the above list of a5sessment5. It is, therefore, recommended that the sewer be installed as noted above as soon as possible. A plan of the proposed Installation is attached. Respectfully submitted, John T. `Ferswley City Engine JTF:L Attachment CITY OF BANGOR, MAINE Engineering Department April 30, 1969 To: The Municipal Officers Reference is made to previous inquiries and requests for the extension of the sanitary sewer on Ohio Street in a westerly direction from Westland Street. The replacement of the existing sewer with anewnitary sewer between Sixteenth Street and Westland Streettogether with the installation of a pump station at the westerly end near Westland Street, was Completed last year. This installation will permit the future extension of sanitary sewer service for a dis- tance of approximately 3,000 feet west of Westland Street. The total estimated cost of the 3,000 foot extension is $40,000, of which, 75%, or $30,000, may be assessed against the property benefiting. All property owners within this area have been petitioned to determine the extent of desire for the extension of the sewer. The results of said survey are as follows: To be Deferred Yes No No Name Frontage levied _ reply WEST SIDE Frank T. Clark (626) 75' $379.79 X Arthur J. Richard(638) 126.8 642.10 X John O. Spearen (640) 92 465.88 x F. N. Bean (670) 346.5 1012.78 $741.86 X Leon B. Hatch(680) 210 1063.42 X Robert G. Miller(698) 195 987.46 X Nicholas L. Vinios Nicholas J. Philopoulos 61.2 non -assessable Maxwell Lyons 150 759.58 x Russell V. Peavey(754) 810 1012.78 3088.97 X Thurman Jenkins(796 220 1114.06 X Alden W. Bradbury(818) 200 1012.78 X Harold E. Noddin(834) 200 1012.78 X Barbara D. Lott(846) 62 313.96 X Paul F. Goas(850) 103 521.58 X John W. Eisentrager(858) 100 506.39 x