Loading...
HomeMy WebLinkAbout1969-12-08 35-X ORDER35-X Introduced by Councilor BrouncoS, Oec, B, 1969 ryrypp CITY OF BANGOR VH (TITLE ) rbtry . Accepting Report of city Engine Dunning. Blvd. Sewer Extension By Ow City Conva it oftAe My ofDaa .- ORDERED, THAT the attached report of the City Engineer relative to the extension of the Dunning Boulevard sewer be and hereby is accepted, and be it further 0SECESD, that said assessments be levied as noted therein. 35-% __...�-',VED 13G9 9G'! 34 fit 3: r.2 o R n E R CITY GL °.I S UrICE '� v ;F ,Titer Report of Engineer - Eunving e1W. ....................................... IN CITY COUNCIL Dec. E, 1969 Seger 14.... 'on exsseo c cLEaR Iniroduced a iced by Councilman CITY OF BANGOR, MAINE Engineering Department December 4, 1969 To: no Municipal Officers Pursuant to City Council order 171-W, passed May 26, 1969, directing the extension of the Dunning Boulevard sewer, the follow- ing report is submitted: The installation consisted of 110 feet of 8 inch Class 2400 asbestos -cement pipe, with a cleanout at the end. The total cost of the installation was $1,456.68, of which 75%, or $1,092.50, may be assessed against the property benefited. The recommended distribution of the assessment is as follows: Name and Reference Footage ASeeSSment South Side Robert Hunt vol. 2156, page 223 100' $546.25 North Side Carolyn C. Dunning non -assessable 50'(previously assessed) 273.12 Ford Street Right -of -Way non -assessable 50' 273.13 Total $ 1,092.50 It is recommended that the assessments be levied as noted above. Respectfully �eY �sub�mi�tted, 40 Jo7' y ,'�i City Engineer JTF:L