HomeMy WebLinkAbout1969-11-10 15-X ORDER15-X
Introduced by Councilor Minsky, Nov. 10, 1969
CITY OF BANGOR
(TITLE) (orDera Authorizing City Manager to, Enter Into Agreement Feasibility
on Reuse of Central Heating Plant, Bangor International Airport, as Refuse
By Ge CBv Causes of OW OBV of Bangor:
TEAT the City Manager be and hereby if authorized to
enter into the attached agreement with Metcalf 6 Eddy, Inc. for
a feasibility study on the reuse of the central heating plant
at Bangor International Airport as a refuse incinerator.
15-X
r.:-'VED
iH9 RU -9 ea 3.19
CITY Ct EFV $ OFFICE 0 A D E R
,i".'C Title,
IN CITY COUNCIL AYth. MM39¢[ 6TtBt A�[eement - Fei9<-
Nov. 10, 1969
PASSED
......................................
CITY R% Introduced and filed by
.. ...YnCrlmal
M
&
EDDY
E„"EN wIcI.<i 0Sx•.•c e5 xWils
ETCALF
T" 111-111-1111
October 29, 1969
Mr. John T. Frawley
City Engineer
City Hall
Bangor, Maine 04401
Dear Mr. Frawley:
In response to your recent request regarding a feasibility
study for a refuse burning boiler plant to augment the steam plant at
the Dow Airfield, we are pleased to submit herewith a proposal for
engineering services Including a study and investigation of the problem.
Engineering Services
1. Update refuse quantities from our 1964 Incinerator
report.
3. Consider adaptation of an existing boiler to refuse
burning.
3. Estimate the capacity, size, and available steam
production for a new refuse -fired boiler plant.
4. Estimate construction and operating costs for proposed
plant.
5. Prepare preliminary layout and suggested location of
the proposed facility.
Mr. John T. Frawley
October 29, 1969
6. Compare estimated operating costs with present operating
costa for existing boiler plant.
7. Submit the results of our study to the City in report form,
ten (10) copies of which will be famished.
Assistance by the Owner
It is understood that the City of Bangor will furnish us, with-
out cost, all available, existing and pertinent data relating to the existing
boiler plant including costa of operation and maintenance.
Period of Service
Following authorization to proceed, the services indicated in
this proposal will be started promptly and the work completed in about
three months from date of authorization.
Payments
We offer to perform the engineering services stipulated herein
for a lump sum fee of $6, 000, payable on the submission and acceptance
of the final report.
A signed copy of this proposal by an authorized official of the
City of Bangor will be accepted as authorization to proceed.
APPROVED FOR METCALF & EDDY, INC.
�io �n
/,—en rv'ce swent
APPROVED FOR CITY OF BANGOR