Loading...
HomeMy WebLinkAbout1970-12-14 48-Y ORDER48-Y Introduced by Councilor Erowtas, nee. 14, 1410 ryp CITY OF BANGOR (TITLE.) U@rbtt,.... Acc pting Report from City Engin r Extra. Pipe for Diamond. International Sewer BY the City Council of We City Ofbtaxyur ORDERED, THAT the report of the City. Engineer relative to the cost of the Diamond International sewer be accepted, and be it further ORDERED, that said Diamond International be billed for the extra pipe as noted in said report. �, Title, xn czee COUNCIL ..9ttta.Riaa .a#.Rlarvsnq .;sC@sgac ;o�ai •• 19. 1970 PASSED Sewer .................. ................... .. cx cxeax Introduced and filed by C� Councilman CITY OF BANGOR, MAINE Engineering Department December 9, 1970 To: The Municipal Officers Reference is made to Council Order 16-X, passed November 10, 1969, authorizing the City Hanauer to enter into an agreement with Diamond International Corporation relative to the extension of sewer service to their property adjacent to Interstate Highway I-95. As a part of the agreement, the city agreed to locate the sewer adjacent to and parallel with the westerly line of said Diamond property, so as not to interfere with their future development of the property. As a result of this location, however, an extra 350 feet of 8 inch pipe was required, and Diamond agreed to pay for the extra pipe, based upon a per foot cost to be determined from the actual completed cost of the total installation. The sewer has been completed, consisting of 2800 lineal feet of 8 inch asbestos cement pipe, at a total cost of $20,810. The completed cost per lineal foot is, therefore, $7.432. Applying the unit cost to the additional 350 feet would indicate that Dia- mond owes $2,601.20 for the extra length of pipe. It is recommended that Diamond be billed this amount in ac- cordance with the above-mentioned agreement. Respectfully submitted, 4��. 1 city T. Frawley City Engineer STF:L