Loading...
HomeMy WebLinkAbout1971-12-13 49-Z ORDER4A2 Introduced by Councilor Needham, 0e0. 13, 1911 CITY OF BANGOR (TITLE.) MrUr...... .........Acceptingytha Reportof.. the C.l.ty Engineer on the Extension of Hildreth Street North By tM My Comet Of MA City ofBangvm ORDERED, THAT the attached report of the City Engineer relative to the proposed extension or Hildreth Street North be and hereby is accepted, and be it further ORDERED, that construction begin immediately. -CCIVED 1911 BEC -8 IN 4:46 C k D D A CITY CLERK'S OFFICE Title, S!Ty rr ^.AF -^R MAINE RENK[ o£ City,ET<j; E[tknsion of Aldredth IN CITY COUNCIL Street North Dec 13, 1971 ...................................... PASS® plq.y. CI,Npg Introduced and filed by ( of this area 4 file with City II ineer) Councilman CITY OF BANGOR, M4INE Engineering Department December 8, 1971 To: The Municipal Officers Reference is made to City Council order 34-Z, passed November 22, 1971, directing the City Engineer to conduct the necessary surveys and prepare plans and cost estimates for the extension of Hildreth Street North for a distance of approximately 1000 feet, together with a list of possible assessments. The plans and cost estimates have been completed and thefollowing report is Sub- mitted: The proposed roadway extension would have anactual length of 1200 feet and would consist of a 24 -foot wide travel way with 8 -foot wide gravel shoulders. The installation would also include the replacement of approximately 90 feet of 13 -inch culvert with new 18 -inch ACCMP, and the encasement of approximately 80 feet of the 6 -inch Searspoit to Limestone fuel pipeline which passes under the roadway location. The total estimated cost of this work is $27,150, of which the City would pay 50s, or $13,575. It is proposed that the re- mit amount be assessed equally among the three adjacent properties which benefit, as follows: Property Owner Proposed Assessment Pine Tree Realty $4525.00 Chamber of Commerce 4525.00 Edward J. Hughes 4525.00 Total $13,575.00 Since the Hughes property and the Pine Tree Realty property e presently undeveloped, and since the development is not anti- cipated in the near r future, it is proposed that these assessments be deferred until such time as the property is developed, provided suitable recordable instrument is received. Since the develop- ment of the Chamber of Commerce property is expected to start with- in the near future, it is proposed that the asment on that property be levied as soon as the final costs are To: The Municipal Officers - 2 - December R, 1971 A plan showing the proposed roadway construction is at- tached. RWefsppecctttff``ulllllyy�'submitted, 4 JohnT. Frawley City Engineer STF:L Attachment