Introduced by Councilor Mooney, April 8, 1974
CITY OF BANGOR
w.
(TITLE.) Mrbff, Accepting city Engineers Report Final Costs of
Avenue and a Portion 0£ Saratoga Avence
By t&t City Cmb it of tiw City of Bang".
ORDERED,
TEAT the attached report of the city Engineer relative to the
final costs and recommended assessments for the construction of
Hempstead Avenue and a portion of Saratoga Avenue between Hempstead
Avenue and Mt. Hope Avenue be and hereby is accepted, and be it
further
OREERM. that said assessments be levied or de'erred as noted
therein.
IN CITY COUNCIL
April N, 1974
Referred to Public works Committee
for the purpose of public hearing,
tabled.
]ks
CITY CLE
IN CITY COUNCIL
April 22, 1979
Public hearing Feld, closed,
passed.
130 AN
O R D E R .eY
Title,
Acc, citX &n9 6?V: -
Final Costs of
Neupsteal Ave.6 Portion of 5 ratoga Ave.
Introduced and filed by
Cilman
t
RECEIVED
wk APR -4 41 4:38
CITY CLERK'S OFFICE
CPY of RAN50R. MAINE
CITY OF HANNON, MAINE
Engineering Department
TO THE MUNICIPAL OFFICERS: April 4, 1974
Reference ismade to City Council Order No. 119-E passed March 27,
1972, which authorized the construction of Hempstead Avenue and a
portion of Saratoga Avenue. The construction of said streets has
been completed, and included the following work:
Saratoga Avenue has been constructed for a distance of 406 feet north
from Mt. Hope Avenue to the beginning of Hempstead Avenue, and Hempstead
Avenue has been constructed in a northeasterly direction for a distance
of 1,370 feet to Mt. Hope Avenue. Each street has a 30 foot wide
travel way, consisting of a surface treatment on a 6 inch gravel base
and a 15 inch gravel subbase. A 6 foot sidewalk has been provided on
the east side of Saratoga Avenue and the south side of Hempstead
Avenue.
An existing storm sewer which was constructed approximately 15 years
ago has been rehabilitated, including the repair of broken pipe, the
cleaning of the lines, and the reconstruction of certain catch basins
and manholes. Also, three new catch basins were added to the storm
sewer system. In addition, the manholes on
an existing sanitary sewer
line were adjusted to the new roadway grade.
The total actual cost of the roadway construction is as follows:
TOTAL COST 'CITY SHARE PRIVATE SHARE
Streets, Sidewalks and
Esplanades
$33,733.80
$12,390.00
$21,343.80
storm Sewer System
Modifications
12,429.00
7,767.00
4,662.00
Sanitary Sewer Adjustments
1,200.00
1,200.00
-0-
TOTAL:
$47,362.80
$21,357.00
$26,005.80
The City's share of the street construction was computed at $6.75 per
foot of roadway, as allowed by Chapter XII, Article 12, Section 1.6.1
of the Laws and Ordinances 0£ the City of Bangor.
The storm sewer modifications were partially necessary due to a
revised alignment of the roadway, which is different from that
originally proposed in 1958, and some of the modifications were
necessary to upgrade the system. it is felt that on this basis
that the assessment should be applied to only 50% of the storm
sewer work, or $6,215. Since it was agreed in the original Council
Order that the storm sewer would be 75% assessable, then the total
assessment would be $4,662.
The work an the existing sanitary sewer consisted of adjusting 8
manholes to the new road grade. The manholes were originally set
to the grade recommended in 1958, but required adjustment to the
w roadway grade. Consequently, it is felt that the manhole adjust-
ment should be a City coat, and should not be assessed.
It is proposed that the assessments be applied to the lots in the
Nbodlawn Development which benefit, as follows:
LOT NO.
87
88
89
103
90
91
92
93
94
95
96
97
98 s portion of 99
Bangor Realty Trust
(Bangor Convalescent Center)
MST AND SOUTH SIDE:
86
85
84 (owned by Maurice J. Fineson)
83
82
81
80
79
78
77
Bangor Realty Trust
(formerly hot No. 76)
FRONTAGE ASSESSMENT
98.13
ft.
886.02
98.81
ft.
892.16
112.13
ft.
1,012.43
120.00
ft.
1,083.49
130.00
ft.
1,173.78
110.10
£t.
994.10
125.88
ft.
1,136.58
115.00
ft.
1,038.34
110.00
ft.
993.20
110.00
£t.
993.20
110.00
ft.
993.20
100.71
ft.
909.32
180.40
ft.
1,628.84
60.00 ft. _541.94
104.43
ft.
942.91
130.00
ft.
1,173.78
108.34
ft.
978.21
98.41
ft.
888.55
115.84
ft.
1,045.93
120.00
ft.
1,083.49
120.00
£t.
1,083.49
120.00
ft.
1,083.49
120.00
ft.
1,083.49
127.75
ft.
1,153.46
134.30
ft.
1,212.60
2,880.23
£t.
$26,005.80
with the exception of Lot No. 84, which is owned by Maurice J.
Fineson, and the property owned by the Bangor Realty Trust, the
assessments on all of the other lots listed are to be paid by
Ernest A. Caliendo, the original petitioner for the construction
of the streets. In accordance with the provisions of Council
Order 119-Z, the assessments against each lot are to be levied
when the lots are sold, but the assessment against all lots must
be paid no later than 3 years after the completion of the work.
It is recommended that the date of the passage of the Council order
accepting this report be considered as the date of completion of
the work. Mr. Caliendo has expressed a desire to pay off the out-
standing assessments at the rate of $1,200 as each lot is sold,
until the total outstanding assessment is paid.
With regard to lot No. 84, which isowned by Maurice J. Fineson, it
is recommended that the assessment be deferred until such time a
the lot is sold, or is developed so as to require s to Hempstead
Avenue. It is further recommended that the assessments against the
property owned by Bangor Realty Trust located on the northeast side
Of Hempstead Avenue, which is occupied by the Bangor Convalescent
Center, be deferred until such time as driveway or walkway access
to Hempstead Avenue is required, and it is £urhher recommended that
the assessment against Lot No. 76 located on the south side of
HempsteadAvenue be deferred until such time as the lot is sold or
is developed so as to require driveway or walkway access to
Hempstead Avenue.
A plan showing the lots and frontages to be assessed is attached,
and the plans showing the construction of the roadway are on file
in the office of the City Engineer.
Respectfully submitted,
V oh Frowly
City Engineer