No preview available
HomeMy WebLinkAbout1974-03-25 111 AB ORDER111 M Introduced by Councilor Mooney, ll arch 35, 1574 r✓ d�`pp CITY OF BANGOR (TITLE.)VHC}CCp Il --ting, C1 tX engineer to Make Cast Study, Hogan Road BY the CHy Cou til ofth%City of Baniaw: ORDERED, THAT the attached petition from the Pyramid Company requesting that a study be made to determine the cost of extending sewer service to property located east of Hogan Road and south ofthe Interstate Highway interchange be and hereby is accepted, and be it further OROEHm' THAT the City Engineer be directed to conduct the necessary surveys and prepare plans and cost eatimates, together with a list of possible assessments covering the extension of said sewer and report his findings to the City Council for further actione 111 AB IN CITY COUNCIL March 25, 1974 RECEIVED PASM. 0 R D E R s^ g1� MAR21 iPIT12 c TY CL Title ' CITY CLERKS OFFICE CITY OF 9ANSOR. MAINE pir„city, eng�, [UMakecest scudy� xcgac RdStorer. Ext. ........... I ................ Introduced and filed by �.ou��lmen 925 DAVIS ROAD NORTH SYRACUSE, NEW YORK Et0„ass asa-IazD PYRAMIDTREavRAM10COMPNIES March 14, 1974 Municipal Officers c/o City Engineer City of Bangor 73 Harlow Street Bangor, Maine 04401 Re: Hogan Road Shopping Center Utilities Gentlemen: Based upon the fact that the Bangor City Council has approved our Hogan Road project. we respectfully request that the necessary studies, design and cost estimates be generated for providing the project with both water and sanitary sewers. We would hope that this could be accomplished as soon as possible so that both the City and Pyramid would be afforded the maximum flexibility in coordinating and scheduling the installation of these systems. If our engineers, the James W. Sewall Company of Old Town, or Pyramid, may be of any assistance in this matter, please do not hesitate to contact Mr. William Ryan of the Sewall Company or myself at any time. We thank you for your time and consideration in the past, and look forward to your usual fine cooperation in the future. S ncerely o�NX Ames W. McDonald Jr. Project Manager The Pyramid Companies M71vui