No preview available
HomeMy WebLinkAbout1974-08-26 266 AB ORDER266 AM Introduced by Councilor Mooney, August 26, 1974 CITY OF BANGOR (TITLE) Mrl}Ero Accepting City. Engineers Report - Root. street Construction By Cite CoanvU of City of Bangor: ORDERED, THAT the attached report of the City Engineer relative to the estimated cost and possible assessments for the construction of the Root Street roadway and sanitary sewer between 14th Street and 15th Street be and hereby is accepted, and be it. further ORDERED that said construction start as soon as possible and be it further ORDERED that the sum of $12,300 be transferred from the Reserve for Future Construction, General, Account 92 2235, for the road con- struction; and $5,100 be transferred from the Reserve for Future Construction, Sewer, Account 92 2236, to cover the cost of the sewer construction. IN CITY COUNCIL August 26, 1974 PASSED. cxxr cxe L 266 en I ORDER Title, ,GA A ig4 .CktY Pihsi94E5'A Reaux< -. p Tct ;t;qNt ..,,,,,,,, n troduceL and filed by Cowei RECEIVED 1971 AUS 22 PR': 24 CI1Y CLERKS offICE :pv of BANGOR. MAINE TO THE MUNICIPAL OFFICERS: Pursuant to City Council Order 157-Ae passed May 13, 1904, directing the City Engineer to make a cost study for the construction of Root Street, the following report is submitted: The street would be constructed within the dedicated right-of-way which exists between 14th Street and 15th Street, a distance of 500 feet. The street would have a 30 foot wide travel way, consisting of a 3" tar sur- face on an 18" gravel base, A 6' wide sidewalk would be constructed on the north side, and the remaining areas of the tight -of -way would be loomed and seeded. Asphalt curbing would be provided at the corners of 14th Street and 15th Street. The total estimated coat of the road construction is $12,300. In accord- ance the City Ordinance, the City would contribute $6.25 per foot of street, or $3,125, the remaining $9,175 would be assessed proportionately against the property benefited, as follows: ESTIMATED IN OPPOSED NAME FRONTAGE ROAD ASSESSMENT FAVOR Cecil H. & Lillian G. Herring 50' $ 679.63 x Paul L. Shaw 50' 679.63 x John F. McGee Heirs 50' 679.63 x Leslie & Jeannie A. Sewall 50' 679.63 x Fowls eros., Co. Lot c-83' 1,128.19 x Lot D-83' 1,128.19 Lot E-84' 1,141.78 Lot G-75' 1,019.44 Lot H-75' 1,019.44 Lot I-75' 1,019.44 TOTAL: $9,175.00 -In conjuction with the roadway construction, 375 feet of 8" asbestos cement sanitary sewer line would be installed, extending west from the existing sewer on 14th Street. The total estimated cost of the sewer construction is $5,060, of which the City would pay 50L', or $2,530, and the remaining amount would he assessed proportionately, as follows: ESTIMATED IN NAME FRONTAGE SEWER ASSESSMENT FAVOR OPPOSED Cecil H. & Lillian G. Herring 50' 202.40 X Paul L. Shaw 50' 202.40 X John F. McGee Heirs 50' 202.40 X Leslie & Jeannie A. Sewall 50' None X Fowls Bros. Co. Lot C-83' 335.98 X Lot 0-83' 335.98 Lot E-84' 340.04 Lot G-75' 303.60 Lot H-75' 303.60 Lot I-75' 303.60 TOTAL: 2,530.00 It should be noted that none of the land owned by those opposed is presently developed;�accordingly, it is recommended that the assessments against those properties be deferred until such time as the properties are developed, with the understanding that the deferred sewer assessments would be increased to 75%. It is recommended that the street and sanitary sewer be constructed as out- lined above and as shown on the attached plan. Respectfully submitted, J'Ta�°`1 City Engineer