Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAbout1974-08-26 264 AB ORDER264 Ab
Introduced by Councilor Mooney, August 26, 1974
CITY OF BANGOR
(TITLE.) QYibCr, -Application for utility Location Fermis Bangor ..uldich _..
By 4w City Cow;eil Of the City o(Bergor.
ORDERED,
THAT the attached application for utility location permit is hereby
granted upon condition that the poles be numbered.
Note: Following are the public streets and highways referred to:
Beginning at a utility pole numbered 90 now located on the southeasterly
side Of Crosby Street; thence proceeding southwesterly, four (4) poles to be
located on the southeasterly side over a distance of approximately 289 feet.
in CITY COUNCIL
August 26, 1974
CITY c
264 AB
in All".22 YX Y
,�1v ci EPKS URCE
iry er q_g;pR, MAINE
Upon theapplicationof BANGOR HYDRO -ELECTRIC COMPANY dated 1
requesting permission to locate certain of its facilities hereimfter19KTSY�alo
over and across certain public ways in County of
State of Maine, forth in its application, n
nev"Yhlicatiom bsvi�_been made by applicant in connection with said application.
Permission. is hereby given to said Bangor Hydro -Electric Companyto locate, .c nstroct and
maintain certain of its facilities hereinafter described upon,along, over and across
certain publicdayssituate in said municipality as hereinafter set forth. This permit is
granted subject to the provisions that any person, firm or corporation owning property
within the subject rweicipalitp wbicb abuts the applicable waymayfile objections with the
, Haim, within. ninety (90)
d aIle cilities described in said application, said written
objection to state the cause of objection and to be served none said Bangor Hydro -Electric
Companyin hand or by registered or certified mail.
LOCATION:
Beginning at a utility pole numbered 90 now
located on the southeasterly side of Crosby
Street{ thence preceeding southwesterly,
fear (4) poles to be located an the south-
easterly side over a distance of apprcr-
imately 289 feet.
DESCRIPTION:
The facilities shall consist of a line composed of weed poles and supports therefor,
osearmsy wrm
s and/or cables, together with associated appurtenances.: The minimum clearance
of the wires and/or cables, other than guy wires, shall be at least eighteen (18)feet over
the public way. The poles shall be set within the -limits of the public way, but outside the
part thereof customarily used for travel by vehicles. The initial operation of the facilities
will be at volts phase. The voltage may be increased as occasion
therefor regq slb opoperationn�T—escess of 20 n to ground.
)
Remived and Recorded in
Boon Page ,
Attest: August 26,
� C➢s_- .
Clark
angor
)
LICENSING
AUTHORITY
)
Dated at Maine,
This,
— 19�.
—2'6ttT u�♦
FORM 2
APPLICATION FOR UTILITY LOCATION ?ESMIT
To; VUNICIPAL OFFICER - CITY OF BAWWR
BANGOR HYDAO..ELEGTRIG C0WMY, a Maine corporation being duly authorizedpp t to
the State of Maine to generate, sell, distribute and supply electricity in. Clyy of
Bawer , County of Penobscot , State aforesaid, hereby applies for
a pert to authorize it to locate, construct and maintain pertain of its facilities
hereine4ter described upon, along, over and across certain public ways situate inthe
m
mlaipslity hereinbefore referred to
(no public notice of this application to be made )
in accordance with the terms and conditions of Title 35; Section 2432, MRSA as amended.
LOCATION:
Beginning at a utility pole mimbexed 90 now,
located on the southeasterly side of Crosby
Street; theme proceeding southwesterly,
soar (4) poles to be located on the south-
easterly side over a distance o4 approm-
s®tely 289 feet.
DESCRIPTION:
The facilities will consist of a line composed of woad poles and supports therefor,
, wires ami/or cables together with associated appurtenances.' The minimum
clearannce a
ofthe. wires end/or cables, other then guy wires, will be at least eighteen
feet over the public way, The poles will be set within the limits of the public way, but
outside the part thereof customarily used for travel by vehicles.The initial operation
of the facilities will be at 4200/11440 volts, three phase; the voltage will
be increased as occasion therefor requires for operation not in excess of 20 AV to ground.
Dated at Besse or , Maine, this BANGOR HYDRO-ELECTRRIIC WgPANY /J
21st. day 'o4 Avguet 1974 By ��Wso la i./1/��•r.�
T tie: se o F imer