No preview available
HomeMy WebLinkAbout1974-09-23 284 AB ORDER284 At Introduced by Councilor Mooney, September 23, 1974 CITY OF BANGOR (TITLE,) (DrUr, Accepting Proposal from Metcalf and Eddy, Inc. Preliminary Dea,,gn of Pedestrian Walkway..... By Oz City Cow,c! ofVw City ofBanaw: ORDERED, THAT WMEREA5 the Kenduskeag Stream Urban Renewal Plan provides for the construction of an overhead pedestrian walkway across Kenduskeag Plaza from Exchange Street to the Broad Street area, and whereas building construction on the sites adjacent to the proposed walkway location has advanced to a point where construction Of the walkway should proceed, now therefore be it ORDERED that the attached proposal from Metcalf and Eddy, Inc. be and hereby is accepted, and be it further OMDERED that the sum of $10,000 be transferred from the Reserve -Future Construction Fund, General, Account Number 92-2235 to cover the cost of preliminary survey and design. 264 H d IN CITY COUNCIL Septendber 23, 1974 RGGEIVED a. oanxx �3 {„1 SEP 17 pM il'24 ITY Cca Title, ;ITY CLERK'S OFFICE 3Pv uF Rt4GOfl... AINE . uceppipy. e�oposal £r, metcal£ e..raay prelim, Oesi§n o£ Pedest[iav Walwff. Introduced and filed Ey �� �'quncilaan Metcalf is Eddy, Inc. ) Engineers 8 planners lead"B'ddlo9Bonom MMramans02116(61)I45356W TWXI1032/6165 Camp ME TEDD BOirON September 9, 1974 Mr. John T. Frawley City Engineer City tlall Bangor, Maine o44o1 Dear Mr. Frawley In accordance with your request as confirmed by your letter of August: 20, 1974, we are pleased to submit our pro- posal for engineering services in connection with the design of an overhead pedestrian walkway extending from Exchange Street to broad Street{ spanning the Kenduskeag Plaza and Kenduskeag. Stream. SCOPE OF SERVICES We propose to provide the following services: 1. Review the dead load and live load computations prepared by the City. 2. Verify that the existing Kenduskeag Plaza walls will support the column loads. i. Prepare a preliminary structural design and furnish sketches for use during final design by the City of Bangor. A. Prepare an estimate of construction cost. �. Prepare a letter presenting the preliminary detlgn and cost estimate. C. Provide advice during final design and construction . RESPONSIBILITIES OF TILE CITY OF BANGOR It would be the responsibility of the City of Bangor to a,. c,mp118h the following at no Cool, to or,: .. Provide all available Information pertaining to this Prnject. New loh 1all,Alto (Went NowH"m Mr. Sohn T. Mrawley September 9, 1974 We. appreciate the opportunity to submit this proposal, and we look forward to continuing our service to the City of Bangor. If you have any questions with respect to this pro- posal, do not hesitate to contact us. Very truly yours, METCALF & ZD� INC. John Seniorr Vice Vice President CVD:mi7