Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAbout1974-09-23 284 AB ORDER284 At
Introduced by Councilor Mooney, September 23, 1974
CITY OF BANGOR
(TITLE,) (DrUr, Accepting Proposal from Metcalf and Eddy, Inc.
Preliminary Dea,,gn of Pedestrian Walkway.....
By Oz City Cow,c! ofVw City ofBanaw:
ORDERED,
THAT WMEREA5 the Kenduskeag Stream Urban Renewal Plan provides
for the construction of an overhead pedestrian walkway across
Kenduskeag Plaza from Exchange Street to the Broad Street area,
and whereas building construction on the sites adjacent to the
proposed walkway location has advanced to a point where construction Of
the walkway should proceed, now therefore be it
ORDERED that the attached proposal from Metcalf and Eddy, Inc. be
and hereby is accepted, and be it further
OMDERED that the sum of $10,000 be transferred from the Reserve -Future
Construction Fund, General, Account Number 92-2235 to cover the cost
of preliminary survey and design.
264 H
d IN CITY COUNCIL
Septendber 23, 1974 RGGEIVED
a.
oanxx �3 {„1 SEP 17 pM il'24
ITY Cca Title, ;ITY CLERK'S OFFICE
3Pv uF Rt4GOfl... AINE
. uceppipy. e�oposal £r, metcal£ e..raay
prelim, Oesi§n o£ Pedest[iav Walwff.
Introduced and filed Ey
�� �'quncilaan
Metcalf is Eddy, Inc. ) Engineers 8 planners
lead"B'ddlo9Bonom MMramans02116(61)I45356W TWXI1032/6165 Camp ME TEDD BOirON
September 9, 1974
Mr. John T. Frawley
City Engineer
City tlall
Bangor, Maine o44o1
Dear Mr. Frawley
In accordance with your request as confirmed by your
letter of August: 20, 1974, we are pleased to submit our pro-
posal for engineering services in connection with the design
of an overhead pedestrian walkway extending from Exchange
Street to broad Street{ spanning the Kenduskeag Plaza and
Kenduskeag. Stream.
SCOPE OF SERVICES
We propose to provide the following services:
1. Review the dead load and live load computations
prepared by the City.
2. Verify that the existing Kenduskeag Plaza walls
will support the column loads.
i. Prepare a preliminary structural design and
furnish sketches for use during final design by
the City of Bangor.
A. Prepare an estimate of construction cost.
�. Prepare a letter presenting the preliminary
detlgn and cost estimate.
C. Provide advice during final design and construction .
RESPONSIBILITIES OF TILE CITY OF BANGOR
It would be the responsibility of the City of Bangor to
a,. c,mp118h the following at no Cool, to or,:
.. Provide all available Information pertaining to
this Prnject.
New loh 1all,Alto (Went NowH"m
Mr. Sohn T. Mrawley
September 9, 1974
We. appreciate the opportunity to submit this proposal,
and we look forward to continuing our service to the City of
Bangor. If you have any questions with respect to this pro-
posal, do not hesitate to contact us.
Very truly yours,
METCALF & ZD� INC.
John
Seniorr Vice Vice President
CVD:mi7