Introduced by Co,nctor :looney, December 9, 1974
.CITY OF BANGOR
(TITLE.) VHYDQC `Ac cepg t C'ty_. Engineer's Report Final Cost O£
_. r_ ........... _. _.. ..... _.
Emerson Street Improvements
1.
By tie My Caused of the City of Bazaar.
EORDERED,
THAT the attached report of the City Engineer relative to
the final coat of the improvements on Emerson Street at Main
Street be and hereby is accepted and be it further
opDERED, that the assessments be levied as noted therein.-
= 41 AC
n.g IN CITY COUNCIL
Dec"her 9, 1994
Clerk instructed to advertise - O R D E R 6^i
putilic hearing Dec. 23, 1994,
consider next meeting. Title,
CITY .Am. 93ty. EP&1q Ree?... F}pal,Cpat,oS
IN CITY COONCIL .ge.aMon. St... I"npy Oe IRs
December 23, 1974
Hearing held, closed. Passed.
Introducedd ed by
CITY CLSWC .... .... en.....filed.. ....
(v\wcflmen
RcCEI V ED
II OEC -5 PM 4:28
CITY CLERKS OFFICE
'JT! OF NAN6DR. MAINE
CITY OF BANGOR, MAINE
Engineering Department
December 5, 1974
TO THE MUNICIPAL OFFICERS:
Reference is made to City Council Order No. 213 -AB passed
June 24, 1974 which authorised the construction of certain
improvements on Emerson Street adjacent to Main Street, together
with certain improvements on Main Street. The work has been
completed, including the following:
Granite curbing was installed an Main Street in front of the
Sherafon Inn to replace the existing deteriorated concrete curb.
The existing sidewalk on MainStreet Was replaced with a new
concrete sidewalk, including a new concrete entrance ramp from
Main street. in addition a grass esplanade was installed adjacent
to the Main Street sidewalk. Approximately 150 feet of Emerson
Street was completely reconstructed extending east from Main Street,
so as to raise the grade to a more suitable level. In addition,
a bituminous concrete overlay was provided for a total length
of 350 feet on Emerson Street from Main Street. Asphalt sidewalks
and curbs were installed On the northerly side of Emerson Street,
together with grass esplanades. Existing manholes and catch
basins were adjusted to the new roadway grade.
The total cost of the improvements was $10,860, which was
nsub-
stantially i cess of the original estimate of $8,400. The
overruns are explained as follows:
1. The width of bituminous concrete overlay on Emerson Street was
extended an additional 8 feet on the southerly side, represent-
ing a total of 320 square yards of additional pavement at a
total estimated cost of $800.
2. At the petitioner's request, the entrance from Main Street to
the Shergffan Inn was changed from bituminous concrete
rete to
Portland Cement concrete, representing 64 square yards at an
additional coat of $15.00 per square yard, or a total of $1,000.
3. An additional 10 square yards of concrete sidewalk was pro-
vided at the intersection of Emerson Street and Main Street,
at a cost of $150. A request by Mr. Walsh to delete a
portion of the asphalt sidewalk on the north side of Emerson
Street resulted inconsiderable regrading to control the
flow of water, at an estimated additional cost of $500.
In accordance with the Laws and Ordinances of the City of Bangor,
one-third of the cost of such improvements may be assessed against
the property benefited, in this case amounting to $3,620 against
Mr. Thomas Walsh. It is recommended that the assessment be levied.
A plan showing the improvements which were made is on file in the
office of the City Engineer.
1Respectfully submitted,
Sohn T�Feawley
City Engineer