Loading...
HomeMy WebLinkAbout1975-06-09 235 AC ORDER235 AC Introduced by Councilor moc,ey, Tune 9, 1975 _ CITY OF BANGOR (TInE.) (OrlMrt..._...... .. Accepting proposal Flgm,,,Eaton W. TULe11..r._. Architectural Design of Pede9trian Walkway . _........ .. .............. ___..._ ........... .......... .......... By W City Conseil ofAw City of Bangor: ORDERED. THAT, the City Manager be and hereby isauthorized to accept the attached proposal from Eaton W. Tarbell and Associates, Inc. for architectural services in relation to the design of the. Pedestrian Walkway to be constructed over Kenduskeag Plaza as pact of the Kenduskeag Stream Urban Aenewal_.Pxoject. FINDINGS OF FACT: Metcalf & Eddy, Inc. of Boston have been previously authorized to do the structural design of the Walkway, since they are familiar with the structural aspects of Kenduskeag Plaza, which they designed approximately 15 years ago. Since Eaton W. Tarbell and Associates have had an active part in the downtown redevelopment, it is felt that they can provide the best architectural treatment so that the Walkway will be compatible with adjacent buildings. 235 RECEIVED r IH CITY CDI II - 0 R D E R 2 PSR JON -5 PN 4' 40 3 ne S, 1D75 passed. Tine, - CITY CLERK'S URGE CITY OF NNGDR. MAINE CITY CLERK - AcQtinx PioROa 1 Mwn Bat ;Tgrb011 - A cMtectural Design of Pedestrian Walkway. Introducceedd and filed by May 7, 1875 Re: Pedestrian Walkway, Bangor, Maine 0 Mr. John T. Frawley _a City Engineer City of Bangor a Bangor, Maine 99401 0 Dear John Frawley . . In response th your letter of April 28, 0 1975, we ape submitting this proposal for undertaking certain design services with regard to the Pedestrian Walkway. These services 'owould be in the nature of providing aesthetic design parameters to Me city. The Structural Engineering will be done by the city 0 through another consultant. s The design responsibility of Eaton W. Tarbell & Associates, Inc. would include but not be limited to the followtng. 0 messing studies areas section design locatton of structural members connections with existing structures proposed methods of connections to future development o presentation drawings o working drawings after receipt of structural drawings and approvals o Eaton W. Tarbell & Associates, Inc. wtll do this work for an hourly fee based on the following schedule. EATON W. TARBELL & ASSOCIATES, INC. • ARCHITECTS • BANGOR, MAINE 04401 Mr. John T. Frawley a May 7, 1975 Page two 0 Principal $40.00/hr. Architect/Engineer $20.00/hr. Designer $15.00/hr. Draffsman $12.00/hr. m These miss are bused on our actual salaries times our historically derived multiplier. We will not exceed $5,000. without written permission from the City Engineer. o Cord try, o f r✓ o W, arbell, A.LA., President s Eat W. Tarbell & Associates, Inc. M EWT/amc 3 EATON W. TARBELL & ASSOCIATES, INC. • ARCHITECTS • BANGOR, MAINE 04401