Loading...
HomeMy WebLinkAbout1975-05-28 198 AC ORDER198 % Introduced by Councilor Mooney, May 38, 1975 CITY OF BANGOR (TITLE.) (jDrbgr, Accepting City Engineer's Rep t Estimated Cost of ,Piopo d Bro kaid Drive Roadway C nstruction BY ale City CouwB OfB a City OfBaRpnr ORDMMD, MT the attached report of the City Engineer relative to the estimated costs of construction of Brookside Drive, extend- ing from Grandview Avenue to Essex Streetf GO the proposed. Brookside Garden Apartment development be and hereby is accepted. And be it further ORDERED that the construction of said street commence as soon as possible and be it further ORDERED that the sum of $65,000 be transferred from the General Reserve for Construction Account to. cover the cost of Said construction.- % IN CITY COUNCIL ✓ May 28, 1975 198 AC Passed. ORDER i -�cIxv CneaK - 56 Tlue; . APPPPPIm CjLY. F.P9}PBW a. R PP3S. -... . PSkjFNF%1 G96F. P% FF.oposed� Brookside Drive Roadway Const[uction. -' Introduced and filed by .. .. .. co n RECEIVED 97S MAY 14 PM 3:55 CITY CLERK'S OFFICE WY OF P34d, MAINE CITY OF SAMOS, MAINE Engineering Department May 14, 1975 TO THE MUNICIPAL OFFICERS: Reference is made to City Council Order M. 163 Ac passed April 28, 1975 directing the City Engineer to make a cost study for the con- struction on-struction of the proposed roadway to serve the Brookside Borden Apartments Subdivision located at the corner of Grandview Avenue and Essex Street. The plans have been reviewed and cost estimates prepared, as follows: The proposed roadway has a total length of approximately 1970 feet, and would consist o£'a 36 foot wide travel way having a bituminous concrete surface with asphalt curbing. and a sidewalk on our side,; four catch basins and discharge culvert would be required. All other areas within the right-of-way would be loamed and seeded. The total estimated cost of construction is $65,000. In accordance with Chapter 12, Article XII, Section 1.6 of the City Ordinances, the City's share of this type of roadway would be $14.00 per foot, making a total City share of $27,580. The developer's assessment. would, therefore be $37,420. - '.It is recommended that the City participate in the construction of the proposed roadway, to be accepted asa public way, provided that the developer enters into a agreement with the Bangor Water District for the installation of the water mains, hydrants, and service connections to coincide with the roadway construction, and that the developer installs his sanitary sewer laterals within the right-of-way. The developer has indicated that he isn favor of the proposed construction based upon the estimated cost. A plan showing the proposed roadway construction is attached Respectfully submitted, John T. Frawley 1 City Engineer i jw:rlb Attachment