HomeMy WebLinkAbout1976-10-25 401 AD ORDER401 AO Introduced by Councilor Soucy, October 25, 1976 CITY OF BANGOR (mLE.) VVTIiQra ...._Accepting City Engineer's, Report Final Cost of By Ge City Coa of Me City olBampor: ORDERED, THAT the attached Report of the City Engineer relative to the actual coat and recommended assessments for the installation of a sanitary sewer on Valley Avenue east of Kenduskeag Avenue be and hereby is. accepted, and be it further ORDEREH� that the assessments be levied as noted therein. IN CITY, COUNCIL 401 AD _ estates 25, 1976 - :Cgnsidei next Meeting - 1 O R D E R R,� - SCITY CuFWTV Title, RECEIVED IN Clxr COUNCIL. -CITY OF BANGOR November 8, 1976 , AcceQt... City Bnyineer.. Re4oxt- "' CITY CLERIC'S MICE Amended by tubeto adder az p. Clerk regtea to advertise - Final cost of Valley Avenue sewer >lfi OCi 18 Ah II 13 ...................................... Aeolis hearing. Consider next meeting. Introduced and j IN CITYCCD,C19 f/ ••• ••••••••••• xmemea za 19'I6 count n Hearing Feld,eing closed - - bythe following yes and n vote. Councilors voting yes: Brountae. Finnigan, Gats, Henderson, ` - McKernan, GWlss, Soucy, Willey and Zendz1an. Passed. A CITY C PK CITY OF BANGOR, MAINE v/ Engineering Department October 14,1976 To the Municipal Officers:' Reference is made to City Council Order No. 366 AC passed September 22, 1975, authorizing the installation of a sanitary, sewer on Valley Avenue east of Eenduskeag Avenue. The installa- tion has been completed, consisting of 1,000 feet of 8 inch asbestos cement pipe and three manholes, extending in a northerly direction along Valley Avenue from the so-called Season College Collector Sewer terminating at the intersection of Valley Avenue and Eenduskeag dvenue. The actual cost of the sewer installation was $22,620.08, of which 50%, or $11,310.04 mayybe assessed against the properties benefited, as follows: Property Owner Frontage Estimated Assessment �- Donald S. and 2ether L. Bradman. 553 Valley Avenue 100 feet $ 536.90 Robert E. and Velma L. Reynolds 220 feet 11181.18 Sadie L. Trask 529 Valley Avenue 99 feet 531.53 Bessie L. Raymond 523 Valley Avenue 192 feet 19030.85 George F. and Darlene H. Bryant 493 Valley Avenue 313 feet non -assessable Hugo and Peter Frati 516 feet non -assessable City of Bangor 33 Peet 'nen-assessable Bangor Hydro -Electric Co. 30 feet non -assessable Sidney and Lynette Weiman 504 Valley Avenue 245 feet non -assessable Maynard A. Call 479 Valley Avenue 271 feet non -assessable 2,019 feet $3,422.71 Page Two It will be noted that a large amount of the property frontage is mon-assessable, since it lies adjacent to. the Renduskeag Stream Interceptor Sewer and is below the level of Valley Avenue. As recommended in the original Council Order, the assessment should be pro -rated against the entire frontage so as to be approximately equal to the average City assessment for lateral sewer extensions. It should be further noted that the actual cost of the sewer installation was alightly higher than the original estimate of 821,680.00. This was primarily due to the neceasary removal of an additional 39 cubic yards of trench ledge which was encountered during the excavation. It is recommended that the assessments be levied as noted above. Respectfully submitted, �T- John T. Frawley, 1 City Engineer Substituted Copy 901 AD November 8, 1976 CITY OF BANGOR, MAINE Engineering Department October 147 1976 To the Municipal Officers Reference is made to City Conseil order No. 366 AC passed September 22, 1975, authorizing the installation of a sanitary sewer on Valley Avenue east of Kenduskeag Avenue. The installa- tion has been completed, consisting of 1,000 feet of 8 inch asbestos cement pipe and three manholes, extending in a northerly direction along Valley Avenue from the so-called Musson College Collector Sower, terminating at the intersection of Valley Avenue and Keaduakeag Avenue. The actual cost of the sewer installation was $22,620.08, of which 50%, or $11,310.04 may be assessed against the properties benefited, as follows: Property Owner Frontage Estimated Assessment Donald J. and Esther L. Bradman 553 Valley Avenue 100 feet 6 560.18 Robert E. and Velma L. Reynolds 220 feet 1,232.40 Sadie L. Track 529 Valley Avenue 99 fact 554.58 Bessie L. Raymond 523 Valley Avenue 192 feet 1,075.55 George F. and Earlene H. Bryant 493 Valley Avenue 313 feet non -assessable Hugo and Peter Frati 516 feet non -assessable City of Bangor 33 feet non -assessable Bangor Hydro -Electric Co. 30 feet non -assessable Sidney and Lynette Weimen -504 Valley Avenue 245 feet non -assessable Maynard A. Call 479 Valley Avenue 271 feet non -assessable 2,019 feet $3,42271 Page Two It will be noted that a large amount of the property frontage is non -assessable, since it lies adjacent to the Kenduskeeg Stream Interceptor Sewer and is below the level of Valley Avenue. As recommended in the original Council .Order, the assessment should be pro -rated against the entire frontage so as to be approximately equal to the average City assessment for lateral sewer extensions. It should be further noted that the actual cost of the sewer installation was slightly higher than the original estimate of 821.680.00. This was primarily due to the necessary removal of an additional 39 cubic yards of trench ledge which was encountered duffing the excavation. It is recommended that the assessments be levied as noted above. Respectfully submitted, JOur. T. Frawley, City engineer