HomeMy WebLinkAbout1976-10-25 401 AD ORDER401 AO
Introduced by Councilor Soucy, October 25, 1976
CITY OF BANGOR
(mLE.) VVTIiQra ...._Accepting City Engineer's, Report Final Cost of
By Ge City Coa of Me City olBampor:
ORDERED,
THAT the attached Report of the City Engineer relative to
the actual coat and recommended assessments for the installation
of a sanitary sewer on Valley Avenue east of Kenduskeag Avenue
be and hereby is. accepted, and be it further
ORDEREH� that the assessments be levied as noted therein.
IN CITY, COUNCIL 401 AD _
estates 25, 1976 -
:Cgnsidei next Meeting -
1 O R D E R R,� -
SCITY CuFWTV Title, RECEIVED
IN Clxr COUNCIL. -CITY OF BANGOR
November 8, 1976 , AcceQt... City Bnyineer.. Re4oxt-
"' CITY CLERIC'S MICE
Amended by tubeto adder
az
p.
Clerk regtea to advertise - Final cost of Valley Avenue sewer >lfi OCi 18 Ah II 13
......................................
Aeolis hearing. Consider next
meeting.
Introduced and j
IN CITYCCD,C19 f/ ••• •••••••••••
xmemea za 19'I6 count n
Hearing Feld,eing closed - -
bythe following yes and n
vote. Councilors voting yes:
Brountae. Finnigan, Gats, Henderson, `
- McKernan, GWlss, Soucy, Willey and
Zendz1an. Passed.
A
CITY C PK
CITY OF BANGOR, MAINE v/
Engineering Department
October 14,1976
To the Municipal Officers:'
Reference is made
to City Council
Order No. 366 AC passed
September 22, 1975, authorizing
the
installation of a sanitary,
sewer on Valley Avenue
east of Eenduskeag Avenue. The installa-
tion has been completed, consisting of 1,000 feet of
8 inch
asbestos cement pipe and three manholes, extending
in a northerly
direction along Valley
Avenue from the so-called
Season College
Collector Sewer terminating at the intersection
of Valley Avenue
and Eenduskeag dvenue.
The actual cost of the sewer installation
was $22,620.08, of which 50%, or $11,310.04 mayybe assessed
against the properties
benefited, as follows:
Property Owner
Frontage Estimated Assessment
�-
Donald S. and 2ether
L. Bradman.
553 Valley Avenue
100 feet $ 536.90
Robert E. and Velma
L. Reynolds
220 feet 11181.18
Sadie L. Trask
529 Valley Avenue
99 feet 531.53
Bessie L. Raymond
523 Valley Avenue
192 feet 19030.85
George F. and Darlene
H. Bryant
493 Valley Avenue
313 feet non -assessable
Hugo and Peter Frati
516 feet non -assessable
City of Bangor
33 Peet 'nen-assessable
Bangor Hydro -Electric
Co.
30 feet non -assessable
Sidney and Lynette
Weiman
504 Valley Avenue
245 feet non -assessable
Maynard A. Call
479 Valley Avenue
271 feet non -assessable
2,019 feet $3,422.71
Page Two
It will be noted that a large amount of the property frontage
is mon-assessable, since it lies adjacent to. the Renduskeag Stream
Interceptor Sewer and is below the level of Valley Avenue. As
recommended in the original Council Order, the assessment should
be pro -rated against the entire frontage so as to be approximately
equal to the average City assessment for lateral sewer extensions.
It should be further noted that the actual cost of the sewer
installation was alightly higher than the original estimate of
821,680.00. This was primarily due to the neceasary removal of
an additional 39 cubic yards of trench ledge which was encountered
during the excavation.
It is recommended that the assessments be levied as noted
above.
Respectfully submitted,
�T-
John T. Frawley, 1
City Engineer
Substituted Copy 901 AD
November 8, 1976
CITY OF BANGOR, MAINE
Engineering Department
October 147 1976
To the Municipal Officers
Reference is made
to City Conseil order No.
366 AC passed
September 22, 1975, authorizing the installation
of a sanitary
sewer on Valley Avenue
east of Kenduskeag Avenue.
The installa-
tion has been completed, consisting of 1,000 feet
of 8 inch
asbestos cement pipe and three manholes, extending in a northerly
direction along Valley
Avenue from the so-called
Musson College
Collector Sower, terminating at the intersection
of Valley Avenue
and Keaduakeag Avenue.
The actual cost of the sewer installation
was $22,620.08, of which 50%, or $11,310.04 may be assessed
against the properties
benefited, as follows:
Property Owner
Frontage Estimated
Assessment
Donald J. and Esther
L. Bradman
553 Valley Avenue
100 feet 6
560.18
Robert E. and Velma
L. Reynolds
220 feet
1,232.40
Sadie L. Track
529 Valley Avenue
99 fact
554.58
Bessie L. Raymond
523 Valley Avenue
192 feet
1,075.55
George F. and Earlene
H. Bryant
493 Valley Avenue
313 feet
non -assessable
Hugo and Peter Frati
516 feet
non -assessable
City of Bangor
33 feet
non -assessable
Bangor Hydro -Electric
Co.
30 feet
non -assessable
Sidney and Lynette
Weimen
-504 Valley Avenue 245 feet non -assessable
Maynard A. Call
479 Valley Avenue 271 feet non -assessable
2,019 feet $3,42271
Page Two
It will be noted that a large amount of the property frontage
is non -assessable, since it lies adjacent to the Kenduskeeg Stream
Interceptor Sewer and is below the level of Valley Avenue. As
recommended in the original Council .Order, the assessment should
be pro -rated against the entire frontage so as to be approximately
equal to the average City assessment for lateral sewer extensions.
It should be further noted that the actual cost of the sewer
installation was slightly higher than the original estimate of
821.680.00. This was primarily due to the necessary removal of
an additional 39 cubic yards of trench ledge which was encountered
duffing the excavation.
It is recommended that the assessments be levied as noted
above.
Respectfully submitted,
JOur. T. Frawley,
City engineer