HomeMy WebLinkAbout1976-08-09 317 AD ORDER317 An
Introduced by Councilor Soucy, August 9, 1976
CITY OF BANGOR
(TITLE.) (DT4LNeL A22licarcon.€p _Utility Location a rmrt Bangor Hydro- _..
By tho City Cam tl of My ofBonpor:
ORDRRRD,
TUT the attached application for utility location permit is hereby
granted upon condition that the poles be nuuSered.
NOTE: Following are the public streets and highways referred to:
Beginning at a utility pole numbered 16 not located on the southeasterly
side of Fourteenth Street; thence proceeding saotMes[erly, one (1) pole
to be located on the southeasterly side over
pr
a distance of apoximately
30 feet; thence proceeding northwesterly On
Dodge Street, two (2) poles
to be located on the northeasterly side of said Dodge Street over a
distance of approximately 372 feet.
IN CITY COUNCIL
AuVst 9_,,1476
PasseiA:':
CITY CLEHK ��
.. - Titley
Applic. for Util. Loc. PeID t - BHB Co.
......................................
......................................
Introduced n0 ft a by
p
379 AU
ORDER
RECEIVED
CITY OF BANGOR
CITY CLEWS OFFICE
% AUG 2 AM 9 05
APPLIGTION FOR UTILITY LCCATIOP PERMIT
TO: MUNICIPAL OFFICERS CITY OF BANWg
BANGOR HYDRO-ELFCTRIC COMPANY, a Maine corporation being duly authorized pursuant to
the State of Maine to generate, sell, distribute and supply electricity in City of
Bangor , County of Penobscot , State aforesaid, hereby applies for
a permit to authorise it to locate, construct and maintain certain of its facilities
hereinafter described upon, along, ovexacross and a certain public ways situate in the
municipality hereinbefore referred toffiu
1ffip��x
(no public notice of this application to be made)
in accordance with the terns and conditions of Title 35, Section 2482, MRSA as amended.
LOCATION: Begtuning at a utility pole murdered 16 nam located on the southeasterly
aide of Fourteenth Street; thence proceeding southwesterly, one (1)
pale to he located on the southeasterly side over a distance of
approxinately 30 feet; thence proceeding northwesterly on Dodge Street,
two (2) poles to be located on the northeasterly aide of said Dodge
Street over a distance of approximately 372 feet.
DESCRIPTION:
The facilities will consist of a line composed of wood poles and supports therefor,
crossarms, wires and/or cables together with associated appurtenances. The minimum
clearance of the wires and/or cables, other than guy wires, will be at Inner eighteen
feet war the public way. The poles will be set within the limits of the public way, but
outside the part thereofcustomarilyy used for travel by vehicles. The initial operation
of the facilities will be at 7200/12470 volts, three phase; the voltage will
be increased as occasion therefor requires for operation not In success of 20" to ground.
Dated at Sensor , Maine, this BANGOR HYDRO-ELFCTR COIPANY
23rda day of duly 1976. By /
1Uttla east. to Field Engineer
APPLICATION FOR UTILITY LOCATION PERMIT
To: MUNICIPAL OFFICERS CITY OF BANGOR
BARGORHYDRO-ELECTRIC COAPA Of, a Maine corporation being. duly authorized pursuant to
The State of Maine to generate, sell, distribute and supply electricity in City of
factor , County of Penobscot , State aforesaid, hereby applies for
a permit to authorize it to locate, construct and maintain certain of its facilities
hereinafter described upon, along, over across and ac certain public ways situate in the
municipality hereinbefore referred toasaspNx
riurEdatlemE x ,
(no public notice of this application to be made)
in accordance with the terns and conditions of Title 35, Section 2482, MRSA as amended.
LOCATION: Beginning at a utility pole numbered 16 now located on the southeasterly
side of Fourteenth Street; thence proceeding southwesterly, me (1)
pole to be located on the southeasterly side over a distance of
approximately 30 feet' chance proceeding northwesterly on Dodge Street,
two (2) poles to be located on the northeasterly side of said Dodge
Street over a distance of approximately 372 feet.
DESCRIPTION;
The facilities will consist of a line composed of wood poles and supporta therefor,
crossaimires and/or cables together with associated appurtenances. The miniminimumclear nce of the wires and/or cables, other than guy wires, will be at least eighteen
feet over the public way. The poles will be set within the limits of the public way, but
outside the part thereof customarily used for travel by vehicles. The initial operation
of the facilities will be at 7200/12470 volts, three phase; the voltage will
be increased as occasion therefor requires for operation not in excess of 20U to ground.
Dated at
Bengor
, Maine, this
BANGOR RYDRO-ELRC/TRIV COMPANY23
yid
day of
July ,1976.
By '4L , 4s /
TI tle: Asat. to Field Engineer
J ..
W
vl
y
�L
to