HomeMy WebLinkAbout1976-01-12 91 AD ORDER91 AD
Introduced by Councilor Soucy, January 12, 1976
CITY OF BANGOR
(TIT(id (DrtVr, sfuthpr.jai.ng...Clty Manager.. to Sxecslte the Attached._..
I.. ,Ags t Stat Street Bridge Replacement
By W City Cased! of Me Oity of Basest.
ORDERED,
2tl1T the City Manager be and hereby is authorized o
behalf of the municipal officers to enter into the attached
Agreement with State Department of Transportation relative
to the reconstruction of the State Street Bridge Over
xenduskeag Stream; the approaches, and other appurtenant
facilities..
STATEML'NT OF FACT
The Agreement contains various specific conditions which
have been the subject of many previous discussions with the
State pertaining to street, sidewalk, curb, and street light
improvements, both within their project area and in the _areae
beyond each 'end of their project limits, which will result in
a complete rehabilitation of.6he Hammond -State Street area
between Central Street and Exchange Street. The Agreement
also contains various generalconditions which the State
normally requires on highway construction projects within the
city.
IN CITY COUNCIL 91 C)
January 12, 1976
Passed. I�.V
: - 'OR➢ER
cxme cne Titrer _
_. �wcn'osi ip9. c}cy naoayon co IU - - $EMVED -.
_
c CITY OF BANGOR
- CITY GLOWS, OFFICE
V tJa hGcxhe3 Per?enenc..-. ,st�c?. S.`-f$,ec .
ridge Replacement '7,8, JAO -2 P1 3 01
". . I _ Introduced ayd fv'i�
r � '
r ]ma
Bangor &tF-u-01-3(6)
Jauuary 6, 1976
Page 1 of 6"
CF,wMENT Attachment -1
TTj AGRE
THIS AG4EFMENT entered into this day of In the
year of our Lord one thousand nine hundred and seventy-si , by and between the State of
Marine, through its Department of Transportation, Bureau of Highways, duly autborgzed by the
laws of the State of Maine, hereinafter referred to as 'the State' and the City of Bangor,
Penobscot County, a body corporate, by and through its City Manager, thereunto duly auth-
orized, hereinafter referred to as 'the City'.
WHEREAS, 'the State' is planting the layout and reconstruction of a portion of H nd
Street and State Street as shown on plane for the proposed project, the limits of which
will begin at Station lOWO on Hammond Street and extend easterly about 505 feet to Station
15+05± for the purpose of this agreement, and will be defined as Federal Aid Project
PBF-U-of-3(6), and will hereinafter be referred to as 'the Project'.
NOW THFAEFORE, 'the State' agrees to do and perform the following:
I. To let a contract and construct Federal Aid Project BRF-U-01-3(6) substantially
In accordance with the plans prepared for 'the Project' by 'the State'. A
bridge will be constructed over the west channel of Kenduskeag Stream as well
as a bridge over the seat channel of Kenduakeag Stream. The bridges as pro-
posed will have 49 foot curb to curb roadway with 10 foot sidewalks on each
side of both bridges. The roadway between the two bridges will have a 49 foot
curb to curb width. Approaches will consist of a hot bituminous overlay from
about Station 10+00 to Station 10+45 coal from Station 14+00 to about Station
15+05. AM existing sidewalks within the limits of 'the Project' which are
removed will be replaced.
U. db construct a drainage system adequate to handle all surface and subsurface
water for the entire project, and to connect this drainage system into the
exiating sewer systema, eliminating any drainage structures deemed unnecessary
as part of 'the Project'.
Bangor BgF-U-01-3(6)
January 6, 1996
Page 2 of 6
-2- Attachment - 1
III. To maintain at least two lanes of traffic during the period of constructIon
and to provide one sidewalk for pedestrian access across the bridges.
IV. To provide temporary sidewalks and access to all buildings during the period
of construction within the limits of 'the Project'.
V. To remove and replace the parking eater poets as required within the limits
of 'the Project'. -
VI. To renove a portion of a 36 Leh reinforced concrete drainage pipe located left
of centerline, and to abandon the remainder in place, except if 'the City' wishes
to salvage the pipe, than 'the City' will remove said pipe at no expense to Rhe
State'.
VII. To install anchor bolts provided by 'the City' for the bus shelter.
VIII. To install light bases, standards, arta, Conduits and pull wires, within 'the
Project' limits, for the proposed lighting system.
IX. To maintain, aftercompletion, the bridges constructed as a part of 'the Pro-
ject' except for snow removal add ice control.
X. All encroachments presently existing within the flight of Way limits of Rhe
Project' such as signs, elevators, fire escapes, sidewalk heaters, etc., will
be allwei to remain.
AND, 'the City' agrees to do and perform the following:
I. To approvethe layout and construction of Federal Aid Project BHF -U-01-3(6)
described in Item I above under 'the State' agrees within, 'the Project'
Untie as set forth in this agreement and as shown on the plans provided by
'the State' including authorisation for 'the State' to utilise the existing
sewer systems for new drainage as described in Item II, above under 'the
State' agrees, and give 'the State' the right to remove or discontinue any
drainage structures deeded unnecessary as part of 'the Project'.
II. To acquire and Provide to 'the State' all land and rights in land necessary
for 'the Project'.
Bangor BRF-u-01-3(6)
January 6, 1976
Page 3 of 6
-3- Attachhant - 1
III. To pay for all construction costs outside the limits from Station 10+45 to
Station I4400 as shown on plane. for `the Project'.
N. To install all wiring and luminaires for the new lighting system within 'the
Project' wuta.
V. To jay the non-federal share for all street lighting items within the limits
of 'the Project', except for work done by 'the City' under Article N above,
under "'the City' agMse".
VI. To remove all existing light standards which are to be replaced for the new
lighting system within the limits of 'the Project'.
M. To remove, store, and replace all parking meterheeds which must be moved as
a result of 'the Project', and to store the existing parking meter posts.
VIII. To mark the locations of parking hater posts at the time of reinstallation,
such work should be done in cooperation with 'the State' and its contractor.
U. To furnish and locate anchor bolts for securing the has shelter located on
'the Project'.
R. To remove, store and replace the bus shelter located on 'the Project'.
U. To sashed all future maintenance and power costa for street lighting providing
an intensity comusmsurate with highway safety standards of approximately two
foot candles, within 'the Project' limits.
XII. To assume all responsibilities and coats for onow aid lee control for the entire
'Project', and all responadbilities and costs for mainteeunce of 'the Project',
accept for maintenance of the bridges as provided in Article IX above under
^'the State' agrees".
X111. To provide signing, (except guide signs) and traffic control devices, as neces-
sary, such as striping and croaswalk markers.
M. To eliminate and prohibit the disposal of any open sewage within the limits of
'the Project'.
` Bangor BBF -u-01-3(6)
January 6, 1976
Page 4 of 6
-4- Attachment - 1
1N. To make such changes within 'the City' fire alarm system, city sewers, city
water, and city street lighting, including service connections and mannole
adjustments and other 'City' owned and maintained utility fixtures (if exlst-
ing) without expense to 'the State' as may be reluired as a result of 'the
Project'. Such changes as may be necessary should be coordinated with work
being done on 'the Project' by the highway contractor.
M. To assume all claims for damages to private underground utility -type installa-
tion, wherever the locations of such installations are not known by 'the
State' or the contractor, or which locations may not be shown on the plans for
this project. Also, to be responsible for the removal, replacement, altera-
tion, or relocation of any existing private underground utility type installa-
tions (such as wires, water, sever, drain pipes) as may be necessary to permit
construction of 'the Project' within the previously described project limits.
XVII. To be responsible for and to notify all utilities that, except in the case of
an emergency, no service opening permits for opening any pavement within the
limits of the proposed project will be issued for a period of five (5) years
Iran the date of completion of 'the Project'.
XVIII. To regulate (where the control of utilities using the highways is delegated
to 'the City' the use by all pub16C end private utilities of any FaTtion of
the right-of-way of the highway within 'the Project' in accordance with the
rules, regulations, and policies applied by 'the State' in its control of
utility use of highways.
M. To make the attached "Backfilling nNuiress ts" or "City Ordinance" a part
of all service opening petits for work within the limits of 'the Project'.
U. To aaeums all responsibilities to insure as may be imposed by 'the City' by
low .that -any encroachments presently existing within the limits of the right-
of-way of 'the Project' do not Interfere with the use or safety of the highway
Bangor BRF-u-01-3(6)
January 6, 1976
Page 5 of 6
-5- - Attachment - 1
U. (Continued)
by the public, and are properly maintained or removed at no expense to 'the
State'. Any existing encroachment that is removed shall not be replaced
without prior approval of this State' and the Federal Highway Administration.
YYI. To prohibit ary new encroachments within the right-ot- ay of 'the Project'
after the effective date of this agreement, unless prior approval is obtained
from 'the State' and Federal Highway Administration.
Bangor BRF-U-01-3(6)
January 6, 1976
Page 6 of 6
-6- Attachment - 1
IN WITNESS WHEREOF THE PARTIES TO THIS ACRIONENT HAW IDECUTE) IN TRIPLICATE these
presents on the day and year first above written, the State of Maine by its Commissioner
of the Department of Transportation, hereunto duly authorized, and the City of Bangor by
its City Manager duly authorized by Council Order dated , n
attested true copy being attached -hereto and made a part hereof.
SICK, SEALED ANO DELIVERED STATE OF MAINE
IN THE PRESENCE OF: DEPA TKENT OF TRANSPORTATION
By Cormissioner
Roger L. Railer
CITY OF BANGOR
APP.tCV AS TO FOW:
-- - - Aesiatext Attorney General
Manager
Merle E.
Coff
APP.tCV AS TO FOW:
-- - - Aesiatext Attorney General
BAMIMING REQUIRP m
nackfill material shall be fine, readily compressible soil or granular material, at
or r optimum moisture content, and shall net contain stones larger than 3 inches,
frozen lumps, chtude of clay, maneal matter or any other objectionable material.
Me material shall be uniformly distributed in layers of not since than 8 inches,
loose measure and each layer thorougbly compacted by one of approved connection be-
fore successive layers are placed. When backfill is being placed around a pipe
r structure, operations shall be so conducted teat the fill is always at approximate-
ly the same elevation on both aides of the structure. Water &ball be added when neces-
sary to. increase the moisture content of the backfill material to obtain cacpaction.
Puddling or jetting of backfill will not be allowed.
All sheeting and bracing used during execration shall be renoved by the utility follow-
ing the completion of the work, and all voids resulting from the use of the sheeting
and bracing backfiued where necessary unless otherwise directed by the 'Department's'
Engineer.