Introduced by Councilor mcRernan, recember 37, 1976
CITY OF BANGOR
MW (Drur,__Accepting City Engineer 1 a Report Estimated Cost of t
Judson Heights Subdivision, Phase I, Part B
By tqe City Coamit of the City Of8anw:
ORDERED,
THAT the attached report of the City Engineer Showing the
estimated cost and recommended assessments for the completion
of Phase I of the Judson Heights Subdivision, including the
extension of Judson Boulevard, the construction of a portion.
of LaSalle Drive, the construction of Castle Hill, as well as
the installation of a sewer to serve the proposed Judson Park
Mobilehome Development be and hereby is accepted, and be it
further - -
ORDERED, that the sum of One Hundred Seventy-five Thousand
Dollars ($175,000.00) be authorized tocoverthe cost of said
project, Said sum to be included in the 1977 Bond Issue.
IN.CITY -COUNCIL _
UecemMc,27, 19-76
Re£enied to Finance CovmQttee.
Consider next meeting,
secxex c
IN CITY COUNCIL -
January 12, 1977 -
Consider nest 'meting-
CITY
IN CITY COUWC L ,
January 24, 1997
Consider n xt'meeting,.
!J&. CITT MJC ?aAgs
IN CITY COUNCIL
February 14, 1977 .
Consider n4,t meeting.
CITY CIE
IN CITY COUNCIL
February 26, 1977
Consider nesxt.aeeting.
CITY CISRF
IN CITY COUNCIL
ArchM, 11977
Consider n t meeting.
Ow c
69 AT
ORDER
True,
ACtegiing City. En9ineei .s Report -
Estimated Ca.. st of'.Ju.daon..XeigM1te
................
Subdivision, Phase ae I, east X.
Introduced annde -filed by
clua .
Coancilman
IN CITY CC@CIL
Marcb.28, 1977
Amended by substitution,
as ended, Rsssed.-
��__:ITd
CITY CLZVK
RECEIVED
CITY OF BANGOR
CITY OLEP,g'S OFFICE
278 0£C e'd PI 4 -29
69 AD
Introduced by Councilor McKeehan, Dacember 27,1416
r CITY OF BANGOR
(TITLE.) (OTi1BT Re eptin9 city. Engineer's. Heppr - Batimat d goat of _..
__........ xegggp_ s bd onPh is ecs
By CBY COmme I of Me Cit ofBeagar.
ORDERED,
TBALT the attached report of the City Ogineer Showing the estimated
oat and recommended assessments for the completion of phase 2 of the Judson
Heights. Subdivision, including the extension of Judson Boulevard, the
construction of a portion of LaSalle Drive, theconstruction of Cantle Hill,
as well as tWinstalsation of aer to serve the proposed Judson Park
Mo®ilehoax Development be and hereby is accepted, and be it further
OPDEAID, that the sum of 2igbty-four thousand, One INMred Forty-three
Dollars ($84,143.00) be transferred from the Reserve for Future Construction -
General (92-2235) and the Sam of eighty-seven Thwsand, Five Hundred rwenty-
n Dollars ($8],52].00) be transferred from the Reserve for Future
Construction - Sewer (92-2236) to cover the cost of said project.
CITY OF B GORI MAINE
Engineering Department
December 21, 1976
To the Municipal Officers:
Reference is made to City Council Order No. 119 AD passed
January 26, 1976, directing the City Engineer to prepare cost
estimates and estimated assessments for the completion of Phase I
of the Judson Heights Subdivision. The plane and cost estimates
have been completed, which include the following:
1. The extension of Judson Boulevard for a distance of
approximately 800 feet to the proposed Judson Park Mobilehome
area.
2. The construction of LaSalle Drive for a distance of
apprOx mately -480 feet from Judson Boulevard.
3. The construction of Castle Hill,
4. The installation of a sanitary sewer line extending from
Broadway to the southerly line of the Judson Park Mobilehome area.
Judson Boulevard would be extended for a distance of 620 feet
at a 36 foot width, with the remaining 180 feat tapered to a 30
foot width. The roadway would be constructed of bituminous concrete
with a sod edge and would allow for the future construction of side-
walks on both sides. The street would be provided with a storm
sewer system, and a separate sanitary sewer system, with lateral
sanitary service connections to each lot.
LaSalle Drive would be constructed to a width of 36 feet
with an allowance for a future sidewalk on one side, and would
consist of a bituminous concrete surface with sod edges. This
street would also have a storm sewer and a separate sanitary sewer,
with lateral sanitary service connections to each lot.
Castle Hill would be constructed to a width of 24 feet for
a distance oV1,30 feet, and would narrow to a width of 20 feet
around a cul-de-sac at the end. It would also be constructed
of bituminous concrete with sod edges, but with no sidewalk.
A storm sewer would not be required, but a sanitary sewer with
lateral connections to each lot would be included.
The trunk sewer would extend from Broadway to LaSalle Drive,
and thence to Judson Boulevard by way of "K" Street end would then
follow Judson Boulevard to the Mobilehome Park line. Service connec-
tions would be installed from the true sewer to serve future lots
along "K" street. It is not intended to construct "K" Street at
this time.
-2 -
The total estimated cost and breakdown of assessments for this
work is as follows:
City
Developer's
Total
Share
snare
Cost
Judson Blvd.
Road
131240.
21,620.
34,860.
Storm sewer
61100.
69100.
12,200.
Sanitary Sewer
141020.
141020.
289040.
LaSalle Drive
Road
81195•
109155•
18,350•
stolonSewer.
27050.
2,050•
4,100.
Sanitary sewer
29660.
2,660.
5,320.
Castle Hill
Road
29375.
49605.
69980.
Sanitary Sewer
11420.
19420.
2,840.
Trask Sewer
Judson Blvd. to 'R"
St.
49375.
4,375.
89751.
"E" St. to LaSalle
1,145.
1,145.
29290.
Lasalle to Broadway
99710.
99710.-
199420.
Sewer Connections
Judeon Blvd.
79330.
7,330.
LaSalle Drive
1,060.
19060.
Castle Hill -29750.
29750.
- "E" Street
.19770.
1,770.
$65,290.
$909770.
$156,060.
10% Engineering
69530.
91080.
159610.
Total:
$71,820.
$99,850.
$171,670.
-3 -
As noted in the above breakdown, the City would pay fifty
per cent of the cost of storm end sanitary sewers, except for
service connections to lots, which would be paid entirely by
the Developer. The City's share of Judson Boulevard is deter-
mined by the provisions of the Subdivision Ordinance, which would
amount to $17.00 per foot for the first 620 feet end $15.00 per
foot. for the remaining 180 feet. The City's share of LaSalle
Drive would be $17.00 per foot, and the City's share for Castle
Hill was computed at the rate of $6.25 per foot. It is not recom-
mended that the sidewalks be constructed until such time in the
future when most of the lots have been developed; however, an
allowance will be carried for the future constriction of said
sidewalks in the eventual assessments against the development.
Engineering costs would include charges for the design of
the above described improvements, preliminary survey and prepa-
ration of construction drawings. Since much of this work is
being done by a private consultant for the Developer, the City's
participation would be limited to actual fees paid by the Developer,
but not exceeding the percentage prescribed by ASCE Manual No. 45,
"Consulting Engineering", 1975 Edition; other direct costs for
necessary. engineering, including borings, probings, inspection,
construction layout and testing would also be considered eligible
for inclusion into the total project cost.
The subject project will benefit only 11 house lots, since
most of the benefit will be realised by the further development
of the Mobilebome Park area and by further extensions of the
project; consequently, it would not be feasible to pro rate
the assessment against the lots benefited. As as alternative,
it is recommended that assessments be placed upon each of the
11 lots which are equal in amount to the deferred assessments
against the lotsinPart A of Phase I, recently completed; these.
assessments have not been finalized but are estimated to be approx-
imately $5,000.00. It is further proposed that these assessments
be deferred, to be levied as each of the 11 lots are sold, but
in any event, it is recommended that the entire assessment for
Part B, Phase 1, as described above, be paid within 6 years from
the date of completion, presently estimated as the fall of 1977•
The deferral of the assessment would be dependent upon the execu-
tion of an acceptable Subordinate Agreement for recording in the
Penobscot Registry of Deeds. Plans of the proposed improvements
are on file in the office of the City Engineer.
-
Respectfully submitted,
Jo T.�awley,
City Engineer
M
Amnnding Council Order 69 AE - Accepting City Engineer's
Repmrt - Estimated Cost of Judson Heights. Subdivision, -
Phase I, Part B
ORDERED, that the sum of Eigbty-four Thousand, One Hundred Forty-threei'
Dollars ($84,143.00) be transferred from the Reserve for Future
Construction - General (92-2235) and the sum of Eighty-seven
Thousand, Five Hundred Twenty-seven Dollars ($87,527.00) be
transferred from the Reserve for Future Construction -_Sewer -
(92-2236) to cover the cost of said project.
V