HomeMy WebLinkAbout1976-12-13 36 AE ORDER36 AE
lntroduced by Councilor case, December 13, 1575
CITY OR BANGOR
(TITLE.) Mrbtr---- Accept ng_ City_Engnneer s.. Report - Frnal Cost oT
Street Construction
By eAa Gip Caweito(W CteyNBa*Om':
OEDWED,
THAT the attached Report of the City Engineer showing the
final cost and recommended assessments for the construction of
Dodge. Street between Fourteenth Street and Fifteenth Street be
and hereby is accepted, and be it further
ORDERED, that said assessments be levied as noted therein.
' IN: =Y COUNCIL _ 36 AE
-Cecembes 3J, 1976
Clerkdited to advertise O R D E R at
P blic NaAf ey consider
ne t m9eting. .. Title,
'-
xCe tin Cic en ineer a Ee ort -
cxmY c w: ..... R... A...X.. 9.....:.... R........
IN CITY COUNCIL Final Cost of
i. olEtreet Constmetion.o......•
Decemer 37lg76
Hearing held, hearing closed,
P seed
loiodu d Hled by
4 -
CITY C
Councilman
RECEIVED
CITY OF DRRCOR
CITY CLERi15 OFFICE
% DEC 3 Ph 3 IU
CITY OF BANGOR, MAINE
Engineering Departmeht
November 30, 1976
To the Municipal Officers:
Reference is made to City Council Order No. 149 AN passed
March 8, 1976, which authorized the construction of Dodge Street
between Fourteenth Street and Fifteenth Street, including the
installation of storm and sanitary sewers. All work has been
completed, consisting of the following:
The new roadway was constructed to a width of 24 feet,
consisting of a 116 inch bituminous surface on a 6 inch gravel
base and a 12 inch gravel subbase. A sidewalk has been provided
along the easterly side. A storm sewer system, consisting of 2
catch basins and a 10 inch asbestos cement connection to the
existing storm sewer an Fourteenth Street was also provided.
Sanitary sewer service consisted of the installation of 395
feet of.8 inch asbestos cement pipe and 2 manholes, connecting
to the existing sanitary sewer on Fourteenth Street. Four
inch lateral sewers were installed from the City sewer to each
of the lots to be developed. .
The total cost of the project was $20,969.58, broken down
as follows:
Street construction $101407.58
Storm Sewer 4,412.00
Sanitary Sewer 4,970.00
Sanitary Laterals 19180.00
Total $M-1 76T -3s
In accordance with the provisions of the Subdivision
Ordinance, the City would pay $6.25 per foot for the roadway,
or $3,260.00 for the total length of 522 feet. The City would
also pay, 50% of the cost of atom and sanitary sewer installa-
tions, except for the sewer laterals, which would be assessed
entirely against the lots to be served. The City's share would
thus be $79951.001 with $13,018.58 to be assessed against the
adjacent properties, as follows:
West Side
Name - Frontage Assessment
Gilmer L. and Shirley J.
Nadeau _ 100 feet $ 11183.86'
Fowle Brothera Home Building
and Remodeling Co., Inc. 300 feet 49167.22
Hubert R. and Hilda A.
Golding" 100 feet 11183.86`
10 -mm,
East Side
Rome Frontage Assessment
Bruno M. and Ruth C.
Grenci
150
feet
$ 1,775.79*
Fowls Brothers Rome Building
and Remodeling Co., Inc.
275
feet
3,819.96
David M. and Annie M.
Cole
715
feet
887.89*
Total. 11000 feet $13,018.58
*Corner lots, fronting on either Fourteenth or Fifteenth
Street, which would not benefit by the street or sewers
construction..
It should be noted that 425 feet of the frontage represents
corner lots which are presently servedeither by Fourteenth
Street or FifteenthStreet, and which would not receive additional
benefit by the new street or sewer construction. The only property
benefitting by the new construction would be 575 feet of frontage
owned by Fowls Brothers, having a total assessment of $7,987.18.
Therefore, as recommended in the original Council Order, the
remaining assessments against the property Which would not benefit
would be included as part of the City's share of the coat, making
a total City share of $12,982.40.
It is recommended that the assessments be levied as described
above. Plans showing the actual construction are on file in the
office of the City Engineer.
Respectfully submitted,
ohn T -w,
City Engineer
RECEIPT FOR CERTIFIED MAIL -30P (plus postage)
Am. 1071 ww MM fOR IXRRRROOMI MRR
�^
awrc
%/ /✓Vf
P
ICES FOR
Plus
EEE�6
NEUME
�
M M
n ,IgEs
Am. 1071 ww MM fOR IXRRRROOMI MRR
STICK MUNE STOP$ TO MCLF IC COVER POSTAGE Most dee or awl
TESTIFIED MAIL EQ, AND COW" FOR SM/ SELECIPO OMOCLL SERICES. Ime M1oatl
E if ard, and MIS Mail" hIits ofO amid. Imn Me bucket dl keStick tol and plantement The article Per
a` post Pricean Of the `umeu
riM&l or nand It to put Fall Curds, Ino Says Wryl
3. It Vol do not vent this rtwiit potlmbod. link And ewFancd SEG on Ink lett pardon m
ME delle erne M the mine. dare, dorm and rWm the reenot and mail the amne.
A ;arcxlpl ea`d. Find OVI1,Me a`t itt b thebeank WF of ue° TO"
enrnmeans al Me
returnummed alta. wal frog m aIkle FEARS RECEIPT FNYESIEp
0 ITO
0 RRESFE pILY 1Na°Me sa enendors mentIS the dln Ione 3 of We It on the MITI nceeN cnt ard it
"SAM, is rey sW.
Ic Two MIS r ipt 20 proem R it pu make inpuirv.
'9lb
use
u
senDm^w•s
�ti ewana ien®moi en a.xnr.wa
{� mm emeM meas
CRY am
E YeW��NaW
c
L
Rflm
Leonard
E. Fwle, Pres iaent
Dale Brother Company, Inc.
Box
IMM
n6
levant,
Maine 04956
new
Mar 21%
NOTICE OF ORDER
'-rt
In accordance with City Council Order No. 36 ISaccepting the
City engineer's report of the final costa of the construction of
[rest aM space assessments a public hearing
will be held in the City Council Chambers On the third floor of
City Bell, 73 Harlow Street, Bangor, Maine, on Monday Oeeeaker 29, 1976
at 8:00 P.M. for the purposes of a hearing on the subject mattes
of asmens for said construction.
SinceasPortion of the proposed assessment would apply to property
Owner by you at stage Street
invited to attend, to be heard upon the Subject.
You are
A copy of the Council Order u h City Engineer's report ithisenclosed
for your information. I£ you have any questions regarding(207)thls
matter, please call the City Engineer's office at (20'!) 997-0391, ]r.., 222.
Alvera Synod
City Clerk