HomeMy WebLinkAbout1976-11-08 13 AE ORDER13 As 1
Introduced by Councilor Gass, November 9, 1976
CITY OF BANGOR
(TITLE.) (DXbgr_ .Accaytangcity Engineer's .Report - Final Cost of
Bradford Commode Sewer
By Ike dry Cmwoa of the Cay of Baume:
ORDERED,
THAT the attached Report of the City Engineer showing the
final cost of the Bradford Commons Sewer extending from Blanchard
Street to Husson Avenue be and hereby is accepted, and be it further
CRDEREDq that said assessments be levied as noted therein.
IN;CITY CWNCIli
NweMbsX 9, 1976
4Consider, next meeting.
.;clerkdirected to advertise -
publiC-hearing".�
CITY C
IN CI'M COUNCIL '
Novewber 22, 1976
Hearing held, hearing closed,
Passed.
CPM C
13 AE
ORD ER N5
3
Title,
Xce tin Cit Eine
: t :
e[ s Report
.....4...9....Y.. .............
Final cost of Bradford C0000as sewer.
Iry a ed a 'lea by
.. ..unci.....
CCwci men
RECEIVED
CITY OF BANOOR
CITY CLERK'S OFFICE
P16 YOU 4 Ah 9 35
i
' CITY OF RANGER, MAINE
Engineering Department
November 3, 1976
To the Municipal Officers
Reference is made to City Council Order No. 367 AS passed
September 22, 1975 which authorised the extension of the sewer
on Grandview Avenue. All work has been completed, consisting
of the following:
The sewer extension consisted of the installation of 570
feet of 8 inch asbestos cement pipe and two manholes, extending
in a northeasterly direction on Grandview Avenue from the
existing terminus near the Arctic Brook Sewer toward Essex
Street. The actual coat of the sewer installation was $6,918.70.
Of that amount, the City would pay 50%, or $3,459.35, and the
remaining amount would be assessed against the properties bene-
fited, as follows:
Owner Frontage Final Assessment
South Side
Paul M. Shannon,
Lot 5 83.95 feet 8 203.92
Lot 6 84 feet 204.04
Lot 7 120 feet 291.49
Church of Jesus Christ
of Latter Day Saints 578 feet 1,404.02
North Side
Brookside Gardens
Lot 2 93.03 feet 225.98
Lot 3 93.03 feet 225.98
Lot 4 93.03 feet 225.98
lot 5 93.03 feet 225.98
Lot 6 93.03 feet 225.98
Lot 7 93.03 feet 225.98
Total: 1,424.13 feet $39459.35
It is recommended that the assessments be levied as acted
above. A Plan showing the actual sewer installation is on file
in the office of the City Engineer.
wu, �� 1RespectfullT submitted,
NG
W. a,l.:'.'x..°"°y1�,_
w"%•�' John T Frew eT
Citi Engineer
CWNCIL —i
CITY OF BANGOR, MAINE
Engineering Department
November 3, 1976
To the Municipal Officers:
Reference is made to City Council Order No. 273 AD passed
June 28, 1976, which authorized the construction of a sewer
extension through the Bradford Commons development north of
Bangor Gaylene. The sewer installation has been completed,
as follows:
The installation consisted of 1,300 feet of S inch Class
2400 asbestos cement pipe and four manholes, extending from the
existing sewer at the intersection of Blanchard Street and Knox
Avenue, through the Bradford Commons development, to the north
side of Hasson Avenue. The total actual cost of the sewer
installation was $101791.14. Of this amount, the City would
pay 50%, or $5,395.55, and the remaining 50% would be assessed
against the property benefited. It has been determined that the
Bradford Commons development, in the name of G & S Associates
of Bangor, would benefit by 1,045 feet of the proposed instal-
lation, and should be assessed for that portion of the sewer.
Pro rating that length against the total assessment would result
in an assessment against the Bradford Commons development of
$4,337.21. It is recommended that the remaining $1,058.36 be
assessed against Husaon College, which will also benefit by
the new sewer. It is further recommended that the assessment
against Husaon College be deferred until such time as sewer
entry is requested if Husson so desires, with the deferred
assessment to be increased by 50% to $1,587.54.
It is recommended that the assessments be levied or
deferred as noted above. A Plan showing the actual location
of the Sewer is on file in the office of the City Engineer.
Respectfully
�submitted,
John T. awley,
City Engineer