HomeMy WebLinkAbout1977-03-14 154 AE ORDER159 AE
Introduced by Councilor MCKer,aa, M ch lar 1977
CITY OF BANGOR
(Tau PHrber, _AcceptingProposal from _Metcalf & Eddy, Inc.
Sewerage Facilities Planning
------- _.. ..._..____ _. _.. .............. _.. _. _.
By Bu City Coano0 of Hee City OfBanyor:
ORDERED,
THAT WHEREAS, Metcalf & Eddy, Inc. have previously been
engaged by the City of Bangor to undertake a Sewerage Facilities
Planning Study, as required by the Environmental Protection Agency,
and
WHEREAS, the evaluation of alternative methods of wastewater
treatment, including lesser forms of treatment as recommended by
the Penobscot RiverStudyis considered necessary,
NOW THEREFORE, be it
ORDERED, that the City Manager be and hereby is authorized to
accept the attached proposal"from Metcalf & Eddy, Inc. for addi-
tional services related to an evaluation of the recommendations of
the Penobscot River Study,_ and be it further
ORDERED, that the a= of Four Thousand Dollars ($4,000.00) be
allocated from the Sewer Fund to cover the cost of said services.
STATEMENT OF FACT
The Facilities Planning Study, a very detailed analysis of
our overall sewerage system as required by EPA, has previously
been funded in the total amount of $88,200.00, with the City of
Bangor's share being 10%, or $8,820.00. The incorporation of
the Penobscot River Study data into the report at an additional
cast of $41000.00 would be funded by the City.
154 AE
IN CIDP COIMCIL
March 24, 1974agreemen-
"
3rd line read " .se
in conda� in
d linet- 0 R 0 E R- gy5
treatment as defined by the EPA 'for
bHe. City". As amended, passed. Title, _
AcceptSng .....Prop..os..al .Prom Metcalf & Eddy
CITY G1E .....................
Sewerage Facilities Planning.
Introduced and filed by
Cowcilmzn
p_
RECEIVED
CITY Of 9ANGOA
. CITY CLERIC'o OFFICE
''77 W& Ph 3 29
154 AE
AGREEMENT
r .BETWEEN
CITY OF BANGOR, MAINE
AND
METCALF B EDDY, INC.
FOR
PROFESSIONAL SERVICES
THIS AGREEMENT, made this day of
1977, by and between the City of Bangor, Maine, acting herein
by and through its City Manager who is duly authorized so to
act, hereinafter called the City, and Metcalf A Eddy, Inc.,
with offices at 50 Staniford Street, Boston, Massachusetts,
hereinafter called the Engineer.
WITNESSETH, for the considerations hereinafter set forth>
the parties hereto agree as follows:
ARTICLE 1 - ENGAGEMENT OF THE ENGINEER
The City hereby engages the Engineer and the Engineer
hereby accepts the engagement to perform certain engineering
services in connection with developing a 201 Facilities
Plan hereinafter called the Project.
ARTICLE 2 - SERVICES OF THE ENGINEER
2.1 General -
2.1.1 The Engineer will perform professional services in
connection with the Project as hereinafter stated.
2.1.2 The Engineer will serve as the City's professional
engineering representative in those phases of the
Project to which this Agreement applies and will -
give performance of his services.
2.1.3 The Engineer will evaluate the Penobscot River
Study Wastewater Treatment Alternative, which
indicates that secondary treatment/for the City
of Bangor is unnecessary for presentation in
the 201 Facilities Plan Report, as orally agreed
to by the Federal EPA and State DEP with the
stipulation that Federal and State funds cannot
be used for this alternative and provided that this
is not the recommended alternative.
2.2 Penobscot River Study Wastewater Treatment Alternative _
2.2.1 Consult with the University of Maine at Orono
- concerning the Penobscot River Study, to obtain
3.1
3.2
3.3
additional information and to select portions of
the Study for use in the 201 Facilities Plan.
2.2.2 Develop basic design data, construction costs and
annual operation and maintenance costa for this
alternative. -
2.2.3 Review the Penobscot River Study and incorporate
the significant environmental impacts for this
alternative, as presented in the Study.
2.2.4 Prepare and submit this alternative as part of the
Facilities Plan Report and the Environmental
Assessment Report..
ARTICLE 3 - RESPONSIBILITIES OF THE CITY
The City, without cost to the Engineer, will:
Placy at the disposal of the Engineer all available
Information pertinent to the Project upon which the
Englnccr can rely, including previous reports and any
other data relative to the Project.
Provide access to and make all provisions for the Engineer y
to cntor upon public and privatelands as required for
the Engineer to perform his work under this Agreement.
Dcsl P,nate in writing a person to act as. the CityTS
representative with respect to the work to be pe forced
under this Agreement, such person to have complete -
authority to transmit instructions, receive info ztion,
interpret and define the City's policies and decisions
with respect to the work covered by this Agreement.
Prov LL. for the use of selected portions of the
Penobocot River Study in the Facilities Plan Report - ..
and .the Environmental Assessment Report. .
ARTICLE 4 - PERIOD OF SERVICE
Upon the return of this Agreement to the Engineer,
signed by the parties hereto, the Engineer will b=gin
his services promptly and will prosecute them diligently
so as to complete the services as rapidly as the needs
my require andtheconditions may permit. _
The Engineer shall not be responsible for any delays
in the pArformance of his services hereunder caused by
strikes, action of the elements, acts of any government,
civil disturbances, delays of the City in supplying
Information and in reviewing material submitted by the
.Engineer or any .other cause beyond his reasonable control,
-2-
3.1
3.2
3.3
additional information and to select portions of
the Study for use in the 201 Facilities Plan.
2.2.2 Develop basic design data, construction costs and
annual operation and maintenance costa for this
alternative. -
2.2.3 Review the Penobscot River Study and incorporate
the significant environmental impacts for this
alternative, as presented in the Study.
2.2.4 Prepare and submit this alternative as part of the
Facilities Plan Report and the Environmental
Assessment Report..
ARTICLE 3 - RESPONSIBILITIES OF THE CITY
The City, without cost to the Engineer, will:
Placy at the disposal of the Engineer all available
Information pertinent to the Project upon which the
Englnccr can rely, including previous reports and any
other data relative to the Project.
Provide access to and make all provisions for the Engineer y
to cntor upon public and privatelands as required for
the Engineer to perform his work under this Agreement.
Dcsl P,nate in writing a person to act as. the CityTS
representative with respect to the work to be pe forced
under this Agreement, such person to have complete -
authority to transmit instructions, receive info ztion,
interpret and define the City's policies and decisions
with respect to the work covered by this Agreement.
Prov LL. for the use of selected portions of the
Penobocot River Study in the Facilities Plan Report - ..
and .the Environmental Assessment Report. .
ARTICLE 4 - PERIOD OF SERVICE
Upon the return of this Agreement to the Engineer,
signed by the parties hereto, the Engineer will b=gin
his services promptly and will prosecute them diligently
so as to complete the services as rapidly as the needs
my require andtheconditions may permit. _
The Engineer shall not be responsible for any delays
in the pArformance of his services hereunder caused by
strikes, action of the elements, acts of any government,
civil disturbances, delays of the City in supplying
Information and in reviewing material submitted by the
.Engineer or any .other cause beyond his reasonable control,
or for the expenses. or consequences arising from such
Milays.
ARTICLE 5 - PAYMENTS TO THE ENGINEER
1
For the services performed under Article 2..2y the City will
pay the Engineer, monthly as charges accrue, on a cost plus
fixed fee basis. Charges will include costs Incurred fl ring
the billingperiod plus a portion of the fixed fee based on the
-
e of the percentage of his work Completed.
t p g e'
The cost portion of the eplus fixed fee will not be
The cost p rtion
nt being formally amended, and the
eecowithout the Agreement
fee incl not be ceased except for an Agreement
flmrd fee
a ndment increasing the scope of work. The .Cost plus fixed
f,,'
fc o. and the fixed fee is listed below.
5.1.1 For the services under Article 2.2,
Cost plus fixed fee: $4,000
Fixed Fee: $ 600
C. int will include direct labor, indirect coats, and direct
..5-2
mints.
,.2.1 Direct. Labor is salaries and wages paid to personnel for
time chargeable to the Project.
5.2.2 Indirect costs are allocations of (overhead) costs which
are not directly chargeable to specific engagement.
-'
5.41.3 Direct costs include such typical expenses as cost Of:
transportation and subsistence; long—distance telephone`
and telegraph; printing and reproduction; computer.time
and programming costs; identifiable supplies; outside-
Consultants' charges; subcontracts for services such as
surveys, subsurface investigations,, and testing by
commercial laboratories; and charges by reviewing
_
authorities.
ARTICLE 6 - GENERAL PROVISIONS
6.1
Lltl.ation and Additional Work
In the event the Engineer is to prepare for or appear in any
_
111.1gation in behalf Of the Client or is to make investigations
or reports on matters not covered by this Agreement, or is to
porform other services not included herein, additional
Compensation shall be paid the Engineer as is mutually agreed
TN WITNGOS WIIEREOF, the parties hereto have executed this -
Agreement the day and year first above written.
CITY OF BANGOR, MAINE " Y,
By.
Title:
METCALF & EDDY, INC.
By:
v Charles A. Kna p
Title: -Vice President
Y
Y