Loading...
HomeMy WebLinkAbout1977-09-12 370 AE ORDER3]0 A£ Introduced by Councilor Mcxernan, September 12, 197 CITY OF BANGOR (TITLE.) Wrbgr Acceptssig_City,Enganeer'sReport College Park Subdivision Sewers By ttw CUV CouneU of at CRN of ORDERED, THAT the attached report of the City Engineer showing the estimated coats and recommended assessments for the installation of sanitary sewers in the College Park Subdivision on Husson Avenue be and hereby is accepted, and be it further =MD, that the installation of said sewers commence as soon as possible, provided that the Developer submit his share of the estimated coats prior to the start of construction, and be it further ' ORDERED, that $10,500.00 be transferred from the Reserve for Futare Construction Fund - Sewers to cover the City's share of the sewer installation. 370 Ag 0 CITY COUNCIL - September 12, 1977 Peele^d. d ORDER 448 CITY CLS Title, Accepting City Eng. Repot[ - College ...................................... Park Subdivision Sewers ...................................... ((.� .Introduced �and p filed by Councilman RECEIVED CITY OF CITY CIEP.'"":+ •:.`LIGE °77 SCP 9 FM 2 58 CITY OF BANGOR, MAINE Engineering Department To the Municipal Officers: September 8, 1977 Reference is made to City Council Order No. 347 AS passed August 8, 1977, directing the City Engineer to prepare Cost Estimates and estimated assessments for the installation of roads and sewers in the so-called College Park Subdivision on Husson Avenue, as petitioned by the Developer, Mr. Warren Sawyer. Plana and Cost Estimates have been completed on the sewers which will serve lots fronting on the existing Husson Avenue, and at the request of Mr. Sawyer are submitted as follows: Five hundred seventy-five feet of 8 inch pipe and 2 manholes would be installed to serve five lots on the south side of Husson Avenue, commencing at the existing sewer located approximately 1,200 feet east of Eenduskeag Avenue. The total estimated cost of the sewer installation is $141000.00. Of this amount, the City would pay 50% and the remaining $7,000.00 would be assessed against the Developer, Mr. Warren Sawyer. The installation of an additional 230 feet of 8 inch sewer and 3 manholes extending north from the existing sanitary sewer would serve the first 3 lots located on the south side of Musson Avenue beginning at Eenduskeag Avenue. The total estimated cost of this sewer is 56,400.00, with the City paying 50% and the remaining $3,200.00 to be assessed against the Developer, Mr. Warren Sawyer. - Since the installation of these sewers would provide a substantial start in the development of residential house lots within the Subdivision, it is recommended that they be constructed as soon as possible. Phone showing the proposed sewer installations are on file in the office of the City Engineer. Respectfully submitted, Sohn T. Frawley, City Engineer