HomeMy WebLinkAbout1977-08-08 348 AE ORDER348 As
Introduced by Councilor ewlas, August 8, 1977
CITY OF BANGOR
(TIU) Wr1bgrI...Accepting Proposals from Andrew J. Shykal L s t -
Construction layout of Glenwood Subdivision and Judson Heights
Subdivision
.
.._.._... _
_--- .__------------------------------------.......................__._._. .........
BYtM City CouwBoftAe City efeaaeor:
ORDERED. -
TWT the attached proposals from Andrew J. Shyka for
providing initial construction layout survey work for the
Glenwood Subdivision and for the Second Phase of the Judson
Heights Subdivision be and hereby is accepted, and be it further
ORDERED, that the coats for said survey work be charged
against the existing capital accounts for said Subdivision
construction.
STATEMENT OF FACT:.
The original layout end survey of the subject Subdivisions was
performed b9 AndrewJ.. Shyka.Since he is familiar with all of
the controlled data, it is considered most advantageous to have
him provide the initial construction layout, with all subsequent
construction. survey to be carried on by the City Engineering
Department. The cost of this work will be included in the eventual
assessments to the Developer.
348 At .
7
IN CIW COUNCIL
August 8. 1977
Passed, _.
a , _ ORDER.
cxmr c nue, -
'RECEIVED
ucepdpg; eippjp. Brom. apapeW,;.,,,,. 'CITY OF BANGOR.
CITY CLERK'S OFFICE
MAP'. F, P,,.'. CPPPk,. I PPP. pi. P}PPYpOd .
.sumly. s..T,aepa Height$ SUWIV. '77 AUG 4 PO 4 05
nln//guauc a lea by .
Count>luaN
ANDREW J. $HYKA
TEI_ 9124223
August 4, 1977
John Frawley, city Engineer
city Hall
73 Harlow St.
Bangor, ME 04401
RE: Glenwood, Kenduskeag Ave
Dear John:
193 Eecxnxac STREET
BANGOR. MAINE 04401
I would like to submit a proposal for survey work to be
done prior the construction project layout of roads in
the subject subdivision.
WORK TO BE DONE:
1) construction hubs set at 50 feet intervals on both
sides of the roadway to be built. -
2) Lists of elevations of the taps of these hubs would
be submitted to your office.
3) Bench marks would be established within the project
area at convenient locations. _
This work would be billed at a per -hour basis. Please
see enclosed fee schedule.
It is my, estimate that the 2900 linear feet of roadway
that would be established and staked with corresponding
elevations on stakes would cost about $2;619.
Thank you for the opportunity to submit this proposal
very truly younal
Andrew J. Shyka
AJS/fpa
SCHEDULE OF HOURLY RATES
EFFECTIVE JULY 1, 19]]
Per
Hour
Registered Land Surveyor
Draftsman
10.00
Engineering Technican
14.00
-
Mathematician - Computer
15.00
Party Chief
15.00
Instrument Man
10.00
Rodman - Axeman
8.00
Clerical
7.00
Electronic Distance Machine
(if needed) 28.00
per day
Chain Saw (if needed)
2.00
per day
Hoke: Iran rods, stakes, at
cast expenses, in
addition to
hourly charges.
S
7 ,
AN6REW J.$HYKA
August 4, 1977
John Frawley, City Engineer
City Hall
73 Harlow St.
Bangor, ME 04401
RE: Judson Height's Subdivision
Dear John:
I would like to submit a proposal for survey work to be
done prior the construction project continuing Judson
Boulevard and the new layout of Castle Hill and Lasalle
Drive.
WORK TO BE DOBE:
1) Construction hubs set at 50 feet intervals on both
sides of the roadway to be built. 1
2) Lists of elevations of the tops of these hubs would
be submitted to your office. -
3) Bench marks would be established within the project
area at convenient locations.
This work would be billed at a per -hour basis. Please
see enclosed fee schedule. -
It is my estimate that the 1800 linear feet of roadway
that would be established and staked with corresponding
elevations on stakes would cost about $1,620.
Thank you for the opportunity to submit this proposal.
Very truly yours,
Andrew J. Shyka
AJS/fpa -
I99 EXCHANGE STREET
eA1OOC MAINE 04401
SCHEDULE OF HOURLY RATES
EFFECTIVE JULY 1, 1977
Per
Hour
Registered Land Surveyor
$20.00
Draftsman
10.00
Engineering Technican
14.00
Mathematician - Computer
15.00
Party Chief -
15.00
Instrument Man
70.00
Rodman - Axeman
8.00
Clerical
7.00
Electronic Distance Machine
(if needed) 25.00
per day
Chaim Saw (if needed)
2.00
per day
Note: Iron rods, stakes, at
cost expenses, in
addition to
hourly charges.