Loading...
HomeMy WebLinkAbout1977-08-08 347 AE ORDER347 AE Introduced by Councffor swiss, August e, 1577 CITY OF BANGOR (nTLE) @rjigT,.Directing City Engineer to Make Cost Study - Sawyer Subdivision Improvements on Husson Avenue By My CMMU of Oo 04Y Maomwe.: ORDERED. TUT the attached Petition from Warren C. Sawyer requesting a study to determine the cost of constructing roads and sewers as shown on his approved Subdivision Plan for the southerly side of Hutson Avenue be and hereby is accepted, and be it further ORDERED, that the City Engineer conduct the necessary surveys, prepare plans and cost estimates, together with a list of possible assessments for said construction, and report his findings to the City Council for further action. IN CSM CWMIL Aughat 8, 1977 � 'P85sed.' CITY C 347 AN f RECEIVED CITY OF SANCOR CITY CLERICS OFFIOE °77 AH 4 PB 3 31 RECEIVED CITY OF SANCOR CITY CLERICS OFFIOE °77 AH 4 PB 3 31 WARREN C. SAWYER 49 My VIEW DRIVE SWAMPSCOn, MASSACHUSEM 01907 OM 59}9449 July 30, 1977 Mr. ?John Frawley City Engineer Bangor City Hall Bangor, Maine 04401 Dear John, As you know the Planning Hoard and the City Council have approved a subdivision of land on Hudson Avenue and Kenduskeag. This division requires an increase of sewerage, water, drainage and two short streets. Would you be kind enough to estimate the cost of the sewerage, drawinage and streets and determine our part of the cost. If you need any further information, please give me a call. Yours sincerely, W QM^ Warren C. Bowyer Jba cc: Orman Twitchell Ken Wash Ereative Development and Inveem em in Real Esran, Sensitive to Homan and Nawral Environment