HomeMy WebLinkAbout1977-08-08 347 AE ORDER347 AE
Introduced by Councffor swiss, August e, 1577
CITY OF BANGOR
(nTLE) @rjigT,.Directing City Engineer to Make Cost Study -
Sawyer Subdivision Improvements on Husson Avenue
By My CMMU of Oo 04Y Maomwe.:
ORDERED.
TUT the attached Petition from Warren C. Sawyer requesting
a study to determine the cost of constructing roads and sewers
as shown on his approved Subdivision Plan for the southerly side
of Hutson Avenue be and hereby is accepted, and be it further
ORDERED, that the City Engineer conduct the necessary
surveys, prepare plans and cost estimates, together with a list
of possible assessments for said construction, and report his
findings to the City Council for further action.
IN CSM CWMIL
Aughat 8, 1977
� 'P85sed.'
CITY C
347 AN
f
RECEIVED
CITY OF SANCOR
CITY CLERICS OFFIOE
°77 AH 4 PB 3 31
RECEIVED
CITY OF SANCOR
CITY CLERICS OFFIOE
°77 AH 4 PB 3 31
WARREN C. SAWYER 49 My VIEW DRIVE
SWAMPSCOn, MASSACHUSEM 01907
OM 59}9449
July 30, 1977
Mr. ?John Frawley
City Engineer
Bangor City Hall
Bangor, Maine 04401
Dear John,
As you know the Planning Hoard and the
City Council have approved a subdivision of
land on Hudson Avenue and Kenduskeag. This
division requires an increase of sewerage,
water, drainage and two short streets.
Would you be kind enough to estimate the
cost of the sewerage, drawinage and streets
and determine our part of the cost.
If you need any further information,
please give me a call.
Yours sincerely,
W QM^
Warren C. Bowyer
Jba
cc: Orman Twitchell
Ken Wash
Ereative Development and Inveem em in Real Esran, Sensitive to Homan and Nawral Environment