HomeMy WebLinkAbout1977-06-13 252 AE ORDERIntroduced by Councilor Gass, Jane 13, 1577
CITY OF BANGOR
(jijLE,) asrbgra_ Directing C3.ty_Fxtgineer_to_Meke Cost Study Dunning
Boulevard Sanitary Sewer Extension ,
_._....._. .._....... .............. .................. ................
By My paaaaa of the pity efBaagor.
ORDERED,
MT the attached petition from Richaar3 P. Haney, Sr.
requesting a study to determine the cost of extending the
existing sewer on Dunning Boulevard be and hereby is. accepted,
and be it further
ORDERED, that the City Engineer conduct the necessary
surveys and prepare Kenn and cost estimates, together with
a list of possible assessments, end report his findings to
the City Council for furtherAction.
252 M
Sil
U CITY COUNCIL -
dwe:13, 1977 ,
Passed 3q3
,pp 0RDRR
C' n_ Title,
Oic CttY Eng;,to M ke Wat Studq�:
Ownfn� Blvd. Sanitary Saxer ext. '
Intrad ed ed by
ovnci�n
1
RECEIVED
CITY OF S..4.1:OR
. CITY CIERR'C CPiICE
IT JJjI 'I AYI 11 42
May 26, 1997
I . John Frawley,
City Engineer
City o4 Bangor
Ringer, Maine 04401
A4. Frawley,
I would like to request the city to do a study to determine the cost of extending
the existing seuer to service the lot described on Map R-25 Lot look
of the assessor and.
bin rely
R
R" d P y Sr. e
BPR/isl y
Richard P. Raney Sr
25 winter Street
R angor, Maine 04401