Loading...
HomeMy WebLinkAbout1978-03-27 176 AF ORDER1]e RF Introduced by Councilar zendzian, 19rch 27, 1978 CITY OF BANGOR (TITLE.) V0rUr AUCnorrzing Construction of Sanitary Sewer on Road BY the aft Coaun(ofthe Oft of Bacpo ORDERED, THAT WAEP;EAS, the State Department of Transportation is preparing to undertake the reconstruction of Hogan Road between Interstate Highway I-95 and Stillwater Avenue, and WHEREAS, sanitary sewer service does not presently exist along most of the roadway which is to be reconstructed, and WHEREAS, State law prohibits the opening of a newly constructed roadway for a period of 5 years after construction, and WHEREAS, the majority of the property owners abutting Hogan Road have indicated that they are in favor of the sewer installation, NOW, THEREFORE, be it ORDERED, that the attached report of the City Engineer showing the estimated cost and possible assessments for the installation of approximately 14'7(1feet of sanitary sewer on Rogan Road be and hereby is accepted, and be it further ORDERED, that the sum of $30,000.00 be transferred from the Reserve for Future Construction - Sewer Account to cover the cost of said construction, and be it further ORDERED, that said sewer be installed as soon as possible.. ORDER Title, In City CounciligfU Narob 2911998 Teased ,:. Au4bu Wne.CwwSnwtlon .CC.Sanitap .`:!"�;, ., U.: ... saner on edea° Rosa 'rce 4 ,! City Clerk Introduced and filed by. W� ...... ...•Councilman _ t CITY OF BANGOR, MAINE Engineering Department March 23, 1978 To the Municipal Officers: In accordance with City Council Order No. 408 AE passed October 24, 1977, directing the City Engineer to determine the cost of installing sanitary sewer service on Hogan Road, the following report is submitted: _ The proposed installation would include 1,470 feet of 8 inch sanitary sewer pipe and 4 manholes, serving the entire area between Interstate Highway.I-95 and the westerly line of the E -Mart property. The total estimated cost of sewer instal- lation is 629,310.00, of which the City would pay 50%, and the remaining 614,655.00 would be assessed proportionately against the properties benefited, as follows: Name Frontage Est. Assessment EAST SIDE - - Springer Realty Corp. (Webber Petroleum) 695 feet 6 3,452.61 In Favor Hogan Realty Co. 310 feet 1,540.02 In Favor Maine Square Corp. 150 feet 745.17 In Favor Irving E. Inman 160 feet 794.85 No Reply Maine Square Corb. (under Option) 160 feet 794.85 In favor WEST SIDE Bert L. Wolstein (E -Mart) Nan -assessable 79327.50 TOTAL - $14,655.00 The property on the westerly side of Hogan Road, most of which is occupiedLbY the E -Mart, is non -assessable, since the N -Mart paid a previous assessment for the existing sewer which extends in a westerly direction from their property to Still- water Avenue. -1- Since the State Department of Transportation is planning to start reconstruction of the roadway within the next month it is considered imperative that the sewer installation begin as soon as possible. It is further recommended that all of the proposed assessments be levied upon completion of the sewer installation. Plana of the proposed sewer installation are on file in the office of the City Engineer. 1Respectfully submitted, 4S—Gt z.r-�-I City Engineer -2-