HomeMy WebLinkAbout1977-12-12 67 AF ORDERIntroduced by Councilor Willey, December 12, 1977
V CITY OF BANGOR
(TITS) (J@rbrr_ Authorizing. the 1.City Meager to Fater into the
Attached Agreement with the State Department of Transportation- -
By the City Cowwd of the City of Baster.
roaowo�u
THAT the City Manager be and hereby is authorized to enter
into the attached Agreement with the State Department of Trans-
portation regarding the proposed improvements and future main-
tenance of the Hogan Road improvements to be constructed next
year, between Sylvan Road and Stillwater Avenue.-
f
IN CITY CWNCIL 67 AF g
Cenembei 12, 1977 1
Passed
u CIW CLENN Title, -
Anthoclzlnq me city esga{ei co egce: RECEIVED
CITY OF U.14COR
into the Attached Aq�en nt 2; h cht, CITY CLERK 3 CMOE
$tate D ment Of 1Teneportation Hogan
Hoed Imp�oveorementaqledby °n DEC c rrl i sa
41�
douneilman
Bangor 0-1490(1)
October 31, 1999
Page 1 of 6 Pegea
A GRBENENT
THIS AGREEMENT, made this _ day of I , 1997, by aryl between the State of
Isaias acting by aed through its Department of Traoaportation, hereinafter referred to as the
State ard the City of Bangor, Penobscot County: a body corporate, by now through its City
Manager, hereinafter referred to as the City.
Witnesseth, That
WHEREAS, The City has requested reconstruction of a portion of the Hagen Road (S.E. 299) and
has deposited with the State certain funds as evidence of its intention to participate in
a share of the costs;. and
WHEPEAS, the State baa received said funds and is willing to reconstruct Hogan Road as a
Federally Aided Project with the non-federal share being paid by the City;'
NOW THEREROTSE, the parties oncree as follows:
1. The State agrees to do the following: _
A. To award a contract and reconstruct Hogan Road under Federal Aid Project No.
M-1490(1), hereinafter referred to as the Project, substantially in accorlarmee
with the plans prepared by the State bad generally described as follows:
The proposed project, consisting of two "Sections", provides for the widening
of Hogan Reed, construction of a raised median and taming lanes, improvements
to the Interstate Ramps, and the installation of traffic signals. "Section 1"
begins about MO Peet southerly of the Sylvan Road at Station I86+00 and extends
1134' northerly to Station 199+34. From the beginning of the Project to Station
190+00, the roadway, will be widened to two 12 foot travel lanes with 10 foot
paved shoulders. p Station 190+00 northerly to Station 199+34, the roadway
will be gradually widened to provide two 12 foot travel: inside, two 12 foot
tuning lanes and 8 foot paved shoulders sadthen will toper down to match the
existing width of Hogan Rand Bridge at $to. 199+34..
4
Bangor H-1490(1)
October 31, 1979
Page 2 of 6 Pages
"Sectorn 2" begins at Station 203+88 and curtails northerly 2189 feet to
Station 223+95. The first part of this section will be widened to 81 feet.
This width will provide two 12 foot travel lane in each direction a variable
width needier, two B foot paved shoulders, and 10 foot left tum lanes where
necessary. The raised median throughoutthin developed area. will vary: in width,
......with traneistions in width where left torn ldnes and required.
The remainder. of Section 2 will be tapered down to match into the existing read -
way width.
The approaches of all four interstate reaps will be widened to provide improved
traffic movements. 'The triangular islands at the intersection of Hogan Road
add the northbound end southbound "on ramps will be removed and the ielaods at
the "off' rare will be enlarged. Portions of each reap and its shoulders will
be repaved. Curbing will be placed around the traffic islands, the median, and
at larger entranced to developed properties. Traffic Signals will be placed at
the Interstate Hamp intersections and at the intersection of the new shopping
center entrance. The entire length of the project consisting of the two
sections is 0.629 builds.
B. To construct a drainage system adequate to handle all noamnl Surface and aub-
surface water for the entire project, and to connect this drainage system into
the existing systems, eliminating any drainage structures deemed uweceseary
as part of 'the Projecti.
0. To acquire slLlarlB®]sadl.nighte L91aad_meoessary: to construct, the':project:
D. To install and interconnect the following traffic signals:
(1). Bogen Road and the Interstate northboucd'"off"ramp:..
(2). Hogan Road and, the Interstate eaathbovnd "off" remp.
(3). Bogen Road and the new shopping center entrance.
Banger I4-1490(1)
October 31, 1977
Page 3 of 6 Pages
E. To accept as partial payment of the non -Federal Share for the project, the
$45,000 already paid by the City to the State.
F. To maintain the project in accordance with appropriate statutes, policies and
agreements, accept as provided in Article "II, D, and E" below under "The City
Agrees".
II. The City agrees to do the following:
A. To approve the construction of Federal Aid Project N-1490(1) described 1n
Item 1 above ander "The State Agrees", within the project limits as set forth
in this agreement and ea shown on the plana provided by the State.
E. To pay to the State at the time of the sward of contract the remainder of the
estimated nen-Federal Share based upon the bid price of the contract.
C. Upon completion of the Project to paw to or receive Prem the State, that amount
of funds which represents the difference between the actual coats end amount
.:..Already Pefd',of the non -Federal Share.
D. To Swoons all future maintenance wood power costa for street lighting providing
an intensity of approxnaately 0.4 foot candles, near the shopping center
entrances and tapering the intensity to 0.2 foot candles for the remainder of
the Project.
E. To issues all future maintenance end power Coate of the traffic signals as
described in Article 1..D above order the State Agrees, repairing aWOr
replacing all parts and to expeditiously correct any defi-
ciency in the signal eystem when required end to obtain the permission of the
State before altering cold signal systems in operation or physical aspect.
F. To pass such ordinances as may be required to prohibit panting within the
entire limits of the project including the area located between "Section 1"
end "Section 2" ae referenced in the general project description.
Sandra M-1490(1)
October 31, 1977
Page 4 of 6 Pages
G. To pees such City ordinances as pay be required to control ell entrance$ t0
the highway constructed as part of this project or as may be constructed in
the future in accordance with Title 23, M.A.S.A., Section 704 or as may be
amended.
H. To eliminate and prohibit disposal of any open eewege within the limits of
the Project.
I. To make such change$ within the City fire clause system, city sew , city
water, and city street lighting, including service connections and marbole
adjustments and other City owned and maintained utility fixtures (i£ existing)
without papoose to the State as'may be required as a result of the Project.
Any changed made during the construction of the Project will be coordinated
with the contractors operations.
J. To spends all claims for damages to private underground utility -type instal-
lation wherever the locations may not be shown on the plane for this project;
also to be responsible for the removal, replacement, alteration, or relocation
of any counting private underground utility -type installation (such as wired,
water, sewer, drain pipes) as may be necessary to permit construction of the
Project within the previously described project limits.
K. To be responsible for (where the control of utilities using the highways is
delegated to the City) and to notify all utilities that, except in the case of
day emergency, no earvrce opening permits for opening any pavement within the
limits Of the proposed project will be issued for a period of five (5) years
from the date of completion of the Project.
1. To regulate (where the control of utilities using the highways is delegated
to the City) the use by all public and private utilities of ary portion Of
the highway within. the Project in accordance with the rules, regulations
and policies applied by the State in its control of utility use of highways.
Bangor M-1490(1)
October 31, 1977
Page 5 of 6 Pages
M. To make the attached "Backfilling Requirements" a part of all service opening
permits for work within the limits of the Project.
ff. To bold inviolate the right of way for the Project and agree that an diver -
tieing signs, posters, billboards, roadside stands or other private instal-
lation shall be permitted within the Said right of way limits and any such
befor®enti®ed items now within the liaits of the existing right of way shall
be rived by or under direction of the City.
ATTACHMMT:
Backfilling RequireMente.
Danger M-1490(1)
October 31, 1977
Page 6 of 6 Pages
IN MWESS WID 7 TF1:•.' PARTIES TO THIS AGROMIZE1T HAVE MCUTED IN TRIPLICATE these presents
on the day end year first shore writtn, the State of Mein by its Co®ieeioner of the
Department of TrnaOXtatin, hereunto duly authorized, and the City of Hangar by its City
Manger duly authorized by Council Order dated an
attested true Copy being attached hereto and made a part hereof.
SIGNED, SEALID AND DELIVERED STATE OF MAINE
M TEE PRESENCE OF: - DEPARTMENT OF TRANSFGRTATION
Ey Commissioner
Roger L. Mallar
City of Bangor
Ry city manager
APPROVER AS TO FORM:
Assistant Attorney General
BACKFILLING REWIRIVIl s
Backfill material shall be flue, readily suppressible soil or promoter material, at or near
_Mthous, moisture content, and aball not contain stones larger than 3 inches, Procan lumps,
choose of clay, mineral matter or aay other objectionable material. The material shell be
uniformly distributed in layers of not More than 8 inches, loose measure and each laver
thoroughly cortaeted by use of approved compaction before successive layers are placed.
When backfill is being placed aro,Nd a pipe or structure, operations shall be so coMucted
that the fill is always at approximately the pope elevation on both sides of the structure.
Water shall be added when necessary to increase the moisture content of the backfill
material to obtain compaction. Puddling or jetting of backfill will not be allowed.
All sheeting and bracing used during sm ovation shall be removed by the utility follow-
ing the completion of the work, ,d all
coal voids resulting from the use of the sheeting and
bracing backfilled where necessary unless otherwise directed by the 'Department!:s' Engineer.